Technology areas: Chemistry & Materials • Medical Devices & Mechanical Engineering
127 pending office actions • 55 art units • 105 examiners • 0 of 127 (0%) have an AI response strategy ready • 436 patents granted in the last 365 days
RTX Corporation has 133 pending office actions in Medical Devices & Mechanical Engineering. The portfolio includes 108 distinct examiners and 56 distinct art units, indicating extensive distribution across examination personnel and groups. That breadth creates a substantial need for consistent processes in docketing, claim review, and response preparation.
KANG, EDWIN G is the busiest identified examiner, with 5 pending matters. The identified examiner is a useful focal point, but the wider assignment pattern shows that most prosecution activity lies elsewhere. Counsel may combine targeted review of related files with portfolio-wide tracking of recurring medical-device and mechanical-engineering issues.
Based on the USPTO statutory response window for each pending office action. 22 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 22 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 1 (1%) |
| §101 + other | 6 (5%) |
| §103 only | 47 (37%) |
| §102 only | 7 (6%) |
| §112 only | 7 (6%) |
| Multi-statute (no §101) | 59 (46%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| KANG, EDWIN G | 5 | 64.1% | +66.6% |
| GAMBETTA, KELLY M | 3 | 71.8% | +33.0% |
| NGUYEN, ANDREW H | 2 | 75.2% | +42.5% |
| SUTHERLAND, STEVEN M | 2 | 82.1% | +15.4% |
| DAVIS, JASON GREGORY | 2 | 74.2% | +18.2% |
| NG, HENRY | 2 | 62.9% | +53.2% |
| CHRISTENSEN, DANIELLE M | 2 | 79.4% | +11.3% |
| KIM, TAE JUN | 2 | 63.9% | +25.8% |
| FIGUEROA, JOHN J | 2 | 83.3% | +8.7% |
| SEBASCO CHENG, STEPHANIE | 2 | 58.6% | +71.1% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 3 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19269241 | GAS TURBINE ENGINE WITH HIGH SPEED LOW PRESSURE TURBINE SECTION AND BEARING SUPPORT FEATURES | SUTHERLAND, STEVEN M | — |
| 18775501 | HIGH TEMPERATURE FIBER AND METHOD OF MAKING | FIGUEROA, JOHN J | — |
| 18628162 | PRODUCTION OF SILICON CARBIDE PARTICLES | FIGUEROA, JOHN J | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18742742 | FAN EXIT GUIDE VANE THERMAL MANAGEMENT SYSTEM FOR HYBRID ELECTRICS | GOLIK, ARTHUR PAUL | 22d overdue |
| 18628194 | CORES FOR CERAMIC MATRIX COMPOSITE COMPONENTS | WOO, JONATHAN BRIAN | 22d overdue |
| 19335646 | Aircraft Heat Exchanger | NGUYEN, ANDREW H | 15d overdue |
| 18366129 | REMOTE UPDATES OF A GAS TURBINE ENGINE | WEI, ZENGPU | 8d overdue |
| 17586326 | HYBRID ELECTRIC SINGLE ENGINE DESCENT RESTART | AMAR, MARC J | 8d overdue |
| 18493599 | PRE-SHAPED SPACE FILLERS FOR SMALL CROSS SECTION FEATURES | IMANI, ELIZABETH MARY COLE | 7d |
| 18340341 | METHOD TO DECREASE ACOUSTIC SIGNATURE OF A HYBRID ELECTRIC PROPULSION SYSTEM | AMAR, MARC J | 12d |
| 19237498 | VARIABLE THICKNESS COATING CONTROL | FISHER, WESLEY LE | 19d |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19335646 | Aircraft Heat Exchanger | NGUYEN, ANDREW H | 15d overdue |
| 18774708 | GEARBOX ARRANGEMENT FOR DUAL SPOOL ENGINE ACCESSORIES | SEBASCO CHENG, STEPHANIE | 20d |
| 18422343 | INTERMEDIATE CASE FOR AIRCRAFT PROPULSION SYSTEM HOUSING | KIM, TAE JUN | 27d |
| 19075310 | CONVECTION COOLING AT LOW EFFUSION DENSITY REGION OF COMBUSTOR PANEL | NG, HENRY | 29d |
| 18389208 | COOLING NOZZLE VANES OF A TURBINE ENGINE | KANG, EDWIN G | 41d |
| 18496615 | ADDITIVE CLOCKED FUEL INJECTOR BOLT | KANG, EDWIN G | 41d |
| 19269241 | GAS TURBINE ENGINE WITH HIGH SPEED LOW PRESSURE TURBINE SECTION AND BEARING SUPPORT FEATURES | SUTHERLAND, STEVEN M | — |
| 19261583 | WEAR PAD FOR ROOT OF FAN BLADE | DAVIS, JASON GREGORY | — |
| Art Unit | Apps |
|---|---|
| 3741 | 24 |
| 3745 | 15 |
| 2857 | 7 |
| 2855 | 6 |
| 3726 | 4 |
| 1717 | 3 |
| 1718 | 3 |
| 3799 | 3 |
| 1754 | 3 |
| 1784 | 3 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19335646 | Aircraft Heat Exchanger | NGUYEN, ANDREW H | 3741 | §103§112 | Final Rejection | 15d overdue | Pending | Sep 22, 2025 |
| 19307354 | DATA RETRIEVAL SYSTEM WITH CONTROLLED ACCESS BASED UPON SECURITY LEVELS | MCFARLAND-BARNES, KELAH JANAE | 2431 | §102§103§112 | Non-Final OA | — | Pending | Aug 22, 2025 |
| 19295993 | Carbon Radial Seal | PATEL, VISHAL A | 3675 | §103§112 | Non-Final OA | — | Pending | Aug 11, 2025 |
| 19269241 | GAS TURBINE ENGINE WITH HIGH SPEED LOW PRESSURE TURBINE SECTION AND BEARING SUPPORT FEATURES | SUTHERLAND, STEVEN M | 3752 | §103Other | Non-Final OA | — | Pending | Jul 15, 2025 |
| 19261583 | WEAR PAD FOR ROOT OF FAN BLADE | DAVIS, JASON GREGORY | 3745 | §102§103§112Other | Final Rejection | — | Pending | Jul 07, 2025 |
| 19246269 | THRUST DIVERTER FOR AN OPEN ROTOR AIRCRAFT PROPULSION SYSTEM | NG, HENRY | 3741 | §102§103§112Other | Non-Final OA | — | Pending | Jun 23, 2025 |
| 19244382 | Metallic Substrate Laser Treatment | PENNY, TABATHA L | 1712 | §103§112 | Non-Final OA | — | Pending | Jun 20, 2025 |
| 19240619 | MACHINABLE COATING WITH THERMAL PROTECTION | CHRISTENSEN, DANIELLE M | 3745 | §103 | Final Rejection | — | Pending | Jun 17, 2025 |
| 19239567 | BEARING ARRANGEMENT FOR TURBINE ENGINE GEARTRAIN | TAYLOR II, JAMES JOSEPH | 3655 | §102§103§112Other | Non-Final OA | — | Pending | Jun 16, 2025 |
| 19239407 | PARTICULATE SEPARATOR ASSEMBLY FOR A GAS TURBINE ENGINE | SUTHERLAND, STEVEN M | 3741 | §102§103 | Non-Final OA | — | Pending | Jun 16, 2025 |
| 19237498 | VARIABLE THICKNESS COATING CONTROL | FISHER, WESLEY LE | 3745 | §102§103 | Final Rejection | 19d | Pending | Jun 13, 2025 |
| 19225706 | GAS TURBINE ENGINE WITH BYPASS TOBI COOLING/PURGE FLOW AND METHOD | FORD, RENE D | 3741 | §102 | Non-Final OA | — | Pending | Jun 02, 2025 |
| 19217762 | AERIAL VEHICLE FLUID CONTROL SYSTEM WITH MULTI-WAY FLOW REGULATOR | FILOSI, TERRI L | 3644 | §102§103 | Final Rejection | — | Pending | May 23, 2025 |
| 19075310 | CONVECTION COOLING AT LOW EFFUSION DENSITY REGION OF COMBUSTOR PANEL | NG, HENRY | 3741 | §103 | Non-Final OA | 29d | Pending | Mar 10, 2025 |
| 19065752 | HOLLOW FAN BLADE WITH SOLID STATE ADDITIVE MANUFACTURED COVER SKIN | RIBADENEYRA, THEODORE C | 3745 | §103 | Final Rejection | — | Pending | Feb 27, 2025 |
| 19053703 | LOW PRESSURE TURBINE SHAFT INSTALLATION TOOL | BESLER, CHRISTOPHER JAMES | 3726 | §102§112 | Non-Final OA | — | Pending | Feb 14, 2025 |
| 19037229 | AIRCRAFT PROPULSION SYSTEM WITH ACOUSTIC TREATMENT ALONG BYPASS FLOWPATH | LUKS, JEREMY AUSTIN | 2837 | §102§103 | Non-Final OA | — | Pending | Jan 26, 2025 |
| 19036670 | COLD SPRAYING COATING ONTO TURBINE ENGINE COMPONENT | EMPIE, NATHAN H | 1712 | §102§103§112 | Final Rejection | — | Pending | Jan 24, 2025 |
| 19034716 | HIGH TEMPERATURE COMPOSITE MATERIALS WITH EROSION RESISTANT SEAL COAT | DAGENAIS, KRISTEN A | 1717 | §103 | Non-Final OA | — | Pending | Jan 23, 2025 |
| 19024014 | SPECIAL TOOLING FOR FABRICATING VANES | TENTONI, LEO B | 1742 | §102§103 | Final Rejection | — | Pending | Jan 16, 2025 |
| 19024324 | GAS TURBINE ENGINE FRONT SECTION | SUNG, GERALD LUTHER | 3741 | §112Other | Non-Final OA | — | Pending | Jan 16, 2025 |
| 19021830 | Turbine Engine Cold Section Vane Stage | LEGENDRE, CHRISTOPHER RYAN | 3711 | §102§103 | Non-Final OA | — | Pending | Jan 15, 2025 |
| 19014903 | AIRCRAFT PROPULSION SYSTEM WITH ELECTRIC MACHINE SYSTEM COOLING CIRCUIT | NGUYEN, HOANG M | 3746 | §102§103 | Final Rejection | — | Pending | Jan 09, 2025 |
| 18980869 | ATTACHMENT FOR MOUNTING AIRCRAFT PROPULSION SYSTEM TO PYLONG STRUCTURE | MCDUFFIE, MICHAEL D | 3632 | §102§103 | Final Rejection | — | Pending | Dec 13, 2024 |
| 18976945 | REDUCING SURFACE DEFECTS FOR MULTI-LASER PBF-L | LIU, XUE H | 1742 | §102§103 | Non-Final OA | — | Pending | Dec 11, 2024 |
| 18977558 | MACHINING COMPONENT USING SCAN DATA OF INTERNAL ARTIFACT(S) | BEKELE, MEKONEN T | 2699 | §103 | Non-Final OA | — | Pending | Dec 11, 2024 |
| 18973613 | ALUMINUM-CHROMIUM OXIDE COATING AND METHOD THEREFOR | GAMBETTA, KELLY M | 1718 | §103 | Non-Final OA | — | Pending | Dec 09, 2024 |
| 18965600 | SUPPLEMENTAL THRUST SYSTEM WITH ROTATING DETONATION COMBUSTOR | KANG, EDWIN G | 3741 | §103 | Final Rejection | — | Pending | Dec 02, 2024 |
| 18937866 | VARIABLE DAMPING IN COMPOSITE MATERIAL | GAITONDE, MEGHA MEHTA | 1781 | §102§103§112 | Non-Final OA | — | Pending | Nov 05, 2024 |
| 18933469 | RIBBED STRUCTURAL SWIRL RECOVERY VANE WITH ACOUSTIC CAPABILITY | DAVIS, JASON GREGORY | 3745 | §103 | Non-Final OA | — | Pending | Oct 31, 2024 |
| 18933287 | SLIDABLE LINERS IN FAN EXIT GUIDE VANE STRUCTURE | HAGHIGHIAN, BEHNOUSH | 3745 | §103 | Non-Final OA | — | Pending | Oct 31, 2024 |
| 18933412 | ADDITIVE FAN EXIT GUIDE VANE STRUCTURE WITH ACOUSTIC CAPABILITY | CHRISTENSEN, DANIELLE M | 3745 | §103 | Non-Final OA | — | Pending | Oct 31, 2024 |
| 18933565 | METHOD OF REDUCING SADDLE CLAMP ASSEMBLY STRESS | MEILLER, SEAN V | 3741 | §103§112 | Non-Final OA | — | Pending | Oct 31, 2024 |
| 18927563 | THERMAL MANAGEMENT SYSTEM FOR OPEN ROTOR AIRCRAFT PROPULSION SYSTEM | KIM, TAE JUN | 3799 | §103 | Non-Final OA | — | Pending | Oct 25, 2024 |
| 18920170 | LOCAL GAS PATH DRIVEN PASSIVE PURGE FOR OPTICAL PROBE | KO, JASON Y | 1711 | §112 | Non-Final OA | — | Pending | Oct 18, 2024 |
| 18917255 | CMC COMPONENT WITH COOLING CAVITY COVER PLATE | BUI, ANDREW THANH | 3745 | §103 | Final Rejection | — | Pending | Oct 16, 2024 |
| 18914363 | DISTORTION-FREE MANUFACTURING OF LARGE TITANIUM INTEGRALLY BLADED ROTORS | AFZALI, SARANG | 3726 | §103§112 | Non-Final OA | — | Pending | Oct 14, 2024 |
| 18902382 | ADDITIVELY MANUFACTURED HEAT EXCHANGER SUPPORTS AND METHOD OF MANUFACTURE | RUPPERT, ERIC S | 3763 | §102§103 | Non-Final OA | — | Pending | Sep 30, 2024 |
| 18821214 | APPARATUS AND RELATED METHOD(S) FOR REPAIRING MACHINE PARTS | COOK, KYLE A | 3726 | §112 | Final Rejection | — | Pending | Aug 30, 2024 |
| 18784580 | COMPACT TRAVERSING SYSTEMS FOR PROBES OR OTHER DEVICES | COOK, WILLIAM J | 3618 | §103§112 | Non-Final OA | — | Pending | Jul 25, 2024 |
| 18775501 | HIGH TEMPERATURE FIBER AND METHOD OF MAKING | FIGUEROA, JOHN J | 1763 | §102 | Non-Final OA | — | Pending | Jul 17, 2024 |
| 18774708 | GEARBOX ARRANGEMENT FOR DUAL SPOOL ENGINE ACCESSORIES | SEBASCO CHENG, STEPHANIE | 3741 | §103 | Non-Final OA | 20d | Pending | Jul 16, 2024 |
| 18771561 | TWO PIECE HOLLOW-VANE ASSEMBLY CLEANING SYSTEM | RIVERA-CORDERO, ARLYN I | 1714 | §103 | Final Rejection | 34d | Pending | Jul 12, 2024 |
| 18765812 | AIRCRAFT ENGINE INLET MONITORING USING NEUROMORPHIC SENSORS | NIMOX, RAYMOND LONDALE | 2857 | §101 | Non-Final OA | — | Pending | Jul 08, 2024 |
| 18765793 | MATERIAL FAILURE DETECTION FOR AIRCRAFT ENGINES USING NEUROMORPHIC SENSORS | SUN, XIUQIN | 2857 | §101§103 | Non-Final OA | — | Pending | Jul 08, 2024 |
| 18758571 | POWDER BED FUSION ADDITIVE PRINTER RECOATER FOR UNIFORM POWDER PACKING | WOO, JONATHAN BRIAN | 1754 | §103 | Non-Final OA | — | Pending | Jun 28, 2024 |
| 18749491 | Tie Shaft Leakage Control | HTAY, AYE SU MON | 3745 | §103 | Non-Final OA | — | Pending | Jun 20, 2024 |
| 18748021 | SLURRY INFILTRATION WITH FREEZE DRYING AND GELLING FOR MORE UNIFORM DISTRIBUTION OF PARTICULATE MATERIAL | GAMBETTA, KELLY M | 1718 | §103 | Non-Final OA | — | Pending | Jun 19, 2024 |
| 18742742 | FAN EXIT GUIDE VANE THERMAL MANAGEMENT SYSTEM FOR HYBRID ELECTRICS | GOLIK, ARTHUR PAUL | 3745 | §103§112 | Non-Final OA | 22d overdue | Pending | Jun 13, 2024 |
| 18738228 | SYSTEM AND METHOD TO DRESS A COATING USING LASER DOPPLER VIBROMETER | DAVIS HOLLINGTON, OCTAVIA L | 2855 | §102 | Non-Final OA | — | Pending | Jun 10, 2024 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialRTX Corporation has 127 pending office actions as of October 2026, spread across 55 art units and 105 examiners.
Edwin G Kang has the most, with 5 of RTX Corporation's pending office actions.
Mostly Medical Devices & Mechanical Engineering (USPTO Tech Center 3700), based on where its pending office actions are examined.