11 pending office actions • 8 art units • 11 examiners • 0 of 11 (0%) have an AI response strategy ready • 38 patents granted in the last 365 days
Based on the USPTO statutory response window for each pending office action. 11 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 11 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 2 (18%) |
| §103 only | 9 (82%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| YU, XIANG | 1 | 54.7% | +46.9% |
| LI, GUANG W | 1 | 77.8% | +24.4% |
| ISLAM, MOHAMMAD K | 1 | 83.2% | +16.4% |
| HUSSEIN, HASSAN A | 1 | 58.1% | +52.8% |
| KABIR, SAAD M | 1 | 68.5% | +23.3% |
| BOOKER, KELVIN | 1 | 78.9% | +6.6% |
| BRYANT, CHRISTIAN THOMAS | 1 | 79.0% | +26.3% |
| FREDERIKSEN, DAVID B | 1 | 86.3% | +13.7% |
| SUMMERS, KIERSTEN V | 1 | 11.9% | +14.4% |
| SUN, XIUQIN | 1 | 72.9% | +3.6% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18510467 | EARTHQUAKE DETECTION AND MONITORING USING SMART UTILITY METERS | ISLAM, MOHAMMAD K | 13d |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 3 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18446102 | TECHNIQUES FOR QUANTIFYING BEHIND-THE-METER SOLAR POWER GENERATION | BRYANT, CHRISTIAN THOMAS | 73d overdue |
| 18361209 | METHODS AND APPARATUS OF DETERMINING BYPASS OF ELECTRICAL METER | FREDERIKSEN, DAVID B | 21d |
| 18314318 | DETECTION OF UNINTENDED CONSUMPTION OF A UTILITY COMMODITY BASED ON METROLOGY DATA | SUMMERS, KIERSTEN V | 26d |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18446102 | TECHNIQUES FOR QUANTIFYING BEHIND-THE-METER SOLAR POWER GENERATION | BRYANT, CHRISTIAN THOMAS | 73d overdue |
| 18504019 | CERTIFICATE CHAIN COMPRESSION TO EXTEND NODE OPERATIONAL LIFETIME | HUSSEIN, HASSAN A | 30d overdue |
| 18510467 | EARTHQUAKE DETECTION AND MONITORING USING SMART UTILITY METERS | ISLAM, MOHAMMAD K | 13d |
| 18361209 | METHODS AND APPARATUS OF DETERMINING BYPASS OF ELECTRICAL METER | FREDERIKSEN, DAVID B | 21d |
| 18314318 | DETECTION OF UNINTENDED CONSUMPTION OF A UTILITY COMMODITY BASED ON METROLOGY DATA | SUMMERS, KIERSTEN V | 26d |
| 18923174 | DETERMINING NETWORK RELIABILITY USING MESSAGE SUCCESS RATES | YU, XIANG | 30d |
| 18444459 | Time Synchronization in High Latency Networks | LI, GUANG W | 41d |
| 18369686 | Meter-to-Transformer Connectivity Correction | KABIR, SAAD M | 43d |
| Art Unit | Apps |
|---|---|
| 2857 | 3 |
| 2119 | 2 |
| 2455 | 1 |
| 2478 | 1 |
| 2497 | 1 |
| 2858 | 1 |
| 3626 | 1 |
| 2447 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 18923174 | DETERMINING NETWORK RELIABILITY USING MESSAGE SUCCESS RATES | YU, XIANG | 2455 | §103 | Non-Final OA | 30d | Pending | Oct 22, 2024 |
| 18444459 | Time Synchronization in High Latency Networks | LI, GUANG W | 2478 | §103 | Non-Final OA | 41d | Pending | Feb 16, 2024 |
| 18510467 | EARTHQUAKE DETECTION AND MONITORING USING SMART UTILITY METERS | ISLAM, MOHAMMAD K | 2857 | §103 | Non-Final OA | 13d | Pending | Nov 15, 2023 |
| 18504019 | CERTIFICATE CHAIN COMPRESSION TO EXTEND NODE OPERATIONAL LIFETIME | HUSSEIN, HASSAN A | 2497 | §103 | Non-Final OA | 30d overdue | Pending | Nov 07, 2023 |
| 18369686 | Meter-to-Transformer Connectivity Correction | KABIR, SAAD M | 2119 | §103 | Non-Final OA | 43d | Pending | Sep 18, 2023 |
| 18235103 | DISTRIBUTED ENERGY RESOURCES AGGREGATED OPTIMIZATION | BOOKER, KELVIN | 2119 | §103 | Non-Final OA | 14d | Pending | Aug 17, 2023 |
| 18446102 | TECHNIQUES FOR QUANTIFYING BEHIND-THE-METER SOLAR POWER GENERATION | BRYANT, CHRISTIAN THOMAS | 2857 | §101 | Final Rejection | 73d overdue | Pending | Aug 08, 2023 |
| 18361209 | METHODS AND APPARATUS OF DETERMINING BYPASS OF ELECTRICAL METER | FREDERIKSEN, DAVID B | 2858 | §101 | Non-Final OA | 21d | Pending | Jul 28, 2023 |
| 18314318 | DETECTION OF UNINTENDED CONSUMPTION OF A UTILITY COMMODITY BASED ON METROLOGY DATA | SUMMERS, KIERSTEN V | 3626 | §103 | Final Rejection | 26d | Pending | May 09, 2023 |
| 18089353 | VOLTAGE GRID ANOMALY DETECTION | SUN, XIUQIN | 2857 | §103 | Non-Final OA | 28d | Pending | Dec 27, 2022 |
| 18069130 | FORCED FORWARDING ADDRESSING COMMUNICATIONS | NDIAYE, CHEIKH T | 2447 | §103 | Non-Final OA | 14d | Pending | Dec 20, 2022 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial