NOTIFICATION OF SGW CHANGE FOR ONE OR MORE PDN CONNECTIONS WHEN COMBINED SGW/PGW/SMF SET IS DEPLOYED

Non-Final OA §102§103§112
Filed
Dec 20, 2023
Priority
Jun 25, 2021 — provisional 63/215,040 +1 more
Examiner
LE, BRIAN T
Art Unit
2479
Tech Center
2400 — Computer Networks
Assignee
Telefonaktiebolaget LM Ericsson
OA Round
1 (Non-Final)
80%
Grant Probability
Favorable
1-2
OA Rounds
2m
Est. Remaining
99%
With Interview

Examiner Intelligence

Grants 80% — above average
80%
Career Allowance Rate
297 granted / 372 resolved
+21.8% vs TC avg
Strong +29% interview lift
Without
With
+28.8%
Interview Lift
resolved cases with interview
Typical timeline
3y 0m
Avg Prosecution
15 currently pending
Career history
389
Total Applications
across all art units

Statute-Specific Performance

§101
2.9%
-37.1% vs TC avg
§103
41.0%
+1.0% vs TC avg
§102
22.2%
-17.8% vs TC avg
§112
25.3%
-14.7% vs TC avg
Black line = Tech Center average estimate • Based on career data from 372 resolved cases

Office Action

§102 §103 §112
DETAILED ACTION Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . CLAIM INTERPRETATION Claim 2 recites “The method of claim 1 wherein combined SGW/PGW/SMFs in the combined SGW/PGW/SMF set are interchangeable such that existing user plane entities for the one or more PDN connections are reused”. The only limitation on the method is that it be formed (in any way) to be capable of obtaining the result of existing user plane entities for the one or more PDN connections are reused. The “such that” clause in this case does not add a further limitation to the recited method. Claim 3 recites “The method of claim 1 wherein combined SGW/PGW/SMFs in the combined SGW/PGW/SMF set are interchangeable such that user plane GTP tunnel endpoints in a RAN node and SGW-U node used for user plane traffic for the one or more PDN connections are not impacted”. The only limitation on the method is that it be formed (in any way) to be capable of obtaining the result of user plane GTP tunnel endpoints in a RAN node and SGW-U node used for user plane traffic for the one or more PDN connections are not impacted. The “such that” clause in this case does not add a further limitation to the recited method. See MPEP 2111.04 Specification The substitute specification submitted on 07/23/2024 has been accepted. The specification amendment submitted on 12/20/2023 which amended the abstract has been accepted. The specification amendment submitted on 12/20/2023 which added the cross-reference to related applications has been accepted. Claim Objections Claims 1-24 and 26-27 are objected to because of the following informalities: Claim 1 recites “SGW/PGW/SMF” in line 4. For clarity, it is suggested to spell out the acronym when it is recited in the claim for the first time. Claim 3 recites “GTP tunnel endpoints in a RAN node and SGW-U node” in lines 2-3. For clarity, it is suggested to spell out the acronym when it is recited in the claim for the first time. Claim 9 recites “FQDN” in line 2. For clarity, it is suggested to spell out the acronym when it is recited in the claim for the first time. Claim 12 recites “MME” in line 2. For clarity, it is suggested to spell out the acronym when it is recited in the claim for the first time. Claim 13 recites “SGW/PGW/SMF” in line 1. For clarity, it is suggested to spell out the acronym when it is recited in the claim for the first time. Claim 17 recites “and/or” in line 2. It is suggested to clarify the use of words instead of “/”. Claim 21 recites “FQDN” in line 2. For clarity, it is suggested to spell out the acronym when it is recited in the claim for the first time. Claim 24 recites “MME” in line 2. For clarity, it is suggested to spell out the acronym when it is recited in the claim for the first time. Claim 26 recites “SGW/PGW/SMF” in line 4. For clarity, it is suggested to spell out the acronym when it is recited in the claim for the first time. Claim 27 recites “SGW/PGW/SMF” in line 1. For clarity, it is suggested to spell out the acronym when it is recited in the claim for the first time. Claim 27 recites “PDN” in line 4. For clarity, it is suggested to spell out the acronym when it is recited in the claim for the first time. Claims 2, 4-8, 10-11, 14-16, 18-20, and 22-23 are also objected since they are dependent on the objected claims set forth above. Appropriate correction is required. Claim Rejections - 35 USC § 112 The following is a quotation of 35 U.S.C. 112(b): (b) CONCLUSION.—The specification shall conclude with one or more claims particularly pointing out and distinctly claiming the subject matter which the inventor or a joint inventor regards as the invention. Claims 10-11, 17, and 20-23 are rejected under 35 U.S.C. 112(b) or 35 U.S.C. 112 (pre-AIA ), second paragraph, as being indefinite for failing to particularly point out and distinctly claim the subject matter which the inventor or a joint inventor, or for pre-AIA the applicant regards as the invention. Claim 10 recites “the notification of the address change” in lines 1-2. It is unclear whether it is referring to “the notification of the SGW address change”. For the purpose of examination, examiner will interpret the claim as best understood. Claim 11 recites “the notification of the address change” in lines 1-2. It is unclear whether it is referring to “the notification of the SGW address change”. For the purpose of examination, examiner will interpret the claim as best understood. Regarding claim 17, the phrase "e.g.," renders the claim indefinite because it is unclear whether the limitation(s) following the phrase are part of the claimed invention. See MPEP § 2173.05(d). Claim 20 recites “notification of the address change” in line 2. It is unclear whether it is referring to “the notification of the SGW address change”. For the purpose of examination, examiner will interpret the claim as best understood. Claims 21-23 are also rejected since they are depended on the rejected claim 20 set forth above. Claim Rejections - 35 USC § 102 In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that form the basis for the rejections under this section made in this Office action: A person shall be entitled to a patent unless – (a)(1) the claimed invention was patented, described in a printed publication, or in public use, on sale or otherwise available to the public before the effective filing date of the claimed invention. (a)(2) the claimed invention was described in a patent issued under section 151, or in an application for patent published or deemed published under section 122(b), in which the patent or application, as the case may be, names another inventor and was effectively filed before the effective filing date of the claimed invention. Claims 1-5, 7-15, and 17-24 are rejected under 35 U.S.C. 102(a)(1) as being anticipated by NOKIA, et al., "C4-205149: Restoration of PDN connections after a PGW-C/SMF change," Change Request, 3GPP TSG-CT WG4 Meeting #101e, November 3-13, 2020, Electronic Meeting, 9 pages, hereinafter “Nokia”. Regarding claim 1, Nokia discloses a method performed by a core network node [see Figures X.2-1, X.3-1, X.4-1; a method performed by an MME], the method comprising: establishing one or more Packet Data Network, PDN, connections with a first combined SGW/PGW/SMF [see pages 5-9; establish one or more PDN connections with a first combo SGW/PGW-C/SMF], wherein: the first combined SGW/PGW/SMF is comprised in a combined SGW/PGW/SMF set [see pages 5-9; the first combo SGW/PGW-C/SMF is comprised in a combo SGW/PGW-C/SMF set]; and a SGW of the first combined SGW/PGW/SMF has a first address [see pages 5-9; a SGW of the first combo SGW/PGW-C/SMF has a first address (SGW’s S1-U F-TEID); also see pages 3, 7, “If the MME reselected a different SGW, the MME shall update the eNB with the new SGW's S1-U F-TEID using the MME triggered Serving GW relocation procedure (see clause 5.10.4 of 3GPP TS 23.401 [15])”. Note that SGW's S1-U F-TEID includes SGW address]; receiving a notification of an SGW address change for the one or more PDN connections, the notification of the SGW address change comprising a second address of a SGW of a second combined SGW/PGW/SMF, the second combined SGW/PGW/SMF being comprised in the combined SGW/PGW/SMF set [see pages 5-9; receive an Update Bearer Request for the one or more PDN connections, the Update Bearer Request comprising PGW Change Info which comprises a new SGW’s S1-U F-TEID of a different SGW of a second combo SGW/PGW-C/SMF, the second combo SGW/PGW-C/SMF being comprised in the combo SGW/PGW-C/SMF set; also see pages 3, 7, “If the MME reselected a different SGW, the MME shall update the eNB with the new SGW's S1-U F-TEID using the MME triggered Serving GW relocation procedure (see clause 5.10.4 of 3GPP TS 23.401 [15])”. Note that SGW's S1-U F-TEID includes SGW address]; and initiating a PDN connection restoration procedure towards the SGW of the second combined SGW/PGW/SMF using the second address of the SGW of the second combined SGW/PGW/SMF comprised in the notification of the SGW address change [see pages 5-9; initiate a PDN connection restoration procedure towards the different SGW of the second combo SGW/PGW-C/SMF using the new SGW’s S1-U F-TEID of the second combo SGW/PGW-C/SMF comprised in the Update Bearer Request; also see pages 3, 7, “If the MME reselected a different SGW, the MME shall update the eNB with the new SGW's S1-U F-TEID using the MME triggered Serving GW relocation procedure (see clause 5.10.4 of 3GPP TS 23.401 [15])”. Note that SGW's S1-U F-TEID includes SGW address]. Regarding claim 2, Nokia discloses wherein combined SGW/PGW/SMFs in the combined SGW/PGW/SMF set are interchangeable such that existing user plane entities for the one or more PDN connections are reused [see pages 5-9; wherein combo SGW/PGW A/SMF and combo SGW/PGW B/SMF in the combo SGW/PGW-C/SMF set are interchangeable]. Regarding claim 3, Nokia discloses wherein combined SGW/PGW/SMFs in the combined SGW/PGW/SMF set are interchangeable such that user plane GTP tunnel endpoints in a RAN node and SGW-U node used for user plane traffic for the one or more PDN connections are not impacted [see pages 5-9; wherein combo SGW/PGW A/SMF and combo SGW/PGW B/SMF in the combo SGW/PGW-C/SMF set are interchangeable]. Regarding claim 4, Nokia discloses wherein receiving the notification of the SGW address change comprises receiving the notification of the SGW address change from the second combined SGW/PGW/SMF [see pages 5-9, Fig. X.4-1; receive the Update Bearer Request from the second combo SGW/PGW B/SMF]. Regarding claim 5, Nokia discloses wherein receiving the notification of the SGW address change comprises receiving the notification of the SGW address change from the first combined SGW/PGW/SMF [see pages 5-9, Fig. X.4-1; receive the Update Bearer Request from the first combo SGW/PGW A/SMF]. Regarding claim 7, Nokia discloses wherein receiving the notification of the SGW address change comprises receiving the notification of the SGW address change after the first combined SGW/PGW/SMF has failed or otherwise gone offline [see pages 5-9, Figures X.3-1, X.4-1; receive the Update Bearer Request after the first combined SGW/PGW A/SMF has failed or otherwise gone offline]. Regarding claim 8, Nokia discloses wherein initiating the PDN connection restoration procedure comprises sending a create session request message for each of the one or more PDN connections to be restored to the SGW of the second combined SGW/PGW/SMF using the second address of the SGW of the second combined SGW/PGW/SMF comprised in the notification of the SGW address change [see pages 5-9, Fig. X.3-1 step 4, Fig. X.4-1 step 4; sending a create session request message for each of the one or more PDN connections to be restored to the different SGW of the second combo SGW/PGW B/SMF using the new SGW's S1-U F-TEID of the different SGW of the second combo SGW/PGW B/SMF comprised in the Update Bearer Request; also see pages 3, 7, “If the MME reselected a different SGW, the MME shall update the eNB with the new SGW's S1-U F-TEID using the MME triggered Serving GW relocation procedure (see clause 5.10.4 of 3GPP TS 23.401 [15])”. Note that SGW's S1-U F-TEID includes SGW address]. Regarding claim 9, Nokia discloses wherein the second address of the SGW of the second combined SGW/PGW/SMF is an IP address or FQDN [see pages 3, 5-9; the new SGW's S1-U F-TEID of the second combo SGW/PGW B/SMF is an IP address. Note that SGW's S1-U F-TEID includes SGW IP address; also see page 6, Fig. X.3-1, Fig. X.4-1; the PGW Change Info IE contains the PGW Set FQDN]. Regarding claim 10, Nokia discloses wherein the notification of the address change comprises a create/update/delete bearer request messages comprising one or more PGW Change Info IEs, at least one of which comprises the second address of the SGW of the second combined SGW/PGW/SMF [see pages 3, 5-9, Fig. X.4-1 steps 2a/2b; the Update Bearer Request comprises a create/update/delete bearer request message comprising PGW Change Info IE, at least one of which comprises the new SGW's S1-U F-TEID of the second combo SGW/PGW B/SMF; also see pages 3, 7, “If the MME reselected a different SGW, the MME shall update the eNB with the new SGW's S1-U F-TEID using the MME triggered Serving GW relocation procedure (see clause 5.10.4 of 3GPP TS 23.401 [15])”]. Regarding claim 11, Nokia discloses wherein the notification of the address change comprises a create/update/delete bearer request comprising one or more PGW Change Info IEs, at least one of which comprises an IE that comprises the second address of the SGW of the second combined SGW/PGW/SMF [see pages 3, 5-9, Fig. X.4-1 steps 2a/2b; the Update Bearer Request comprises a create/update/delete bearer request message comprising PGW Change Info IE, at least one of which comprises an IE that comprises the new SGW's S1-U F-TEID of the second combo SGW/PGW B/SMF; also see pages 3, 7, “If the MME reselected a different SGW, the MME shall update the eNB with the new SGW's S1-U F-TEID using the MME triggered Serving GW relocation procedure (see clause 5.10.4 of 3GPP TS 23.401 [15])”]. Regarding claim 12, Nokia discloses wherein the core network node is an MME [see pages 5-9, Figures X.2-1, X.3-1, X.4-1; the core network node is an MME]. Regarding claim 13, Nokia discloses a method performed by a combined SGW/PGW/SMF [see Figures X.2-1, X.3-1, X.4-1; a method performed by a combo SGW/PGW-C/SMF], the method comprising: sending, to a core network node, a notification of an SGW address change for one or more PDN connections that are using a first combined SGW/PGW/SMF [see pages 5-9, Fig. X.4-1; send, to a MME, an Update Bearer Request for one or more PDN connections that are using a first combo SGW/PGW-C/SMF], wherein: the first combined SGW/PGW/SMF is comprised in a combined SGW/PGW/SMF set [see pages 5-9; the first combo SGW/PGW-C/SMF is comprised in a combo SGW/PGW-C/SMF set]; a SGW of the first combined SGW/PGW/SMF has a first address [see pages 5-9; a SGW of the first combo SGW/PGW-C/SMF has a first address (SGW’s S1-U F-TEID); also see pages 3, 7, “If the MME reselected a different SGW, the MME shall update the eNB with the new SGW's S1-U F-TEID using the MME triggered Serving GW relocation procedure (see clause 5.10.4 of 3GPP TS 23.401 [15])”. Note that SGW's S1-U F-TEID includes SGW address]; and the notification of the SGW address change comprising a second address of a SGW of a second combined SGW/PGW/SMF, the second combined SGW/PGW/SMF being comprised in the combined SGW/PGW/SMF set [see pages 5-9; the Update Bearer Request comprising PGW Change Info which comprises a new SGW’s S1-U F-TEID of a different SGW of a second combo SGW/PGW-C/SMF, the second combo SGW/PGW-C/SMF being comprised in the combo SGW/PGW-C/SMF set; also see pages 3, 7, “If the MME reselected a different SGW, the MME shall update the eNB with the new SGW's S1-U F-TEID using the MME triggered Serving GW relocation procedure (see clause 5.10.4 of 3GPP TS 23.401 [15])”. Note that SGW's S1-U F-TEID includes SGW address]. Regarding claim 14, Nokia discloses wherein the combined SGW/PGW/SMF is the second combined SGW/PGW/SMF [see pages 5-9, Fig. X.4-1 step 2b; the second combined SGW/PGW B/SMF sends the Update Bearer Request]. Regarding claim 15, Nokia discloses wherein the combined SGW/PGW/SMF is the first combined SGW/PGW/SMF [see pages 5-9, Fig. X.4-1 step 2a; the first combined SGW/PGW A/SMF sends the Update Bearer Request]. Regarding claim 17, Nokia discloses determining that a change of a serving SGW and/or a serving PGW for the one or more PDN connections is needed (e.g., because the serving SGW or serving PGW has failed or to rebalance the load among the combined SGW/PGW/SMFs in the set) [see page 5, section X.1, pages 8-9, section X.4 PGW triggered PDN connection restoration; determining that a change of a serving SGW or a serving PGW for the one or more PDN connections is needed]. Regarding claim 18, Nokia discloses receiving, from the core network node, a message that initiates a PDN connection restoration procedure towards the second combined SGW/PGW/SMF based on the notification of the SGW address change, wherein the PDN connection restoration procedure restores the one or more PDN connections with the second combined SGW/PGW/SMF [see pages 5-9, Fig. X.4-1 step 4; receiving, from the MME, a Create Session Request message that initiates a PDN connection restoration procedure towards the second combo SGW/PGW B/SMF based on the Update Bearer Request, wherein the PDN connection restoration procedure restores the one or more PDN connections with the second combo SGW/PGW B/SMF]. Regarding claim 19, Nokia discloses wherein sending the notification of the SGW address change comprises sending the notification of the SGW address change after the first combined SGW/PGW/SMF has failed or otherwise gone offline [see pages 5-9, Fig. X.4-1; sending the Update Bearer Request after the first combo SGW/PGW A/SMF has failed or otherwise gone offline]. Regarding claim 20, Nokia discloses wherein notification of the address change comprises a new SGW address [see pages 5-9; the Update Bearer Request comprising PGW Change Info which comprises a new SGW’s S1-U F-TEID of a different SGW; also see pages 3, 7, “If the MME reselected a different SGW, the MME shall update the eNB with the new SGW's S1-U F-TEID using the MME triggered Serving GW relocation procedure (see clause 5.10.4 of 3GPP TS 23.401 [15])”. Note that SGW's S1-U F-TEID includes SGW address]. Regarding claim 21, Nokia discloses wherein the second address of the SGW of the second combined SGW/PGW/SMF is an IP address or FQDN [see pages 3, 5-9; the new SGW's S1-U F-TEID of the second combo SGW/PGW B/SMF is an IP address. Note that SGW's S1-U F-TEID includes SGW IP address; also see page 6, Fig. X.3-1, Fig. X.4-1; the PGW Change Info IE contains the PGW Set FQDN]. Regarding claim 22, Nokia discloses wherein the notification of the SGW address change comprises a create/update/delete bearer request comprising one or more PGW Change Info IEs, at least one of which comprises the second address of the SGW of the second combined SGW/PGW/SMF [see pages 3, 5-9, Fig. X.4-1 steps 2a/2b; the Update Bearer Request comprises a create/update/delete bearer request message comprising PGW Change Info IE, at least one of which comprises the new SGW's S1-U F-TEID of the second combo SGW/PGW B/SMF; also see pages 3, 7, “If the MME reselected a different SGW, the MME shall update the eNB with the new SGW's S1-U F-TEID using the MME triggered Serving GW relocation procedure (see clause 5.10.4 of 3GPP TS 23.401 [15])”]. Regarding claim 23, Nokia discloses wherein the notification of the SGW address change comprises a create/update/delete bearer request comprising one or more PGW Change Info IEs, at least one of which comprises an IE that comprises the second address of the SGW of the second combined SGW/PGW/SMF [see pages 3, 5-9, Fig. X.4-1 steps 2a/2b; the Update Bearer Request comprises a create/update/delete bearer request message comprising PGW Change Info IE, at least one of which comprises an IE that comprises the new SGW's S1-U F-TEID of the second combo SGW/PGW B/SMF; also see pages 3, 7, “If the MME reselected a different SGW, the MME shall update the eNB with the new SGW's S1-U F-TEID using the MME triggered Serving GW relocation procedure (see clause 5.10.4 of 3GPP TS 23.401 [15])”]. Regarding claim 24, Nokia discloses wherein the core network node is an MME [see pages 5-9, Figures X.2-1, X.3-1, X.4-1; the core network node is an MME]. Claim Rejections - 35 USC § 103 The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. The factual inquiries set forth in Graham v. John Deere Co., 383 U.S. 1, 148 USPQ 459 (1966), that are applied for establishing a background for determining obviousness under 35 U.S.C. 103 are summarized as follows: 1. Determining the scope and contents of the prior art. 2. Ascertaining the differences between the prior art and the claims at issue. 3. Resolving the level of ordinary skill in the pertinent art. 4. Considering objective evidence present in the application indicating obviousness or nonobviousness. Claims 26-27 are rejected under 35 U.S.C. 103 as being unpatentable over Nokia in view of Landais et al. (US 2022/0038542 A1, hereinafter “Landais”). Regarding claim 26, Nokia discloses a core network node configured to [see Figures X.2-1, X.3-1, X.4-1; an MME]: establish one or more Packet Data Network, PDN, connections with a first combined SGW/PGW/SMF [see pages 5-9; establish one or more PDN connections with a first combo SGW/PGW-C/SMF], wherein: the first combined SGW/PGW/SMF is comprised in a combined SGW/PGW/SMF set [see pages 5-9; the first combo SGW/PGW-C/SMF is comprised in a combo SGW/PGW-C/SMF set]; and a SGW of the first combined SGW/PGW/SMF has a first address [see pages 5-9; a SGW of the first combo SGW/PGW-C/SMF has a first address (SGW’s S1-U F-TEID); also see pages 3, 7, “If the MME reselected a different SGW, the MME shall update the eNB with the new SGW's S1-U F-TEID using the MME triggered Serving GW relocation procedure (see clause 5.10.4 of 3GPP TS 23.401 [15])”. Note that SGW's S1-U F-TEID includes SGW address]; receive a notification of an SGW address change for the one or more PDN connections, the notification of the SGW address change comprising a second address of a SGW of a second combined SGW/PGW/SMF, the second combined SGW/PGW/SMF being comprised in the combined SGW/PGW/SMF set [see pages 5-9; receive an Update Bearer Request for the one or more PDN connections, the Update Bearer Request comprising PGW Change Info which comprises a new SGW’s S1-U F-TEID of a different SGW of a second combo SGW/PGW-C/SMF, the second combo SGW/PGW-C/SMF being comprised in the combo SGW/PGW-C/SMF set; also see pages 3, 7, “If the MME reselected a different SGW, the MME shall update the eNB with the new SGW's S1-U F-TEID using the MME triggered Serving GW relocation procedure (see clause 5.10.4 of 3GPP TS 23.401 [15])”. Note that SGW's S1-U F-TEID includes SGW address]; and initiate a PDN connection restoration procedure towards the SGW of the second combined SGW/PGW/SMF using the second address of the SGW of the second combined SGW/PGW/SMF comprised in the notification of the SGW address change [see pages 5-9; initiate a PDN connection restoration procedure towards the different SGW of the second combo SGW/PGW-C/SMF using the new SGW’s S1-U F-TEID of the second combo SGW/PGW-C/SMF comprised in the Update Bearer Request; also see pages 3, 7, “If the MME reselected a different SGW, the MME shall update the eNB with the new SGW's S1-U F-TEID using the MME triggered Serving GW relocation procedure (see clause 5.10.4 of 3GPP TS 23.401 [15])”. Note that SGW's S1-U F-TEID includes SGW address]. Nokia does not explicitly disclose a core network node comprising “processing circuitry”. However, Landais teaches a core network node comprising processing circuitry [see Fig. 1-2, 10-11, para. 96-97, 174; an MME comprising a processor] configured to cause the core network node to establish one or more PDN connections with a combined SGW/PGW/SMF [see Fig. 10-11, para. 174, 223-252; configured to cause the MME to establish one or more PDN connections with a combined SGW/PGW/SMF]. Therefore, it would have been obvious to one having ordinary skill in the art before the effective filing date of the claimed invention to provide “a core network node comprising processing circuitry configured to cause the core network node to establish one or more PDN connections with a combined SGW/PGW/SMF”, as taught by Landais, into the system of Nokia so that it would transfer a PDN connection from one network function instance to another network function instance comprised within a network function set [see Landais, para. 3]. Regarding claim 27, Nokia discloses a combined SGW/PGW/SMF configured to [see Figures X.2-1, X.3-1, X.4-1; a combo SGW/PGW-C/SMF]: send, to a core network node, a notification of an SGW address change for one or more PDN connections that are using a first combined SGW/PGW/SMF [see pages 5-9, Fig. X.4-1; send, to a MME, an Update Bearer Request for one or more PDN connections that are using a first combo SGW/PGW-C/SMF], wherein: the first combined SGW/PGW/SMF is comprised in a combined SGW/PGW/SMF set [see pages 5-9; the first combo SGW/PGW-C/SMF is comprised in a combo SGW/PGW-C/SMF set]; a SGW of the first combined SGW/PGW/SMF has a first address [see pages 5-9; a SGW of the first combo SGW/PGW-C/SMF has a first address (SGW’s S1-U F-TEID); also see pages 3, 7, “If the MME reselected a different SGW, the MME shall update the eNB with the new SGW's S1-U F-TEID using the MME triggered Serving GW relocation procedure (see clause 5.10.4 of 3GPP TS 23.401 [15])”. Note that SGW's S1-U F-TEID includes SGW address]; and the notification of the SGW address change comprising a second address of a SGW of a second combined SGW/PGW/SMF, the second combined SGW/PGW/SMF being comprised in the combined SGW/PGW/SMF set [see pages 5-9; the Update Bearer Request comprising PGW Change Info which comprises a new SGW’s S1-U F-TEID of a different SGW of a second combo SGW/PGW-C/SMF, the second combo SGW/PGW-C/SMF being comprised in the combo SGW/PGW-C/SMF set; also see pages 3, 7, “If the MME reselected a different SGW, the MME shall update the eNB with the new SGW's S1-U F-TEID using the MME triggered Serving GW relocation procedure (see clause 5.10.4 of 3GPP TS 23.401 [15])”. Note that SGW's S1-U F-TEID includes SGW address]. Nokia does not explicitly disclose a combined SGW/PGW/SMF comprising “processing circuitry”. However, Landais teaches a combined SGW/PGW/SMF comprising processing circuitry [see Fig. 1-2, 10-11, para. 109-110, 174; a combined SGW/PGW/SMF comprising a processor] configured to send, to a core network node, a Create bearer request [see Fig. 10-11, para. 174, 223-252; configured to send, to an MME, a Create bearer request]. Therefore, it would have been obvious to one having ordinary skill in the art before the effective filing date of the claimed invention to provide “a combined SGW/PGW/SMF comprising processing circuitry configured to send, to a core network node, a Create bearer request”, as taught by Landais, into the system of Nokia so that it would transfer a PDN connection from one network function instance to another network function instance comprised within a network function set [see Landais, para. 3]. Allowable Subject Matter Claims 6 and 16 are objected to as being dependent upon a rejected base claim, but would be allowable if rewritten in independent form including all of the limitations of the base claim and any intervening claims. Conclusion The prior art made of record and not relied upon is considered pertinent to applicant's disclosure. Ryu et al. (US 2018/0324652 A1), see Fig. 20, para. 435-469, discloses a method of reporting change of a serving node (e.g., MME/SGSN or C-SGN) to the SCEF. Any inquiry concerning this communication or earlier communications from the examiner should be directed to BRIAN T LE whose telephone number is (571)270-5615. The examiner can normally be reached on M-F 9AM-6PM. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, JAE LEE can be reached on 571-270-3936. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of an application may be obtained from the Patent Application Information Retrieval (PAIR) system. Status information for published applications may be obtained from either Private PAIR or Public PAIR. Status information for unpublished applications is available through Private PAIR only. For more information about the PAIR system, see http://pair-direct.uspto.gov. Should you have questions on access to the Private PAIR system, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative or access to the automated information system, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /BRIAN T LE/Primary Examiner, Art Unit 2469
Read full office action

Prosecution Timeline

Dec 20, 2023
Application Filed
Sep 22, 2026
Non-Final Rejection mailed — §102, §103, §112 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12750828
METHOD FOR WIRELESS COMMUNICATION AND TERMINAL DEVICE
2y 3m to grant Granted Sep 29, 2026
Patent 12739898
MULTI-DEVICE SYSTEM, WIRELESS CONNECTION METHOD AND NON-TRANSITORY COMPUTER READABLE STORAGE MEDIUM
2y 10m to grant Granted Sep 15, 2026
Patent 12732320
Sounding Schemes Using Distributed Tones In Wireless Communications
1y 5m to grant Granted Sep 08, 2026
Patent 12713373
WIRELESS MICROPHONE SYNCHRONIZATION FOR BTOIP TWS EARBUDS
2y 2m to grant Granted Aug 18, 2026
Patent 12707285
Network operation center dashboard for cloud-based Wi-Fi and cellular systems
3y 10m to grant Granted Aug 11, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
80%
Grant Probability
99%
With Interview (+28.8%)
3y 0m (~2m remaining)
Median Time to Grant
Low
PTA Risk
Based on 372 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month