Prosecution Insights
Last updated: November 20, 2026
Application No. 19/026,775

ENERGY EFFICIENT MANUFACTURING

Non-Final OA §103
Filed
Jan 17, 2025
Examiner
YANCHUS III, PAUL B
Art Unit
2115
Tech Center
2100 — Computer Architecture & Software
Assignee
International Business Machines Corporation
OA Round
1 (Non-Final)
83%
Grant Probability
Favorable
1-2
OA Rounds
11m
Est. Remaining
96%
With Interview

Examiner Intelligence

Grants 83% — above average
83%
Career Allowance Rate
710 granted / 860 resolved
+27.6% vs TC avg
Moderate +14% lift
Without
With
+13.9%
Interview Lift
resolved cases with interview
Typical timeline
2y 9m
Avg Prosecution
17 currently pending
Career history
882
Total Applications
across all art units

Statute-Specific Performance

§101
7.5%
-32.5% vs TC avg
§103
53.5%
+13.5% vs TC avg
§102
23.0%
-17.0% vs TC avg
§112
5.1%
-34.9% vs TC avg
Black line = Tech Center average estimate • Based on career data from 860 resolved cases

Office Action

§103
DETAILED ACTION Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Claim Rejections - 35 USC § 103 The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. Claims 1-20 are rejected under 35 U.S.C. 103 as being unpatentable over Reinhart et al., US Patent Application Publication no. 2020/0264589 [Reinhart], in view of Jayawardane et al., “Sustainable Manufacturing and Service Economics”. Regarding claims 1, 9 and 17, Reinhart discloses a system comprising: a memory comprising computer readable instructions [Memory 708 in and paragraph 0061]; and a processing device for executing the computer readable instructions, the computer readable instructions controlling the processing device to perform operations for energy efficient manufacturing [Processor 702 in and paragraph 0061], the operations comprising: receiving a design of an object to be manufactured [input a CAD model that represents the product to be manufactured, paragraph 0025]; analyzing the design of the object to be manufactured to segment the object to be manufactured into components [the modelled workpiece can include geometric primitives which can be combined to form the whole part, paragraph 0019. The model is used to produce a primitive decomposition which includes regions and possible states, paragraph 0025. Production plans include a plurality of operations that each describe how each available tool acts on a geometric primitive in the workpiece, paragraphs 0027-0028, 0032, 0034 and 0038]; performing a comparative evaluation between wastage of materials across different types of manufacturing processes to manufacture the components of the object [automatic evaluations of production plans, which may include a combination of additive and subtractive manufacturing processes, are performed and the production plans are ranked based on user specified criteria, such as material waste, paragraphs 0020 and 0030]; calculating a sustainability score for each of the types of manufacturing processes for each of the components [ranking of production plans based on specified criteria necessarily includes assigning some type of scores that reflect each production plan’s success in meeting the specified criteria]; selecting a manufacturing process for each of the components based at least in part on the sustainability score for each of the types of manufacturing processes for each of the components [selected a feasible manufacturing plan solution, paragraph 0030]; and manufacturing each of the components using the selected manufacturing process for each of the components [physically manufacturing a part based on a selected feasible manufacturing plan solution, paragraph 0030]. Reinhart discloses selecting a manufacturing plan based on sustainability criteria that includes material wastage, but does not disclose that the sustainability criteria also include power consumption. Like Reinhart, Jayawardane discloses analyzing sustainability of additive and subtractive manufacturing processes. Jayawardane recognizes that a plurality of criteria may be used for judging sustainability of additive and subtractive manufacturing processes. The criteria include energy use, material use, waste and emissions [Introduction, pages 1-2 and Sustainability assessment tools under triple bottom line objectives, pages 5-6]. Since it was known in the art before the effective filing date of the claimed invention to consider power use in addition to material waste as sustainability criteria for additive and subtractive manufacturing processes, it would have been obvious to one of ordinary skill in the art to apply the Jayawardane teachings to the Reinhart system by considering power use in addition to material waste as sustainability criteria when selecting a manufacturing plan in order to produce a more sustainable manufacturing plan. Regarding claims 2, 10 and 18, Reinhart further discloses analyzing the design of the object to be manufactured to segment the object to be manufactured into the components comprises applying historical information to identify how the object can be segmented and manufactured as the components [using expert knowledge to make decisions, paragraphs 0020, 0023 and 0050]. Regarding claims 3, 11 and 19, Reinhart further discloses that analyzing the design of the object to be manufactured to segment the object to be manufactured into the components is based at least in part on a specification of the object, a shape of the object, and dimensions of the object [the modelled workpiece can include geometric primitives which can be combined to form the whole part, paragraph 0019. The model is used to produce a primitive decomposition which includes regions and possible states, paragraph 0025]. Regarding claims 4, 12 and 20, Reinhart further discloses that the sustainability score is calculated for each of the types of manufacturing processes based at least in part on parameters of the types of manufacturing processes [automatic evaluations of production plans, which may include a combination of additive and subtractive manufacturing processes, are performed based on tool properties and the production plans are ranked based on user specified criteria, such as material waste, paragraphs 0020, 0026, 0030 and 0039-0041]. Regarding claims 5, 6, 13 and 14, Jayawardane further discloses that the parameters of the types of manufacturing processes are weight based on an importance or priority fand comprise at least power consumption, material wastage, and environmental impact [Introduction, pages 1-2, Sustainability assessment tools under triple bottom line objectives, pages 5-6 and Other aspects of environmental impact in manufacturing, page 7]. Regarding claims 7, 8, 15 and 16, Reinhart further discloses that updating the sustainability score for each of the types of manufacturing processes for each of the components by performing a trial-and-error technique, wherein the trial-and-error technique comprises gradually selecting incremental portions of the object, evaluating the sustainability score of different manufacturing processes, performing segmentation of the object to determine the components that maximize the sustainability score for each of the types of manufacturing processes for each of the components [the state space explorer returns a set of approximate best solutions after a finite number of branching iterations and the solutions are ranked based on user specified criteria, such as material waste, paragraphs 0020, 0030 and 0049]. Conclusion The prior art made of record and not relied upon is considered pertinent to applicant's disclosure. Mori, US Patent Application Publication no. 2018/0093325 discloses selecting a workpiece manufacturing process based on respective characteristics of additive and subtractive manufacturing. Any inquiry concerning this communication or earlier communications from the examiner should be directed to PAUL B YANCHUS III whose telephone number is (571)272-3678. The examiner can normally be reached Monday-Friday 9am-5pm. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Kamini Shah can be reached at (571) 272-2279. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /PAUL B YANCHUS III/Primary Examiner, Art Unit 2115 September 28, 2026
Read full office action

Prosecution Timeline

Jan 17, 2025
Application Filed
Oct 01, 2026
Non-Final Rejection mailed — §103
Nov 12, 2026
Interview Requested

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12803278
PREDICTING ELECTRICAL COMPONENT FAILURE
3y 5m to grant Granted Nov 17, 2026
Patent 12804862
TEMPERATURE MANAGEMENT SYSTEM AND METHOD FOR ROOM WITH CHARGE DISCHARGE DEVICE INSTALLED
2y 9m to grant Granted Nov 17, 2026
Patent 12779611
Device system and method for determining a depth of a bore that is produced with the device system
3y 9m to grant Granted Nov 03, 2026
Patent 12784709
MEDICAL SUPPORT SYSTEM
3y 6m to grant Granted Nov 03, 2026
Patent 12775323
ADAPTIVE POWER MANAGEMENT
2y 6m to grant Granted Oct 27, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
83%
Grant Probability
96%
With Interview (+13.9%)
2y 9m (~11m remaining)
Median Time to Grant
Low
PTA Risk
Based on 860 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month