Technology areas: Chemistry & Materials • Transportation, E-Commerce & Mechanical Systems
15 pending office actions • 12 art units • 15 examiners • 4 of 15 (27%) have an AI response strategy ready • 64 patents granted in the last 365 days
Archer Aviation Inc. has 17 pending office actions in Transportation, E-Commerce & Mechanical Systems. Each action is assigned to a distinct examiner, and the portfolio spans 13 distinct art units. The data shows broad examiner dispersion with some recurrence at the art-unit level.
BONZELL, PHILIP J is the busiest examiner, with 1 pending action. No examiner carries more than the reported single action in the busiest-examiner field, so docket coordination across separate examiner relationships is more relevant than managing one concentrated channel.
Based on the USPTO statutory response window for each pending office action. 3 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 3 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 + other | 2 (13%) |
| §103 only | 7 (47%) |
| §102 only | 1 (7%) |
| §112 only | 1 (7%) |
| Multi-statute (no §101) | 4 (27%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| KREINER, MICHAEL B | 1 | 82.4% | +13.3% |
| BONZELL, PHILIP J | 1 | 78.6% | +12.3% |
| TESSEMA, BESUFEKAD LEMMA | 1 | 45.5% | -3.8% |
| SHAIKH, FARIS ASIM | 1 | 68.8% | +20.6% |
| LEE, DANIEL H. | 1 | 70.7% | +25.1% |
| O'MALLEY, JOHN MARTIN | 1 | 56.3% | +62.5% |
| GMOSER, WILLIAM L | 1 | 78.0% | +29.5% |
| ENGLISH, PETER C | 1 | 33.5% | +26.9% |
| CHOWDHURI, SWARNA N | 1 | 76.6% | +18.9% |
| SERVAGNO, SANTINO MICHALE | 1 | — | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 6 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18551833 | COOLING FOR AN ELECTRIC DRIVE OF AN AIRCRAFT | KENERLY, TERRANCE L | 4d overdue |
| 19571376 | SYSTEMS AND METHODS FOR MANAGING EVTOL FLIGHT IN ICING | KREINER, MICHAEL B | — |
| 19081768 | TILT ACTUATOR FOR AIRCRAFT | ENGLISH, PETER C | — |
| 18705361 | BATTERY CELL COMPRISING DEGASSING CHANNELS AND/OR PATHS OF WEAKNESS | SERVAGNO, SANTINO MICHALE | — |
| 18218470 | FAIL-OPERATIONAL VTOL AIRCRAFT | IGUE, ROBERTO TOSHIHARU | — |
| 17968084 | Systems and Methods for Monitoring Energy System Performance of a Vehicle | ALSOMAIRY, IBRAHIM ABDOALATIF | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19271200 | SYSTEMS AND METHODS FOR LIFTER MOTOR COOLING IN EVTOL AIRCRAFT | GMOSER, WILLIAM L | 7d |
| 19571376 | SYSTEMS AND METHODS FOR MANAGING EVTOL FLIGHT IN ICING | KREINER, MICHAEL B | — |
| 19571415 | AERODYNAMIC DESIGN OF PROPELLER BLADES IN VTOL AIRCRAFT | BONZELL, PHILIP J | — |
| 19432849 | SYSTEM AND METHODS FOR BATTERY MANAGEMENT AND CONTROL OF AN ELECTRIC VEHICLE | SHAIKH, FARIS ASIM | — |
| 19429805 | THERMAL BARRIER COMPONENT FOR BATTERY ASSEMBLY AND BATTERY ASSEMBLY | LEE, DANIEL H. | — |
| 19403521 | SYSTEMS AND METHODS FOR AIRCRAFT LOAD ALLEVIATION | O'MALLEY, JOHN MARTIN | — |
| 19081768 | TILT ACTUATOR FOR AIRCRAFT | ENGLISH, PETER C | — |
| 19048285 | SYSTEMS AND ARCHITECTURES FOR CHARGING INFRASTRUCTURE | CHOWDHURI, SWARNA N | — |
| Art Unit | Apps |
|---|---|
| 3642 | 3 |
| 1746 | 2 |
| 3665 | 1 |
| 3668 | 1 |
| 3658 | 1 |
| 3647 | 1 |
| 3993 | 1 |
| 2836 | 1 |
| 1713 | 1 |
| 2834 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19571376 | SYSTEMS AND METHODS FOR MANAGING EVTOL FLIGHT IN ICING | KREINER, MICHAEL B | 3642 | §102§103§112 | Non-Final OA | — | Pending | Mar 18, 2026 |
| 19571415 | AERODYNAMIC DESIGN OF PROPELLER BLADES IN VTOL AIRCRAFT | BONZELL, PHILIP J | 3642 | §102 | Non-Final OA | — | Pending | Mar 18, 2026 |
| 19432833 | SYSTEM AND METHODS FOR BATTERY MANAGEMENT AND CONTROL OF AN ELECTRIC VEHICLE | TESSEMA, BESUFEKAD LEMMA | 3665 | §103 | Final Rejection | — | Pending | Dec 24, 2025 |
| 19432849 | SYSTEM AND METHODS FOR BATTERY MANAGEMENT AND CONTROL OF AN ELECTRIC VEHICLE | SHAIKH, FARIS ASIM | 3668 | §103 | Final Rejection | — | Pending | Dec 24, 2025 |
| 19429805 | THERMAL BARRIER COMPONENT FOR BATTERY ASSEMBLY AND BATTERY ASSEMBLY | LEE, DANIEL H. | 1746 | §103 | Non-Final OA | — | Pending | Dec 22, 2025 |
| 19403521 | SYSTEMS AND METHODS FOR AIRCRAFT LOAD ALLEVIATION | O'MALLEY, JOHN MARTIN | 3658 | §103 | Non-Final OA | — | Pending | Nov 28, 2025 |
| 19271200 | SYSTEMS AND METHODS FOR LIFTER MOTOR COOLING IN EVTOL AIRCRAFT | GMOSER, WILLIAM L | 3647 | §103 | Final Rejection | 7d | AI Ready | Jul 16, 2025 |
| 19081768 | TILT ACTUATOR FOR AIRCRAFT | ENGLISH, PETER C | 3993 | §102§112Other | Non-Final OA | — | Pending | Mar 17, 2025 |
| 19048285 | SYSTEMS AND ARCHITECTURES FOR CHARGING INFRASTRUCTURE | CHOWDHURI, SWARNA N | 2836 | §103 | Final Rejection | — | AI Ready | Feb 07, 2025 |
| 18705361 | BATTERY CELL COMPRISING DEGASSING CHANNELS AND/OR PATHS OF WEAKNESS | SERVAGNO, SANTINO MICHALE | 1713 | §103§112 | Non-Final OA | — | Pending | Apr 26, 2024 |
| 18494985 | METHOD OF FABRICATING A PRE-LITHIATED ELECTRODE AND LITHIUM-ION BATTERY CELL | KHANAL, ARTI | 1746 | §103 | Final Rejection | — | Pending | Oct 26, 2023 |
| 18551833 | COOLING FOR AN ELECTRIC DRIVE OF AN AIRCRAFT | KENERLY, TERRANCE L | 2834 | §102§103 | Final Rejection | 4d overdue | AI Ready | Sep 21, 2023 |
| 18218470 | FAIL-OPERATIONAL VTOL AIRCRAFT | IGUE, ROBERTO TOSHIHARU | 3741 | §101§103§112 | Non-Final OA | — | Pending | Jul 05, 2023 |
| 17968084 | Systems and Methods for Monitoring Energy System Performance of a Vehicle | ALSOMAIRY, IBRAHIM ABDOALATIF | 3667 | §101§103 | Final Rejection | — | Pending | Oct 18, 2022 |
| 17955103 | VERTICAL TAKE-OFF AND LANDING AIRCRAFT | DANGOL, ASHESH | 3642 | §112 | Final Rejection | 43d | AI Ready | Sep 28, 2022 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialArcher Aviation Inc. has 15 pending office actions as of October 2026, spread across 12 art units and 15 examiners.
Michael B Kreiner has the most, with 1 of Archer Aviation Inc.'s pending office actions.
Mostly Transportation, E-Commerce & Mechanical Systems (USPTO Tech Center 3600), based on where its pending office actions are examined.