Listed by the USPTO as PARK, CHONGSUH
Tech Center 4100 • Art Units: 2154 2156 2478 2649 4100
This examiner grants 60% of resolved cases
Examiner Chongsuh Park is part of Tech Center 4100 and Art Unit 2154. The data reflects 112 resolved cases with an allowance rate of 59.8 percent. This allowance rate is higher than the interview lift of 18.2 percent. The median days to allowance for these matters is 1194.
The 59.8 percent allowance rate serves as the baseline for the 112 resolved cases in this record. An interview lift of 18.2 percent provides a metric for the impact of examiner interviews on the likelihood of reaching a grant. Applicants should consider the 1194 median days to allowance when planning their long-term prosecution strategy in this art unit.
Top companies in this examiner's portfolio include Qualcomm Incorporated, Lenovo (United States) Inc., and Samsung Electronics Co., Ltd. Firms such as Harrity & Harrity, LLP \ Qualcomm, Kunzler Needham Hilton - Lenovo, and SUGHRUE MION, PLLC represent these applicants. These entities operate within an environment defined by the 59.8 percent allowance rate and the 1194-day median pendency.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18934047 | METHOD AND APPARATUS FOR TRANSMISSION AND RECEPTION OF REFERENCE SIGNAL IN WIRELESS COMMUNICATION SYSTEM | Non-Final OA | SAMSUNG ELECTRONICS CO., LTD. |
| 18722447 | METHOD AND APPARATUS FOR SUPPORTING AERIAL UE IN NEXT GENERATION MOBILE COMMUNICATION | Final Rejection | SAMSUNG ELECTRONICS CO., LTD. |
| 18733282 | ELECTRONIC DEVICE AND METHOD FOR OPERATING THE SAME | Final Rejection | SAMSUNG ELECTRONICS CO., LTD. |
| 18898483 | Coordinated Channel Access in Wireless Communication Systems | Non-Final OA | Apple Inc. |
| 18866455 | METHOD FOR RESOURCES UTILIZATION OF NETWORK SLICES | Non-Final OA | Google LLC |
| 18887890 | Advanced Beamforming and Transmission Techniques for MIMO URLLC Applications | Non-Final OA | Huawei Technologies Co., Ltd. |
| 18903595 | IAB-DONOR DEVICE AND TRANSPORT ADDRESS CONFIGURATION METHOD | Non-Final OA | FUJITSU LIMITED |
| 18862597 | CHANNEL ACCESS SELECTION FOR PHYSICAL SIDELINK FEEDBACK CHANNEL (PSFCH) COMMUNICATIONS IN UNLICENSED BANDS | Non-Final OA | QUALCOMM Incorporated |
| 18903526 | DATA COLLECTION FOR RADIO FREQUENCY SENSING | Non-Final OA | QUALCOMM Incorporated |
| 18887909 | NETWORK CODING AND SEGMENTATION FOR PACKET DATA CONVERGENCE PROTOCOL COMMUNICATIONS | Non-Final OA | QUALCOMM Incorporated |
| 18792200 | TRAFFIC ESTIMATION AND WIRELESS ACTIONS BASED ON WIRELESS TRAFFIC INGRESS RATES | Final Rejection | QUALCOMM Incorporated |
| 18728274 | BEAM APPLICATION TIME WITH BANDWIDTH PART SWITCHING IN WIRELESS COMMUNICATIONS | Final Rejection | QUALCOMM Incorporated |
| 18768819 | USER-EQUIPMENT-SELECTED MEASUREMENT GAP SCHEDULING CONFIGURATION | Final Rejection | QUALCOMM Incorporated |
| 18737823 | FREQUENCY MODULATED CONTINUOUS WAVE BASED SYNCHRONIZATION SIGNAL | Final Rejection | QUALCOMM Incorporated |
| 18652357 | FEEDBACK ASSOCIATED WITH MULTIPLE INCREMENTAL REDUNDANCY SCHEME COMMUNICATIONS | Final Rejection | QUALCOMM Incorporated |
| 18642114 | TECHNIQUES FOR RANDOM ACCESS CHANNEL OCCASION CONFIGURATION FOR MULTI-PANEL COMMUNICATION | Final Rejection | QUALCOMM Incorporated |
| 18608062 | LOW-POWER WAKE-UP RECEIVER ANTENNA PORTS FOR RECEPTION OF CHANNEL STATE INFORMATION REFERENCE SIGNAL | Non-Final OA | QUALCOMM Incorporated |
| 18708167 | TERMINAL AND COMMUNICATION METHOD | Final Rejection | NTT DOCOMO, INC. |
| 18726545 | METHOD AND APPARATUS FOR WIRELESS COMMUNICATION | Final Rejection | LENOVO (BEIJING) LIMITED |
| 18718399 | WAKE UP SIGNAL FOR UPLINK TRANSMISSION | Final Rejection | LENOVO (BEIJING) LIMITED |
| 18750861 | TECHNIQUES FOR SESSION MANAGEMENT SIGNALING FOR PARTIAL NETWORK SLICE SUPPORT IN A REGISTRATION AREA | Final Rejection | Lenovo (Singapore) Pte. Ltd. |
| 18862789 | METHOD FOR SUPPORTING DETERMINISTIC NETWORKS IN A WIRELESS COMMUNICATIONS NETWORK | Non-Final OA | Lenovo (Singapore) Pte. Limited |
| 18792059 | METHOD AND DEVICE FOR SATELLITE SWITCHING IN NON-TERRESTRIAL NETWORK | Final Rejection | SHARP KABUSHIKI KAISHA |
| 18783881 | METHODS, APPARATUSES AND SYSTEMS RELATED TO SUB-ARRAY SELECTION FOR NEAR-FIELD UPLINK | Non-Final OA | InterDigital Patent Holdings, Inc. |
| 18697051 | ROBUST BWP APPROACHES TO MITIGATE THE IMPACT OF HIGH POWER NARROW-BAND INTERFERER | Final Rejection | INTERDIGITAL PATENT HOLDINGS, INC. |
| 18866964 | MANAGING CENTRAL UNIT FAILURE | Non-Final OA | Nokia Technologies Oy |
| 18941381 | TERMINAL DEVICE AND METHOD FOR MEASUREMENT EVALUATION IN WIRELESS COMMUNICATION SYSTEMS | Non-Final OA | Nokia Technologies Oy |
| 18903516 | CHANNEL FEATURE INFORMATION TRANSMISSION METHOD AND APPARATUS, TERMINAL, AND NETWORK SIDE DEVICE | Non-Final OA | VIVO MOBILE COMMUNICATION CO., LTD. |
| 18768637 | RESOURCE DETERMINING METHOD, RESOURCE MONITORING METHOD, APPARATUS, DEVICE, AND STORAGE MEDIUM | Final Rejection | VIVO MOBILE COMMUNICATION CO., LTD. |
| 18860632 | MEASUREMENT FEEDBACK METHOD AND APPARATUS, AND STORAGE MEDIUM | Non-Final OA | DATANG MOBILE COMMUNICATIONS EQUIPMENT CO.,LTD. |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy59.8% of resolved applications examined by Chongsuh Park were allowed (112 resolved cases), compared with 67.7% across Art Unit 2154 over the last five years.
This examiner's interview lift is +18.2 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Chongsuh Park took 1,194 days on average from filing to allowance.
Chongsuh Park examines applications in Art Unit 2154 in Tech Center 4100.