Tech Center 2800 • Art Units: 2117 2194 2852 2855 2857 2863
This examiner grants 0% of resolved cases
Mostofa Ahmed Hisham is an examiner in Tech Center 2800 and Art Unit 2117. The data is based on 2 resolved cases, which is the current sample size. Currently, the allowance rate is 0.0 percent, and the interview lift is also 0.0 percent. The median days to allowance is 1056, though this figure is derived from the limited number of outcomes available. These early metrics provide a starting point for understanding the examiner's work, but they should be interpreted with caution due to the 2 resolved cases.
Because the resolved case count is 2, these percentages may not reflect long-term trends or the examiner's typical approach. Practitioners should monitor future resolutions to see if the 0.0 percent allowance rate or the 0.0 percent lift from interviews changes as the examiner gains more experience in this art unit. The 1056-day median pendency offers a preliminary look at the timeline, but it is likely to evolve as more applications reach a final decision. For now, the data suggests a specific outcome for the 2 cases resolved, but the small sample size means that future performance could differ significantly. The 1056-day median remains the primary benchmark for pendency in Art Unit 2117.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18709436 | DETERMINATION OF A CRYSTALLOGRAPHIC ORIENTATION OF A SURFACE OF A COMPONENT OF AN AIRCRAFT | Non-Final OA | SAFRAN |
| 18591055 | INSPECTION SYSTEM | Non-Final OA | SUBARU CORPORATION |
| 18459009 | RUNNING ANALYSIS SYSTEM AND RUNNING ANALYSIS METHOD | Final Rejection | ASICS CORPORATION |
| 18533228 | CONSTRUCTION INSPECTION METHOD, APPARATUS, AND SYSTEM | Non-Final OA | DAIKIN INDUSTRIES, LTD. |
| 18623272 | METHOD FOR ADJUSTING A NOISE GENERATED BY A DEVICE | Non-Final OA | Robert Bosch GmbH |
| 18684852 | INSPECTION DEVICE AND INSPECTION METHOD | Non-Final OA | Mitsubishi Electric Corporation |
| 18558486 | SOIL QUALITY INFORMATION ACQUISITION SYSTEM AND WORK MACHINE PROVIDED WITH SAME | Final Rejection | KOBELCO CONSTRUCTION MACHINERY CO., LTD. |
| 18686188 | METHOD FOR PROVIDING INFORMATION, ANALYSIS SYSTEM AND PROGRAM | Non-Final OA | SHIMADZU CORPORATION |
| 18558592 | IMPROVEMENTS TO PEAK INTEGRATION BY INTEGRATION PARAMETER ITERATION | Non-Final OA | DH Technologies Development Pte. Ltd. |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy