Tech Center 1700 • Art Units: 1772 1773 1775 1776 1797
This examiner grants 70% of resolved cases
Examiner SHUMATE, ANTHONY R is assigned to Tech Center 1700 and Art Unit 1772. The examiner has handled 720 resolved cases. The allowance rate for these applications is 69.9 percent. The median time to allowance is 1033 days, which provides a benchmark for the expected duration of the prosecution process. This 1033-day figure is a central metric for applicants to use when planning their timelines in this unit.
The interview lift is 14.3 percent, which indicates that interviews are associated with an increase in the likelihood of allowance. This 14.3 percent lift is smaller than the 69.9 percent baseline allowance rate, but it still represents an impact on the prosecution outcome. With 720 resolved cases, the 1033-day median and the 14.3 percent lift provide a statistical foundation for practitioners in Art Unit 1772 within Tech Center 1700.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18588463 | CONCENTRATION CONTROL DEVICE, RAW MATERIAL VAPORIZATION SYSTEM, CONCENTRATION CONTROL METHOD, AND RECORDING MEDIUM STORING CONCENTRATION CONTROL PROGRAM | Non-Final OA | HORIBA STEC, Co., Ltd. |
| 18616853 | ALGINATE-BASED ATMOSPHERIC WATER HARVESTERS | Non-Final OA | Khalifa University of Science and Technology |
| 18026503 | SEPARATION MEMBRANE, SEPARATION MEMBRANE MANUFACTURING METHOD, AND COATING LIQUID FOR MANUFACTURING SEPARATION MEMBRANE | Final Rejection | NITTO DENKO CORPORATION |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy