Prosecution Insights
Last updated: May 29, 2026
Application No. 18/033,220

Apparatuses and Methods for Scheduling Resources

Non-Final OA §102
Filed
Apr 21, 2023
Priority
Oct 26, 2020 — nonprovisional of PCTEP2020080054
Examiner
ACOLATSE, KODZOVI
Art Unit
2478
Tech Center
2400 — Computer Networks
Assignee
Telefonaktiebolaget Lm Ericsson (Publ)
OA Round
3 (Non-Final)
84%
Grant Probability
Favorable
3-4
OA Rounds
0m
Est. Remaining
99%
With Interview

Examiner Intelligence

Grants 84% — above average
84%
Career Allowance Rate
774 granted / 926 resolved
+25.6% vs TC avg
Strong +22% interview lift
Without
With
+21.5%
Interview Lift
resolved cases with interview
Typical timeline
2y 6m
Avg Prosecution
33 currently pending
Career history
977
Total Applications
across all art units

Statute-Specific Performance

§101
0.5%
-39.5% vs TC avg
§103
85.4%
+45.4% vs TC avg
§102
11.7%
-28.3% vs TC avg
§112
0.9%
-39.1% vs TC avg
Black line = Tech Center average estimate • Based on career data from 926 resolved cases

Office Action

§102
DETAILED ACTION Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Claims 95-114 are pending in this office action. Response to Arguments Applicant's arguments filed 11/12/2025 have been fully considered but they are not persuasive. The reasons set forth below. Applicant Argues: On pages 8-9 of the remarks, Applicant argues the coordinator UE 550A may receive BSRs from other UEs in a group, as alleged by the Office Action, but the coordinator UE 550A does not "schedule them based on their BSRs," as alleged by the Office Action. Instead, coordinator UE 550A aggregates the BSR reports and sends them to network device 510. It is the network device that then takes action based on the aggregate BSR reports. The cited portions of Novlan disclose that one action taken by network device 510 is allocating more resources to the UEs. There is no disclosure in the cited portions of Novlan, however, that coordinator UE 550 performs scheduling, as alleged by the Office Action, therefore Novlan fails to disclose "scheduling, based on the monitored demand for the group-shared UL resources, the configured group-shared UL resources to at least one UE within the group of UEs," as recited in independent claim 95. Therefore, Novlan fails to disclose every element of claim 95. In response, the Examiner respectfully submits: Novlan teaches in Fig. 7:704 and [0055] At 704, example method 700 can communicate, by the network device to a first user equipment device of the group of user equipment devices (e.g., UE 550A receives resource allocation from network device 510), first information corresponding to the first group of resources, the first user equipment device being a local manager of the group, that can communicate second information corresponding to a second group of resources, based on the first information (e.g., UE 550A can generate resource allocations based on the allocations received from network device 510), to respective other user equipment devices of the group of user equipment devices (e.g., UEs 550B-C). On can clearly see that indeed the local manager UE 550A does perform resource allocation to other UEs. Claim Rejections - 35 USC § 102 The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that form the basis for the rejections under this section made in this Office action: A person shall be entitled to a patent unless – (a)(2) the claimed invention was described in a patent issued under section 151, or in an application for patent published or deemed published under section 122(b), in which the patent or application, as the case may be, names another inventor and was effectively filed before the effective filing date of the claimed invention. Claims 95-114 are rejected under 35 U.S.C. 102(a)(2) as being anticipated by Novlan et al (US 2020/0229192 A1). Regarding claim 95, Novlan teaches a method in a coordinator User Equipment, UE, for scheduling resources for a group of UEs in a wireless communications system, the method comprising: - receiving, from a Radio Access Network, RAN, node a configuration configuring at least the coordinator UE with group-shared Uplink, UL, resources and Sidelink, SL, resources to be used by the group of UEs, and wherein the configuration further indicates that the coordinator UE coordinates scheduling of the group-shared UL resources (Novlan: Figs. 5, 7 and 8, [0055], UE 550A local manager/coordinator, receives resources from the network device 510/RAN node); - monitoring a demand for the group-shared UL resources by at least one UE within the group of UEs; and scheduling, based on the monitored demand for the group-shared UL resources, the configured group-shared UL resources to at least one UE within the group of UEs (Novlan: Figs. 5, 7 and 8; [0045]-[0046], [0060] UE 550a monitors BSRs from other UEs in a group and schedules them based on their BSRs). Regarding claim 108, Novlan teaches a method in a Radio Access Network, RAN, node for scheduling and/or allocating resources for a group of UEs in a wireless communications system, the method comprising: - transmitting, to a coordinator User Equipment, UE, a configuration configuring at least the coordinator UE with group-shared Uplink, UL, resources and Sidelink, SL, resources to be used by the group of UEs, and wherein the configuration further indicates that the coordinator UE coordinates scheduling of the group-shared UL resources (Novlan: Figs. 5, 7 and 8, [0055], UE 550A local manager/coordinator, receives resources from the network device 510/RAN node). Regarding claim 110, Novlan teaches a method in a User Equipment, UE, within a group of UEs for receiving resources scheduled for the group of UEs in a wireless communications system, the method comprising: - receiving, from a Radio Access Network, RAN node or from a coordinator UE, a configuration configuring the UE with Sidelink, SL, resources to be used by the group of UEs, and configuring the UE that the coordinator UE coordinates scheduling of group-shared UL resources (Novlan: Figs. 5, 7 and 8, [0055], UE 550A local manager/coordinator, receives resources from the network device 510/RAN node). Regarding claim 114, Novlan teaches a coordinator User Equipment, UE, configured for scheduling resources for a group of UEs in a wireless communications system, wherein the coordinator UE comprises: - a processing circuitry; and - a memory circuitry storing computer program code which, when run in the processing circuitry, causes the coordinator UE to: - receive, from a Radio Access Network, RAN, node, a configuration configuring at least the coordinator UE with group-shared Uplink, UL, resources and Sidelink, SL, resources to be used by the group of UEs, and wherein the configuration further indicates that the coordinator UE coordinates scheduling of the group-shared UL resources (Novlan: Figs. 5, 7 and 8, [0055], UE 550A local manager/coordinator, receives resources from the network device 510/RAN node); - monitor a demand for the group-shared UL resources by at least one UE within the group UEs; and - schedule, based on the monitored demand for the group-shared UL resources, the configured group-shared UL resources to at least one UE within the group of UEs (Novlan: Figs. 5, 7 and 8; [0045]-[0046], [0060] UE 550a monitors BSRs from other UEs in a group and schedules them based on their BSRs). Regarding claims 96 and 11, Novlan teaches wherein monitoring the demand for the group-shared UL resources comprises: - receiving, via the SL resources, a Buffer Status Report, BSR, from at least one UE within the group of UEs (Novlan: Figs. 5, 7 and 8; [0045]-[0046], [0060] UE 550a monitors BSRs from other UEs in a group and schedules them based on their BSRs). Regarding claim 97, Novlan teaches wherein monitoring the demand for the group-shared UL resources further comprises: - monitoring a sum of requested resources in at least one BSR from at least one UE within the group of UEs; and - if the sum of requested resources in said at least one BSR exceeds the configured group-shared UL resources, transmitting, to the RAN node, a request for additional group- shared UL resources (Novlan: [0045]-[0046], UE 550A/local manager request more resources based on BSRs from other UEs in the group). Regarding claim 98, Novlan teaches wherein the request for additional group-shared UL resources comprises an indication of an amount of desired group-shared UL resources based on said sum of requested resources in said at least one BSR (Novlan: [0045]-[0046], UE 550A/local manager request more resources based on BSRs from other UEs in the group). Regarding claim 99, Novlan teaches wherein the request for additional group-shared UL resources comprises an aggregated BSR and the aggregated BSR comprises information of a total buffer status of all UEs within the group of UEs (Novlan: [0045]-[0046], UE 550A/local manager request more resources based on the aggregated BSRs from other UEs in the group). Regarding claim 100, Novlan teaches wherein the aggregated BSR comprises an identifier indicating that the aggregated BSR is an aggregated BSR (Novlan: [0045]-[0046], UE 550A/local manager request more resources based on the aggregated BSRs from other UEs in the group). Regarding claim 101, Novlan teaches wherein the method further comprises: - receiving, from the RAN node, a configuration configuring additional group- shared UL resources as a response to said transmitted request for additional group-shared UL resources (Novlan: [0045]-[0046], UE 550A/local manager request more resources based on the aggregated BSRs from other UEs in the group; network allocates more resource, see [0045]). Regarding claim 102, Novlan teaches wherein the method further comprises: - allocating partial or all the received additional group-shared UL resources to at least one UE within the group of UEs that has data to transmit (Novlan: [0045]-[0046], UE 550A/local manager request more resources based on the aggregated BSRs from other UEs in the group and allocates resource to the UEs in the group). Regarding claim 103, Novlan teaches wherein the method further comprises: - transmitting, to the group of UEs, a configuration configuring the group of UEs with the SL resources to be used by the group of UEs and configuring the group of UEs that the coordinator UE coordinates the use of the group-shared UL resources (Novlan: [0045]-[0046], [0055] UE 550A/local manager request more resources based on the aggregated BSRs from other UEs in the group and allocates resource to the UEs in the group). Regarding claim 104, Novlan teaches wherein scheduling the configured group-shared UL resources to at least one UE within the group of UEs comprises: - indicating to the at least one UE within the group of UEs which group-shared UL resources to use (Novlan: [0045]-[0046], [0055] UE 550A/local manager request more resources based on the aggregated BSRs from other UEs in the group and allocates resource to the UEs in the group). Regarding claim 105, Novlan teaches wherein which group-shared UL resources the at least one UE within the group of UEs is allowed to use is indicated to said UE by indicating a timing of a configured grant for said group-shared UL resources (Novlan: Figs 5-8, [0039]-[0041]). Regarding claim 106, Novlan teaches wherein indicating to the at least one UE within the group of UEs which group-shared UL resources to use comprises: - transmitting, to said at least one UE within the group of UEs, a Downlink Control Information, DCI, using a configured search space on Physical Sidelink Common Control Channel, PDCCH (Novlan: Figs 5-8, [0033]-[0039]). Regarding claim 107, Novlan teaches wherein the method further comprises: - transmitting, to the RAN node, an indication of which configured group-shared UL resources that have been scheduled to which at least one UE within the group of UEs (Novlan: [0045]-[0046], [0055] UE 550A/local manager request more resources based on the aggregated BSRs from other UEs in the group and allocates resource to the UEs in the group). Regarding claims 109, Novlan teaches wherein the method further comprises: - transmitting, to at least one UE within the group of UEs, the configuration configuring the at least one UE within the group of UEs with group-shared UL resources and SL resources to be used by the group of UEs, and wherein the configuration further indicates that the coordinator UE coordinates scheduling of the group-shared UL resources (Novlan: Figs. 5, 7 and 8; [0045]-[0046], [0060] UE 550a monitors BSRs from other UEs in a group and schedules them based on their BSRs). Regarding claims 112, Novlan teaches wherein the method further comprises: - receiving, from the RAN node, allocation of group-shared UL resources (Novlan: Figs. 5, 7 and 8, [0055], [0060], UE 550A local manager/coordinator, receives resources from the network device 510/RAN node and schedules other UEs in the group). Regarding claims 113, Novlan teaches wherein the method further comprises: - receiving, from the coordinator UE, allocation of group-shared UL resources (Novlan: Figs. 5, 7 and 8, [0055], [0060] UE 550A local manager/coordinator, receives resources from the network device 510/RAN node and schedules other UEs in the group). Conclusion THIS ACTION IS MADE FINAL. Applicant is reminded of the extension of time policy as set forth in 37 CFR 1.136(a). A shortened statutory period for reply to this final action is set to expire THREE MONTHS from the mailing date of this action. In the event a first reply is filed within TWO MONTHS of the mailing date of this final action and the advisory action is not mailed until after the end of the THREE-MONTH shortened statutory period, then the shortened statutory period will expire on the date the advisory action is mailed, and any nonprovisional extension fee (37 CFR 1.17(a)) pursuant to 37 CFR 1.136(a) will be calculated from the mailing date of the advisory action. In no event, however, will the statutory period for reply expire later than SIX MONTHS from the mailing date of this final action. Any inquiry concerning this communication or earlier communications from the examiner should be directed to KODZOVI ACOLATSE whose telephone number is (571)270-1999. The examiner can normally be reached Monday to Friday 10 am to 6pm. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Avellino Joseph can be reached at (571) 272-3905. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /KODZOVI ACOLATSE/Primary Examiner, Art Unit 2478
Read full office action

Prosecution Timeline

Apr 21, 2023
Application Filed
Aug 12, 2025
Non-Final Rejection mailed — §102
Nov 12, 2025
Response Filed
Jan 26, 2026
Final Rejection mailed — §102
Mar 26, 2026
Response after Non-Final Action
Apr 27, 2026
Request for Continued Examination
May 02, 2026
Response after Non-Final Action
May 27, 2026
Non-Final Rejection mailed — §102 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12641587
SIGNALING FOR POWER CLASS FALLBACK WITH TRANSMISSION DIVERSITY
3y 5m to grant Granted May 26, 2026
Patent 12641664
TECHNIQUES FOR RADIO RESOURCE CONTROL RECONFIGURATION ALIGNMENT
2y 9m to grant Granted May 26, 2026
Patent 12634788
ELECTRONIC DEVICE CAPABLE OF CONTROLLING FREQUENCY BANDS FOR WIRELESS COMMUNICATION AND OPERATION METHOD THEREOF
3y 2m to grant Granted May 19, 2026
Patent 12634673
ELECTRONIC DEVICE FOR MANAGING CONTROLLED DEVICE AND METHOD OF OPERATING SAME
2y 10m to grant Granted May 19, 2026
Patent 12628226
Methods for Adaptive User Equipment Behavior for Cell Reconfiguration in NR-U
4y 1m to grant Granted May 12, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

3-4
Expected OA Rounds
84%
Grant Probability
99%
With Interview (+21.5%)
2y 6m (~0m remaining)
Median Time to Grant
High
PTA Risk
Based on 926 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month