DETAILED ACTION
Notice of Pre-AIA or AIA Status
The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA .
In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status.
Claim Rejections - 35 USC § 102
The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that form the basis for the rejections under this section made in this Office action:
A person shall be entitled to a patent unless –
(a)(2) the claimed invention was described in a patent issued under section 151, or in an application for patent published or deemed published under section 122(b), in which the patent or application, as the case may be, names another inventor and was effectively filed before the effective filing date of the claimed invention.
Claim(s) 1-9, 12, 13, 19-29 and 31 is/are rejected under 35 U.S.C. 102(a)(2) as being anticipated by Jeon (US 2023/0413379).
Regarding Claims 1 and 19, Jeon teaches a method by a user equipment, UE, for adapting a small data transmission, SDT, the method comprising:
determining that at least one proximity condition is fulfilled (¶ [0401] – [0404], see specifically paging occasions overlapping with an SDT),
the at least one proximity condition being associated with:
at least one resource for a SDT (¶ [0401], see specifically time duration associated with an SDT), and
at least one paging resource for receiving at least one paging related signal from a network node (¶ [0401], see specifically paging occasion); and
performing (1004) at least one task for adapting the SDT based on the at least one proximity condition being fulfilled (¶ [0420], see specifically perform either the SDT or the Paging).
Regarding Claims 2 and 20, Jeon teaches determining that the at least one proximity condition is fuilfilled comprises determining that the at least one resource for the SDT at least partially overlaps in time with the at least one paging resource (¶ [0401] – [0404], see specifically paging occasions overlapping with an SDT
Regarding Claims 3 and 21, Jeon teaches wherein performing the at least one task for adapting the SDT based on the at least one proximity condition being fulfilled comprises at least one of: monitoring at least one paging occasion associated with the at least one paging resource, and receiving at least one paging related signal (¶ [0420], see specifically perform either the SDT or the Paging).
Regarding Claims 4 and 22, Jeon teaches performing the at least one task for adapting the SDT based on the at least one proximity condition being fulfilled comprises: dropping the SDT (¶ [0420], see specifically perform either the SDT or the Paging).
Regarding Claims 5 and 23, Jeon teaches performing the at least one task for adapting the SDT based on the at least one proximity condition being fulfilled comprises at least one of: postponing the SDT; and switching from a first SDT method to a second SDT method. (¶ [0420], see specifically perform either the SDT or the Paging).
Regarding Claims 6 and 24, Jeon teaches switching from the first SDT method to the second SDT method comprises: switching from a Configured Grant-SDT, CG-SDT, method to a Random Access Channel-SDT, RACH-SDT, method; switching from a RACH-SDT method to a CG-SDT method; switching from a 4-step RACH-SDT method to a 2-step RACH-SDT method; or switching from a 2-step RACH-SDT method to a 4-step RACH-SDT method. (NOTE: “switching from the first SDT method to the second SDT method comprises’ and is not required such that none of the limitations of claim 6 are limiting if the alternative limitation is chosen.
Regarding Claims 7 and 25, Jeon teaches receiving, from a network node information associated with the at least one resource for a SDT (¶ [0256], see specifically RACH based SDT.)
Regarding Claim 8 and 26, Jeon teaches receiving the information associated with the at least one resource for the SDT comprises at least one of: a Physical Uplink Shared Channel, PUSCH, allocation; a Random Access Channel, RACH, allocation; a frequency of a pre-configured radio resource; information indicating that the at least one resource for the SDT is periodic and/or a periodicity of the at least one resource for the SDT; information indicating that the at least one resource for the SDT is aperiodic; and a Timing Advance, TA, value associated with a pre-configured radio resource. (¶ [0256], see specifically RACH based SDT.)
Regarding Claim 9 and 27, Jeon teaches the at least one resource for the SDT is associated with a configured grant, CG (¶ [0422], see specifically CG based SDT).
Regarding Claim 12 and 28, Jeon teaches determining that the UE has data to transmit using the at least one resource for the SDT (¶ [0296], see specifically skip transmission if there is no uplink data.)
Regarding Claim 13 and 31, Jeon teaches determining that the UB has the data to transmit comprises at least one of: receiving data for transmission as SDT; determining that a buffer contains data; determining a need to retransmit previously transmitted data; receiving a request from a network node; and determining that a timer has expired. (¶ [0296], see specifically skip transmission if there is no uplink data in a buffer.)
Regarding Claim 29, Jeon teaches the information associated with the at least one paging reception resource comprises a paging configuration and/or a paging reception periodicity (¶ [0360], see specifically paging configuration parameters.)
Conclusion
The prior art made of record and not relied upon is considered pertinent to applicant's disclosure.
Nam (US 2020/0288402) is considered pertinent to applicant’s disclosure.
Any inquiry concerning this communication or earlier communications from the examiner should be directed to ROBERT M MORLAN whose telephone number is (571)270-5674. The examiner can normally be reached Monday - Friday, 10 AM - 4PM.
Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice.
If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Hadi Armouche can be reached at 571-270-3618. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300.
Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000.
/ROBERT M MORLAN/Primary Examiner, Art Unit 2409
ROBERT M. MORLAN
Primary Examiner
Art Unit 2409