Prosecution Insights
Last updated: November 20, 2026
Application No. 18/814,012

MULTI-MODE COOLING FOR HEAT SOURCE

Final Rejection §103
Filed
Aug 23, 2024
Priority
Aug 25, 2023 — provisional 63/534,713
Examiner
ATTEY, JOEL M
Art Unit
3763
Tech Center
3700 — Mechanical Engineering & Manufacturing
Assignee
RTX Corporation
OA Round
2 (Final)
65%
Grant Probability
Moderate
3-4
OA Rounds
10m
Est. Remaining
99%
With Interview

Examiner Intelligence

Grants 65% of resolved cases
65%
Career Allowance Rate
320 granted / 493 resolved
-5.1% vs TC avg
Strong +44% interview lift
Without
With
+43.5%
Interview Lift
resolved cases with interview
Typical timeline
3y 1m
Avg Prosecution
31 currently pending
Career history
524
Total Applications
across all art units

Statute-Specific Performance

§101
0.2%
-39.8% vs TC avg
§103
48.6%
+8.6% vs TC avg
§102
16.3%
-23.7% vs TC avg
§112
33.1%
-6.9% vs TC avg
Black line = Tech Center average estimate • Based on career data from 493 resolved cases

Office Action

§103
Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Claim Rejections - 35 USC § 103 The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. The factual inquiries for establishing a background for determining obviousness under 35 U.S.C. 103 are summarized as follows: 1. Determining the scope and contents of the prior art. 2. Ascertaining the differences between the prior art and the claims at issue. 3. Resolving the level of ordinary skill in the pertinent art. 4. Considering objective evidence present in the application indicating obviousness or nonobviousness. In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. Claims 1-5, 11-17, and 19-20 are rejected under 35 U.S.C. 103 as being unpatentable over Pal (U.S. Patent 10,451,353) in view of Lynn et al. (U.S. PGPub 2021/0053689). Regarding claim 1, Pal teaches a method of operation (per fig. 1), comprising: transferring heat energy into a first heat exchange fluid (“coolant” fluid in 103) during a first mode of operation and during a second mode of operation (from elements 109, see Col. 2, ln 37-54); directing the first heat exchange fluid through a first flowpath (element 103) of a heat exchanger during the first mode of operation and during the second mode of operation (per fig. 1, see Col. 2, ln 37-54); directing a second heat exchange fluid (“fuel” in 107) through a second flowpath of the heat exchanger during the first mode of operation (per fig. 1), and transferring at least some of the heat energy from the first heat exchange fluid into the second heat exchange fluid (per col. 3, ln 46-57); and directing a third heat exchange fluid (“air” in element 105) through a third flowpath (element 105) of the heat exchanger during the second mode of operation (col. 3, ln 4-20, col. 4, ln 8-26) and transferring at least some of the heat energy from the first heat exchange fluid into the third heat exchange fluid (Col. 2, ln 37-54, col. 4, ln 8-26). wherein the first heat exchange fluid is directed through the first flowpath using a first pump (element 104) and the third heat exchange fluid is directed through the third flowpath using an air mover (element 121). Pal does not expressly teach the first pump is powered by a common power source during the first mode of operation and the second mode of operation, and the air mover is powered by the common power source during the second mode of operation. Lynn teaches powering a fan and pump using a common source (para. 0060). It would have been obvious at the time of filing to modify Pal to utilize the common power source as taught by Lynn as for the various modes as claimed , the motivation would be centralize and reduce the wiring and controls. Regarding claim 2, pal teaches the first heat exchange fluid is a liquid heat exchange fluid (propylene glycol is known as liquid coolant). Regarding claim 3, Pal teaches the second heat exchange fluid is a liquid heat exchange fluid (aircraft “fuel” is known to be liquid). Regarding claim 4, Pal teaches the third heat exchange fluid is air (“air” in element 105). Regarding claim 5, Pal teaches circulating the second heat exchange fluid through a heat exchange circuit (per fig. 1); wherein the first mode of operation is a normal mode of operation for the heat exchange circuit (Col. 2, ln 1-9; the modes of this can be considered normal mode); and wherein the second mode of operation is a backup mode of operation for the heat exchange circuit (Col. 2, ln 1-9; the modes of this can be considered backup mode). Regarding claim 9, Lynn teaches the common power source comprises a battery (para. 0060). Regarding claim 10, Pal teaches generating the heat energy with a heat source (element 109), the heat energy transferred from the heat source into the first heat exchange fluid during the first mode of operation and during the second mode of operation (per fig. 1, see Col. 2, ln 37-54). Lynn further teaches the common power source comprising a thermoelectric generator thermally powered by the heat source (para. 0071, electronics power/control the battery). Regarding claim 11, Pal teaches cutting power to a second pump (element 125) during the second mode of operation (per fig. 1, Col. 2, ln 1-9, col. 3, ln 46-57); wherein the second heat exchange fluid is directed through the second flowpath of the heat exchanger using the second pump during the first mode of operation (per fig. 1, Col. 2, ln 1-9, col. 3, ln 46-57). Regarding claim 12, pal teaches cutting power to the air mover during the first mode of operation (per fig. 1, Col. 2, ln 1-9, col. 3, ln 46-57). Regarding claim 13, pal teaches operating an aircraft powerplant per fig. 1, Col. 2, ln 1-9); wherein the heat energy is generated during the operation of the aircraft powerplant (per fig. 1, Col. 2, ln 1-9, col. 3, ln 46-57). Regarding claim 14, Pal teaches a method of operation (Fig. 1), comprising: transferring heat energy from a heat source (“electronics” element 109, Col. 2, ln 47-54) into a first heat exchange fluid (“coolant” fluid in 103) during a first mode of operation and during a second mode of operation (from elements 109, see Col. 2, ln 37-54); circulating the first heat exchange fluid through a heat exchange circuit (element 103), using a pump (element 104) during the first mode of operation and during the second mode of operation (per fig. 1, see Col. 2, ln 37-54), the heat exchange circuit passing through a liquid-to-liquid heat exchanger and through a liquid-to-air heat exchanger (per fig. 1, element 101); extracting at least some of the heat energy from the first heat exchange fluid using the liquid-to-liquid heat exchanger during the first mode of operation (per fig. 1, see Col. 2, ln 37-54); extracting at least some of the heat energy from the first heat exchange fluid using the liquid-to-air heat exchanger during the second mode of operation, wherein an air mover (element 121) for the liquid-to-air heat exchanger is operational during the second mode of operation and non-operational during the first mode of operation (col. 3, ln 4-20, col. 4, ln 8-26). Pal does not expressly teach the pump and the air mover are powered by a common power source. Lynn teaches powering a fan and pump using a common source (para. 0060). It would have been obvious at the time of filing to modify Pal to utilize the common power source as taught by Lynn as for the various modes as claimed , the motivation would be centralize and reduce the wiring and controls. Regarding claim 15, pal teaches the liquid-to-liquid heat exchanger and the liquid-to-air heat exchanger are integrated with one another in a common heat exchanger (element 101). Regarding claim 16, Pal teaches a system (fig. 1), comprising: a heat source (element 109); a first heat exchange circuit (element 103) including a first heat exchange fluid (“coolant” fluid in 103) and a first flowpath of a heat exchanger (along element 103 in element 101), the first heat exchange circuit configured to transfer heat energy generated by the heat source into the first heat exchange fluid and direct the first heat exchange fluid through the first flowpath of the heat exchanger, using a pump (element 104) during a first mode of operation and during a second mode of operation (per fig. 1, see Col. 2, ln 37-54); a second heat exchange circuit (element 107) including a second heat exchange fluid (“fuel” in 107) and a second flowpath of the heat exchanger (element 107 in 101), the second heat exchanger circuit configured to direct the second heat exchange fluid through the second flowpath of the heat exchanger during the first mode of operation and transfer at least some of the heat energy from the first heat exchange fluid to the second heat exchange fluid (per fig. 1, Col. 2, ln 1-9, col. 3, ln 46-57); and a third heat exchange circuit (element 105) comprising a third flowpath of the heat exchanger (element 105 in 101), the third heat exchanger circuit configured to direct a third heat exchange fluid (“air” in element 105) through the third flowpath of the heat exchanger, using an air mover (element 121) during the second mode of operation and transfer at least some of the heat energy from the first heat exchange fluid to the third heat exchange fluid (col. 3, ln 4-20, col. 4, ln 8-26). Pal does not expressly teach the pump and the air mover are powered by a common power source. Lynn teaches powering a fan and pump using a common source (para. 0060). It would have been obvious at the time of filing to modify Pal to utilize the common power source as taught by Lynn as for the various modes as claimed , the motivation would be centralize and reduce the wiring and controls. Regarding claim 17, pal teaches the heat exchanger is configured as a liquid-to-liquid heat exchanger during the first mode of operation (per fig. 1); and the heat exchanger is configured as a liquid-to-air heat exchanger during the second mode of operation (per fig. 1; col. 3, ln 4-20, col. 4, ln 8-26). Regarding claim 19, Pal does not teach the common power source comprises a battery configured to electrically power operation of the air mover during the second mode of operation. Lynn teaches powering a fan using a battery (para. 0060). It would have been obvious at the time of filing to modify Pal to utilize the battery as taught by Lynn as claimed, the motivation would be centralize and reduce the wiring and controls. Regarding claim 20, Pal does not teach the common power source comprises a thermoelectric generator thermally powered by the heat source, the thermoelectric generator configured to electrically power the air mover and the pump during the second mode of operation. Lynn teaches a thermoelectric generator (battery, para. 0060) thermally powered by the heat source (electronics power/control the battery para. 0071), the thermoelectric generator configured to electrically power the air mover and the pump during operation (par para. 0060). t would have been obvious at the time of filing to modify Pal to utilize the battery as taught by Lynn as claimed, the motivation would be centralize and reduce the wiring and controls. Response to Arguments Applicant’s arguments, filed 9/22/26, with respect to the 112b rejection have been fully considered and are persuasive. The 112b rejection of 6/22/26 has been withdrawn. Applicant's arguments regarding prior art filed 9/22/26 have been fully considered but they are not persuasive. Applicant argues that Lynn does not teach or suggest using a common power source to power the pump that maintains circulation of the first heat exchange fluid in both modes and, during the second mode, also powers the air mover that directs the third heat exchange fluid through the third flowpath. The examiner respectfully disagrees with this arguemtn. Frist this is a piecemeal arguemtn against the combination of references individually, one cannot show nonobviousness by attacking references individually where the rejections are based on combinations of references. See In re Keller, 642 F.2d 413, 208 USPQ 871 (CCPA 1981); In re Merck & Co., 800 F.2d 1091, 231 USPQ 375 (Fed. Cir. 1986). The modes are taught by Pal while lynn teaches the power source. Secondly the claim requires not change of the power source between modes merely that it supply power to whatever is being used in a mode. This is equivalent to the power to my house supplying the furnace in one mode and the AC in another mode, it is the same power supply but different modes. The claim requires no changing of the power supply between different sources in different modes merely that power is supplied from the same source in the modes. Conclusion Applicant's amendment necessitated the new ground(s) of rejection presented in this Office action. Accordingly, THIS ACTION IS MADE FINAL. See MPEP § 706.07(a). Applicant is reminded of the extension of time policy as set forth in 37 CFR 1.136(a). A shortened statutory period for reply to this final action is set to expire THREE MONTHS from the mailing date of this action. In the event a first reply is filed within TWO MONTHS of the mailing date of this final action and the advisory action is not mailed until after the end of the THREE-MONTH shortened statutory period, then the shortened statutory period will expire on the date the advisory action is mailed, and any nonprovisional extension fee (37 CFR 1.17(a)) pursuant to 37 CFR 1.136(a) will be calculated from the mailing date of the advisory action. In no event, however, will the statutory period for reply expire later than SIX MONTHS from the mailing date of this final action. Any inquiry concerning this communication or earlier communications from the examiner should be directed to JOEL M ATTEY whose telephone number is (571)272-7936. The examiner can normally be reached on Monday-Thursday 8-5 and Friday 8-10 and 2-4. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Jianying Atkisson be reached on (571) 270-7740. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /JOEL M ATTEY/Primary Examiner, Art Unit 3763
Read full office action

Prosecution Timeline

Aug 23, 2024
Application Filed
Jun 22, 2026
Non-Final Rejection mailed — §103
Sep 22, 2026
Response Filed
Nov 10, 2026
Final Rejection mailed — §103 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12800237
HEAT EXCHANGER
2y 10m to grant Granted Nov 17, 2026
Patent 12804860
COOLING SYSTEM AND COOLING METHOD FOR CONTROLLING COOLING SYSTEM
1y 11m to grant Granted Nov 17, 2026
Patent 12791257
HEAT EXCHANGER
3y 11m to grant Granted Nov 10, 2026
Patent 12787223
EBULLITION COOLING DEVICE
2y 12m to grant Granted Nov 03, 2026
Patent 12774860
PLATE HEAT EXCHANGER
2y 4m to grant Granted Oct 27, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

3-4
Expected OA Rounds
65%
Grant Probability
99%
With Interview (+43.5%)
3y 1m (~10m remaining)
Median Time to Grant
Moderate
PTA Risk
Based on 493 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month