Prosecution Insights
Last updated: May 29, 2026

Fastbrick Ip Pty Ltd.

5 pending office actions • 2 art units • 4 examiners • 0 of 5 (0%) have an AI response strategy ready • 8 patents granted in the last 365 days

Portfolio Summary

5
Total Pending OAs
5
Non-Final OAs
0
Final Rejections
0
Advisory / Quayle

Response Deadline Pressure

Based on the USPTO statutory response window for each pending office action. 5 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.

3
Overdue
0
Due this week
2
Due this month
0
Due in next 60 days
0
Due later

Deadline Fire Line

Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 5 of the docket's apps have a known mailing date.

-30dToday30d60d90d120d
Overdue (3)Due ≤ 30 days (2)

Case Difficulty Mix

Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.

0
Hard (0%)
3
Medium (60%)
0
Easy (0%)
2
Unknown (40%)

Rejection Statute Mix

BucketCases
§103 only3 (60%)
No statute on record2 (40%)

Industry Mix

How the docket's pending cases split across USPTO tech-center bands.

0
Life Sciences
0% of docket
2
Information Tech
40% of docket
0
Communications
0% of docket
0
Semiconductors
0% of docket
3
Mechanical / Eng
60% of docket
0
Business / Other
0% of docket

Time-on-OA Estimate

Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.

50 h
Manual time on pending OAs
10 h
Time saved (low, 20%)
18 h
Time saved (mid, 35%)
0.4 wks
FTE-weeks freed (mid)

Top Examiners on this docket

ExaminerApps on this docketAllow rateInterview lift
HOPKINS, DAVID ANDREW 2 28.8% +35.5%
HOLWERDA, STEPHEN 1 73.4% +19.8%
CAIN, AARON G 1 41.2% +27.9%
CULLEN, TANNER L 1 71.5% +16.2%

Hard Cases (2)

Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 2 ordered by deadline are shown.

App #TitleExaminerDue in
17603803 METHOD AND SYSTEM FOR DESIGNING BLOCK LAYOUTS FOR USE IN BLOCK PLACEMENT DURING CONSTRUCTION HOPKINS, DAVID ANDREW 50d overdue
17603834 METHOD AND SYSTEM FOR DESIGNING A BLOCK SEQUENCE FOR USE IN ORDERING BLOCKS FOR PLACEMENT DURING CONSTRUCTION HOPKINS, DAVID ANDREW 50d overdue

Interview Candidates (5)

Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 5 ordered by deadline are shown.

App #TitleExaminerDue in
17603803 METHOD AND SYSTEM FOR DESIGNING BLOCK LAYOUTS FOR USE IN BLOCK PLACEMENT DURING CONSTRUCTION HOPKINS, DAVID ANDREW 50d overdue
17603834 METHOD AND SYSTEM FOR DESIGNING A BLOCK SEQUENCE FOR USE IN ORDERING BLOCKS FOR PLACEMENT DURING CONSTRUCTION HOPKINS, DAVID ANDREW 50d overdue
18987994 ROBOT ARM KINEMATICS FOR END EFFECTOR CONTROL HOLWERDA, STEPHEN 1d overdue
18952574 PATH CORRECTION FOR END EFFECTOR CONTROL CULLEN, TANNER L 14d
18973870 VIRTUAL ROBOT BASE CAIN, AARON G 16d

Top Art Units

Art UnitApps
3656 3
2188 2

Pending Office Actions

App #TitleExaminerArt UnitStatutesStatusDue inAIFiled
18987994 ROBOT ARM KINEMATICS FOR END EFFECTOR CONTROL HOLWERDA, STEPHEN 3656 §103 Non-Final OA 1d overdue Pending Dec 19, 2024
18973870 VIRTUAL ROBOT BASE CAIN, AARON G 3656 §103 Non-Final OA 16d Pending Dec 09, 2024
18952574 PATH CORRECTION FOR END EFFECTOR CONTROL CULLEN, TANNER L 3656 §103 Non-Final OA 14d Pending Nov 19, 2024
17603803 METHOD AND SYSTEM FOR DESIGNING BLOCK LAYOUTS FOR USE IN BLOCK PLACEMENT DURING CONSTRUCTION HOPKINS, DAVID ANDREW 2188 Other Non-Final OA 50d overdue Pending Oct 14, 2021
17603834 METHOD AND SYSTEM FOR DESIGNING A BLOCK SEQUENCE FOR USE IN ORDERING BLOCKS FOR PLACEMENT DURING CONSTRUCTION HOPKINS, DAVID ANDREW 2188 Other Non-Final OA 50d overdue Pending Oct 14, 2021

Managing Fastbrick Ip Pty Ltd.'s Patent Portfolio?

IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.

Start Free Trial

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month