Prosecution Insights
Last updated: September 26, 2026
Application No. 18/876,343

Radio Frequency Generator

Final Rejection §103
Filed
Dec 18, 2024
Priority
Jul 12, 2022 — EU 22184545.6 +1 more
Examiner
SATHIRAJU, SRINIVAS
Art Unit
2844
Tech Center
2800 — Semiconductors & Electrical Systems
Assignee
Comet AG
OA Round
2 (Final)
89%
Grant Probability
Favorable
3-4
OA Rounds
2m
Est. Remaining
95%
With Interview

Examiner Intelligence

Grants 89% — above average
89%
Career Allowance Rate
744 granted / 837 resolved
+20.9% vs TC avg
Moderate +6% lift
Without
With
+6.2%
Interview Lift
resolved cases with interview
Fast prosecutor
2y 0m
Avg Prosecution
31 currently pending
Career history
856
Total Applications
across all art units

Statute-Specific Performance

§101
3.5%
-36.5% vs TC avg
§103
46.6%
+6.6% vs TC avg
§102
17.6%
-22.4% vs TC avg
§112
15.7%
-24.3% vs TC avg
Black line = Tech Center average estimate • Based on career data from 837 resolved cases

Office Action

§103
Notice of Final Rejection Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Response to Arguments Drawing Objections: Applicant's arguments filed on 06/12/2026 have been fully considered. Based on the applicant’s explanation, examiner has withdrawn the drawing objections of previous office action. Specification Objections: Applicant's arguments filed on 06/12/2026 have been fully considered. Based on the applicant’s explanation, examiner has withdrawn the specification objections of previous office action. Based on the explanation of the applicants, current rejection is updated accordingly while discussing the Radio Frequency Generator in particular for a plasma application. Claim Objections: Applicant's arguments filed on 06/12/2026 have been fully considered. Based on the amendments to claims, examiner has withdrawn the Claim objections of previous office action. 35 USC 112b Rejections: Applicant's arguments filed on 06/12/2026 have been fully considered. Based on the amendments to claims, examiner has withdrawn the Claim objections of previous office action. 35 USC 103 Rejections: Applicant's arguments filed on 06/12/2026 have been fully considered but they are not persuasive. Detailed explanation given below. Issues raised/submitted by applicant: a) Prior Art by “DuBose” does not disclose RF combining network. The multi stage RF power amplifier of DuBose may have several stages of amplifiers, but does not inherently require an RF combining network combining the output signal of a first RF power stage and an output signal of a second RF power stage. B) DuBose does not teach or suggest at least the features of where in the PCB of the RF distribution element is arranged perpendicularly to the surface of the cooling element. For the above reasons applicant argues that DuBose does not disclose or suggest the features of claim 1 and hence dependent claims 2-14 which depend on claim 1 also not taught. Hence, claims 1-14 are allowable.. However, examiner respectfully disagrees with applicant’s arguments. Rule: In response to applicant’s argument that there is no teaching, suggestion, or motivation to combine the references, the examiner recognizes that obviousness may be established by combining or modifying the teachings of the prior art to produce the claimed invention where there is some teaching, suggestion, or motivation to do so found either in the references themselves or in the knowledge generally available to one of ordinary skill in the art. See In re Fine, 837 F.2d 1071, 5 USPQ2d 1596 (Fed. Cir. 1988), In re Jones, 958 F.2d 347, 21 USPQ2d 1941 (Fed. Cir. 1992), and KSR International Co. v. Teleflex, Inc., 550 U.S. 398, 82 USPQ2d 1385 (2007). Explanation: In this case, Examiner teaches RF amplification or combining network circuit as claimed in the prior art by DeBose Fig 1. The power amplification components contains the stages of combined stages of inputs signals and amplified outputs. (See paragraphs [0030]-[0036], claim 2 and abstract). Hence, prior art by DeBose reads on claim 1 limitations and DeBose teaches and/or suggests claims 1-14. Based on the explanation of the applicants, current rejection is updated accordingly while discussing the Radio Frequency Generator in particular for a plasma application. Accordingly, DeBose Fig 1-6 teaches all the required components and/or suggests obviously in several embodiments. Hence, applicant’s arguments are not persuasive. Based on the explanations given by applicant for drawing and claim objections/rejections, current rejection has been updated accordingly to explain the rejection with more clarity. Claim Rejections - 35 USC § 103 The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. Claims 1-14 are rejected under 35 U.S.C. 103 as being unpatentable over US 2020/0395901 A1 by DuBose et al (DuBose). Referring to claim 1, DuBose Fig. 1-6 teaches: A Radio Frequency, (RF) generator (See Fig 1 item 100 and abstract) in particular for a plasma application (See Fig 6), comprising: PNG media_image1.png 292 590 media_image1.png Greyscale a cooling element (Fig 1 item 110 paragraph [0031]; at least a first RF power stage ( item 106 Fig 1 and 106APCB or item 412 Fig 4 paragraph [0046]) having a first output (via item 108 for details Fig 4 and paragraph [0046]) and a second RF power stage (Fig 1 item 106, or Fig 4 item 106BPCB or item 414 paragraph [0046]) having a second output (item 416), both being mounted onto a surface of the cooling element (See Fig 1, 4 item 110 paragraphs [0031]- [0033] where in Fig 4 DuBose specifically teaches multiple output stages and Power amplifier input output signals and they are being mounted on a cooling plate 110); PNG media_image2.png 272 312 media_image2.png Greyscale DeBose I teaches an RF combining network (Fig 4 item in put 410 + first power stage 412 + second power stage 414 + final output stage 418/404) mounted onto the surface of the cooling element comprising at least a first input (See Fig 1 item 108) and a second input and second RF power stage with the second input of the RF combining network, respectively (See Fig 3, 4 and paragraphs [0045]-[0056] in the abstract, Fig 1 and in claim 15 discloses a multi stage power amplifier RF system. (See abstract and claim 15), an RF distribution element (item 104 RF circuit components includes an RF distribution and power amplifier circuitry paragraph [0032]), wherein the RF distribution element (item 104) comprises a printed circuit board (PCB) { item 114 see paragraph [0044] where DuBose discloses 114 as a PCB} , having a plurality of conductors (see paragraph [0031] where PCB (item 106/114) has plurality of conductor elements comprises copper material or other conductors and also [0063] where DuBose discloses PCB is of made up of several conductors at different stages of amplification or RF combined stages of network), wherein the conductors of the RF distribution elements (Fig 4 and paragraph [0046]) are arranged such that the first output (item 108) of the first RF power stage (item 412) is connected to the first input (item 410) of the RF combining network (Fig 4 paragraph [0046]) wherein the PCB (item 106) of the RF distribution element (item 104) is arranged perpendicularly to the surface of the cooling element (See item 104 RF distribution element is connected on cooling element 110 perpendicularly in Fig 1, 4, to the ground plane and 104) see paragraphs [0034] -[0038]). Hence, it is within the scope of a person with ordinary skill in the art before the effective filing date of instant application to incorporate several embodiments (Fig 1, 2 4, of DuBose in to a single embodiment and fabricate two stage RF power system for the plasma application. Referring to claim 2 DuBose modified reference teaches the RF-generator according to claim 1, but Dubose is silent on wherein the length of each of the plurality of conductors is 10 cm or more. However, it is within the scope of an ordinary skill to determine the size based on the power output requirements. Referring to claim 3 DuBose modified reference teaches the RF Generator according to claim 1 but silent on wherein-the conductors have the same length. However, it is within the scope of a person with ordinary skill to try this for uniform distribution. Referring to claim 4 DuBose modified reference teaches the RF-generator according to claim 1 wherein the first RF power stage and the second RF power stage provide in-phase RF signals at their outputs. (See abstract and paragraph [0046]). Referring to claim 5 DuBose modified reference teaches the RF generator according to claim 1 arranged inside a housing (See Fig 1 -4 item 102 housing paragraph [0031]), wherein the housing (item 102) has preferably a standardized 19/2- inch format or a 19-inch format. (See paragraphs [0011] and paragraph [0036]). Hence, it would have been obvious to a person with ordinary skill to try a standardized 19/2 inch format or 19 inch format. Referring to claim 6 DuBose modified reference teaches the RF-generator according to claim 5, Fig 1, 4 of DuBose teaches wherein the RF distribution element is arranged in parallel to a long side of the housing and preferably directly next to the long side of the housing. (see paragraphs [0011] [0036] and [0046]). Referring to claim 7 DuBose modified reference teaches the RF generator according to claim 1 but silent on wherein-the conductors are built as microstrips or striplines. However, it would be obvious to try by a person with ordinary skill in the art from Dubose teaches in paragraph [0031] [0032] about conductive lines in side PCB. Referring to claim 8 DuBose modified reference teaches the RF generator according to claim 1 wherein the conductors are formed on a surface of the PCB and/or internally. (See paragraphs [0031] [0032]). Referring to claim 9 DuBose modified reference teaches the RF generator according to claim 1, wherein-the PCB of the RF distribution element comprises a metallic layer on one surface of the PCB or on both surfaces of the PCB. (See Fig 2A paragraph [0037] and Fig 3 and paragraph [0045]). Referring to claim 10 DuBose modified reference teaches the RF generator according to claim 9, Dubose is silent on wherein -the width of the conductors is smaller or equal to the distance between the conductors and the metallic layer. But it is within the scope of ordinary skill in the art to try conductor widths as required by the uniform power distributions and less power losses and better conduction for heat removal purposes. Referring to claim 11 DuBose modified reference teaches the RF generator according to claim 1 wherein the RF distribution element comprises a heat spreader connected to the PCB, wherein the heat spreader of the RF distribution element is in contact with the cooling element to transfer heat from the conductors to the cooling element. (See Fig 1 and paragraph [0018] claim 15). Also, it is within the scope of the art and ordinary skill of the art. Referring to claim 12 DuBose modified reference teaches the RF generator according to claim 1 wherein-the RF distribution element is connected to the cooling element by one or more of an adhesive, clamping screws, conductive thermal interface material, solder bond or bonding sheet. (See Fig 3 and paragraph [0045]). Also, it is within the scope of the art and ordinary skill of the art. Referring to claim 13 DuBose modified reference teaches the RF generator according to claim 1 wherein -the RF distribution element is connected to the first output, the second output of the power stages, the first input and the second input of the RF combining network by brackets or screws. (Inherent teachings of the RF power supply). Also, it is within the scope of the art and ordinary skill of the art). Referring to claim 14 DuBose modified reference teaches the RF generator according to-claim1, Dubose is silent on wherein an even mode impedance and an odd mode impedance of the conductors-is 50 Ohm +/-10%. However, it is known skill of the RF impedance matching and for maximum power transfer in the RF power distribution art, to keep the RF power source impedance to 50 ohms. Conclusion Claims 1-14 are rejected over prior art. The prior of art made of record and not relied upon is considered to pertinent to applicant’s disclosure. Applicants are directed to consider additional pertinent prior art included on the notice of references cited PTOL 892 attached here with. The examiner has pointed out particular references contained in the prior art of record within the body of this action for the convenience of the Applicants. Although the specified citations are representative of the teachings in the art and are applied to the specific limitations within the individual claim other passages and figures may apply. Applicant, in preparing the response should consider fully the entire reference as potentially teaching all or part of the claimed invention as well as the context of the passage as taught by the prior art or disclosed by the examiner. Applicant's amendment necessitated the new ground(s) of rejection presented in this Office action. Accordingly, THIS ACTION IS MADE FINAL. See MPEP § 706.07(a). Applicant is reminded of the extension of time policy as set forth in 37 CFR 1.136(a). A shortened statutory period for reply to this final action is set to expire THREE MONTHS from the mailing date of this action. In the event a first reply is filed within TWO MONTHS of the mailing date of this final action and the advisory action is not mailed until after the end of the THREE-MONTH shortened statutory period, then the shortened statutory period will expire on the date the advisory action is mailed, and any nonprovisional extension fee (37 CFR 1.17(a)) pursuant to 37 CFR 1.136(a) will be calculated from the mailing date of the advisory action. In no event, however, will the statutory period for reply expire later than SIX MONTHS from the mailing date of this final action. Any inquiry concerning this communication or earlier communications from the examiner should be directed to SRINIVAS SATHIRAJU whose telephone number is (571)272-4250. The examiner can normally be reached 8:30AM-3:30PM, 5PM -8:30PM. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, ALEXANDER H TANINGCO can be reached at 5712728048. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /SRINIVAS SATHIRAJU/08/08/2026 SRINIVAS . SATHIRAJU Primary Examiner Art Unit 2845
Read full office action

Prosecution Timeline

Dec 18, 2024
Application Filed
Mar 13, 2026
Non-Final Rejection mailed — §103
Jun 12, 2026
Response Filed
Aug 12, 2026
Final Rejection mailed — §103
Sep 14, 2026
Interview Requested
Sep 21, 2026
Applicant Interview (Telephonic)
Sep 21, 2026
Examiner Interview Summary

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12738385
MAGNETIC MIRROR MACHINE
3y 9m to grant Granted Sep 15, 2026
Patent 12738466
SIGNAL PROCESSING SYSTEM AND POWER SUPPLY DEVICE HAVING A SIGNAL PROCESSING SYSTEM
2y 9m to grant Granted Sep 15, 2026
Patent 12738455
RF POWER SPLITTING AND CONTROL
2y 6m to grant Granted Sep 15, 2026
Patent 12738454
SUBSTRATE PROCESSING APPARATUS
2y 2m to grant Granted Sep 15, 2026
Patent 12731766
SUBSTRATE SUPPORT INCLUDING MULTIPLE RADIO FREQUENCY (RF) ELECTRODES
2y 5m to grant Granted Sep 08, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

3-4
Expected OA Rounds
89%
Grant Probability
95%
With Interview (+6.2%)
2y 0m (~2m remaining)
Median Time to Grant
Moderate
PTA Risk
Based on 837 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month