Listed by the USPTO as FIGUEROA, FELIX O
Tech Center 3600 • Art Units: 2831 2833 3677
This examiner grants 58% of resolved cases
FIGUEROA, FELIX O has 933 resolved cases in Tech Center 3600 and art unit 2831. The allowance rate is 58.1%, the interview lift is 14.8%, and the median time to allowance is 1023 days. The substantial resolved-case volume provides useful historical context, while the allowance and timing figures support active management of claim scope and response sequencing.
The listed companies are Hubbell Incorporated, Sumitomo Electric Industries Ltd., and WAGO Verwaltungsgesellschaft mbH. The listed firms are Wissing Miller - Hubbell, Muncy, Geissler, Olds & Lowe, P.C., and Rankin, Hill & Clark LLP. Interviews may help address focused issues, but practitioners should rely on precise written distinctions and evidence to advance cases within the stated median timeline.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18536409 | TERMINAL ASSEMBLY | Non-Final OA | Caterpillar Inc. |
| 18420206 | CONNECTOR | Final Rejection | SUMITOMO WIRING SYSTEMS, LTD. |
| 18588313 | Material Removal from Inner Surface to Preserve Perception of Outer Surface Aesthetics | Non-Final OA | Lutron Technology Company LLC |
| 18407709 | CONDUCTIVE GASKET FOR USE WITH SPRING-BIASED CONTACTS | Non-Final OA | Outdoor Wireless Networks LLC |
| 17554868 | ONE ESD SELF-PROTECT METHOD FOR CONNECTOR | Final Rejection | Advanced Micro Devices, Inc. |
| 18409339 | CONTACT ORGANIZER FOR A PLUG CONNECTOR | Final Rejection | TE Connectivity Solutions GmbH |
| 18524984 | Electrical Connector, Connecting Body Between a Circuit Board and Electrical Connector | Non-Final OA | Tyco Electronics Japan G.K. |
| 18642087 | Connector Structure, Fitting Position Guarantee Lock, And First Connector | Non-Final OA | Yazaki Corporation |
| 18500294 | COMPACT RELIABLE ELECTRICAL CONNECTOR | Non-Final OA | Amphenol East Asia Electronic Technology (Shenzhen) Co., Ltd. |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy58.1% of resolved applications examined by Felix O Figueroa were allowed (933 resolved cases), compared with 72.3% across Art Unit 2831 over the last five years.
This examiner's interview lift is +14.8 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Felix O Figueroa took 1,023 days on average from filing to allowance.
Felix O Figueroa examines applications in Art Unit 2831 in Tech Center 3600 (Transportation, E-Commerce & Mechanical Systems).