Technology area: Semiconductors, Circuits & Optics
6 pending office actions • 4 art units • 6 examiners • 0 of 6 (0%) have an AI response strategy ready • 2 patents granted in the last 365 days
Amphenol East Asia Electronic Technology (Shenzhen) Co., Ltd. currently manages 6 pending office actions within the Semiconductors, Circuits & Optics technology area. These 6 actions are assigned to 6 distinct examiners, meaning each examiner is responsible for 1 pending matter. This distribution suggests a range of semiconductor-related filings that are not concentrated under any single official.
The busiest examiner, PAUMEN, GARY F, handles 1 pending office action. Since there are 6 distinct examiners for the 6 pending office actions, the workload is evenly spread across the active files. However, the use of 4 distinct art units indicates that some examiners are working within the same specialized groups to review the company's Semiconductors, Circuits & Optics applications. This structure requires the company to monitor 6 distinct examiners while navigating the standards of 4 distinct art units.
Based on the USPTO statutory response window for each pending office action. 1 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §103 only | 1 (17%) |
| Multi-statute (no §101) | 5 (83%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| PAUMEN, GARY F | 1 | 88.6% | -1.3% |
| LEE, SEUNG H | 1 | 87.6% | +10.8% |
| TUMEBO, TSION M | 1 | 66.3% | +20.4% |
| BAILLARGEON, PAUL D | 1 | 78.0% | +4.7% |
| LOPEZ PAGAN, CARLOS EMILIO | 1 | 88.6% | +6.1% |
| FIGUEROA, FELIX O | 1 | 58.1% | +14.8% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18599013 | ELECTRICAL CONNECTOR | LOPEZ PAGAN, CARLOS EMILIO | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 5 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18500294 | COMPACT RELIABLE ELECTRICAL CONNECTOR | FIGUEROA, FELIX O | 75d |
| 18809576 | RELIABLE RECEPTACLE CONNECTOR | PAUMEN, GARY F | — |
| 18783690 | COMPACT RELIABLE RECEPTACLE CONNECTOR | LEE, SEUNG H | — |
| 18761859 | RELIABLE HYBRID ELECTRICAL CONNECTOR | TUMEBO, TSION M | — |
| 18667252 | RELIABLE COMPACT RECEPTACLE CONNECTOR | BAILLARGEON, PAUL D | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 3 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18500294 | COMPACT RELIABLE ELECTRICAL CONNECTOR | FIGUEROA, FELIX O | 75d |
| 18783690 | COMPACT RELIABLE RECEPTACLE CONNECTOR | LEE, SEUNG H | — |
| 18761859 | RELIABLE HYBRID ELECTRICAL CONNECTOR | TUMEBO, TSION M | — |
| Art Unit | Apps |
|---|---|
| 2834 | 2 |
| 2831 | 2 |
| 2876 | 1 |
| 2875 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 18809576 | RELIABLE RECEPTACLE CONNECTOR | PAUMEN, GARY F | 2834 | §102§103 | Non-Final OA | — | Pending | Aug 20, 2024 |
| 18783690 | COMPACT RELIABLE RECEPTACLE CONNECTOR | LEE, SEUNG H | 2876 | §102§103 | Non-Final OA | — | Pending | Jul 25, 2024 |
| 18761859 | RELIABLE HYBRID ELECTRICAL CONNECTOR | TUMEBO, TSION M | 2875 | §102§103§112 | Non-Final OA | — | Pending | Jul 02, 2024 |
| 18667252 | RELIABLE COMPACT RECEPTACLE CONNECTOR | BAILLARGEON, PAUL D | 2831 | §102§103 | Non-Final OA | — | Pending | May 17, 2024 |
| 18599013 | ELECTRICAL CONNECTOR | LOPEZ PAGAN, CARLOS EMILIO | 2834 | §103 | Final Rejection | — | Pending | Mar 07, 2024 |
| 18500294 | COMPACT RELIABLE ELECTRICAL CONNECTOR | FIGUEROA, FELIX O | 2831 | §102§103 | Non-Final OA | 75d | Pending | Nov 02, 2023 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialAmphenol East Asia Electronic Technology (Shenzhen) Co., Ltd. has 6 pending office actions as of October 2026, spread across 4 art units and 6 examiners.
Gary F Paumen has the most, with 1 of Amphenol East Asia Electronic Technology (Shenzhen) Co., Ltd.'s pending office actions.
Mostly Semiconductors, Circuits & Optics (USPTO Tech Center 2800), based on where its pending office actions are examined.