Prosecution Insights
Last updated: May 29, 2026

Examiner: MINTZ, RODNEY K

Tech Center 3600 • Art Units: 3633 3635

This examiner grants 79% of resolved cases

Performance Statistics

78.8%
Allow Rate
+26.8% vs TC avg
954
Total Applications
+10.9%
Interview Lift
657
Avg Prosecution Days
Based on 938 resolved cases, 2023–2026

Rejection Statute Breakdown

0.2%
§101 Eligibility
12.9%
§102 Novelty
53.7%
§103 Obviousness
8.7%
§112 Clarity

Currently Pending Office Actions

App #TitleStatusAssignee
18818899 ROOFING DRIP EDGE DEVICE AND A METHOD OF INSTALLING A ROOFING DRIP EDGE DEVICE Non-Final OA BMIC LLC
18709959 SET OF PARTS FOR INSTALLING A FLOOR COVERING Non-Final OA UNILIN, BV
18685007 CLIMBING CRANE FOR ERECTING A WIND TURBINE AND METHOD FOR ERECTING A WIND TURBINE WITH A CLIMBING CRANE Non-Final OA Siemens Gamesa Renewable Energy Innovation & Technology S.L.
18788412 SYSTEM AND METHOD FOR CONTINUOUS TRUSS MOUNTED TRACK SYSTEM Non-Final OA Tyler Truss LLC
18725811 PRECAST CONCRETE REINFORCING BLOCK ASSEMBLY FOR SEISMIC STRENGTHENING AND METHOD FOR CONSTRUCTING SAME Non-Final OA ARISU ENGINEERING CO., LTD.
18204327 WALL STRUCTURES OF EXTRUDABLE BUILDING MATERIAL Non-Final OA ICON Technology, Inc.
18667411 Cladding system Non-Final OA Importations A1 Inc.
18470775 PREASSEMBLED HOLDOWN POST Non-Final OA Simpson Strong-Tie Company Inc.
18515022 PREFABRICATED BUILDING SYSTEM AND METHODS Final Rejection Quattrocchi Kwok Architects
18328969 CLADDING INSTALLATION SYSTEM Final Rejection Keystone Lintels Limited
18248236 MODULARIZED ENCLOSED STRUCTURES Final Rejection COMPONENT CONSTRUCTION SYSTEMS LLC

Facing This Examiner?

IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.

Build Your Strategy

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month