Technology areas: Chemistry & Materials • Medical Devices & Mechanical Engineering
13 pending office actions • 7 art units • 13 examiners • 0 of 13 (0%) have an AI response strategy ready • 34 patents granted in the last 365 days
LM Wind Power A/S has 13 pending office actions in Medical Devices & Mechanical Engineering. The matters involve 12 examiners and 7 art units, showing broad examiner distribution with more concentrated use of technical groups. The portfolio therefore benefits from art-unit tracking even though most examiner assignments appear isolated.
FISHER, WESLEY LE is the busiest identified examiner, with 2 pending matters. Counsel can examine that repeated assignment for consistent treatment, while maintaining a coordinated approach to technical disclosure and claim amendments across the remaining art units.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §103 only | 3 (23%) |
| §102 only | 2 (15%) |
| Multi-statute (no §101) | 8 (62%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| MARIEN, ANDREW JAMES | 1 | 80.0% | +15.0% |
| BROCKMAN, ELDON T | 1 | 85.1% | +5.7% |
| HAGHIGHIAN, BEHNOUSH | 1 | 78.8% | +12.7% |
| DANIELS, MATTHEW J | 1 | 69.7% | +25.3% |
| BEEBE, JOSHUA R | 1 | 67.6% | +26.1% |
| FISHER, WESLEY LE | 1 | 82.4% | +14.1% |
| BOOTH, ALEXANDER D | 1 | 54.4% | +37.6% |
| ROY, DEBJANI | 1 | 75.6% | +14.2% |
| MALEKZADEH, SEYED MASOUD | 1 | 67.2% | +31.9% |
| KORANG-BEHESHTI, YOSSEF | 1 | 74.1% | +10.5% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19134453 | BASE ELEMENTS AND EDGE ELEMENTS FOR WIND TURBINE BLADE SECTIONS | BROCKMAN, ELDON T | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19140589 | WIND TURBINE BLADE WITH A DEICING SYSTEM | MARIEN, ANDREW JAMES | — |
| 19169166 | MOULD SYSTEM AND A METHOD FOR MOULDING A BLADE SHELL OF A WIND TURBINE BLADE | DANIELS, MATTHEW J | — |
| 19116659 | WIND TURBINE BLADE HAVING AN ELECTRO-THERMAL SYSTEM | BEEBE, JOSHUA R | — |
| 18874125 | WIND TURBINE BLADE WITH A LIGHTNING RECEPTOR | FISHER, WESLEY LE | — |
| 18867959 | METHOD OF IMPROVING THE ADHESIVE BONDING OF WIND TURBINE BLADE COMPONENTS | BOOTH, ALEXANDER D | — |
| 18718935 | Method for manufacturing a preform for a wind turbine blade | MALEKZADEH, SEYED MASOUD | — |
| 18558530 | A ROTOR BLADE FOR A WIND TURBINE, A WIND TURBINE, AND A METHOD FOR MANUFACTURING THE ROTOR BLADE | PRUITT, JUSTIN A | — |
| 18274709 | A MOULD ASSEMBLY FOR MANUFACTURING A WIND TURBINE BLADE SHELL PART | PAGE, HANA C | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19140589 | WIND TURBINE BLADE WITH A DEICING SYSTEM | MARIEN, ANDREW JAMES | — |
| 19121516 | LUBRICANT RETENTION SYSTEMS | HAGHIGHIAN, BEHNOUSH | — |
| 19169166 | MOULD SYSTEM AND A METHOD FOR MOULDING A BLADE SHELL OF A WIND TURBINE BLADE | DANIELS, MATTHEW J | — |
| 19116659 | WIND TURBINE BLADE HAVING AN ELECTRO-THERMAL SYSTEM | BEEBE, JOSHUA R | — |
| 18874125 | WIND TURBINE BLADE WITH A LIGHTNING RECEPTOR | FISHER, WESLEY LE | — |
| 18867959 | METHOD OF IMPROVING THE ADHESIVE BONDING OF WIND TURBINE BLADE COMPONENTS | BOOTH, ALEXANDER D | — |
| 18833872 | MOLD ASSEMBLY FOR INFUSING A SPAR CAP AND RELATED METHODS | ROY, DEBJANI | — |
| 18718935 | Method for manufacturing a preform for a wind turbine blade | MALEKZADEH, SEYED MASOUD | — |
| Art Unit | Apps |
|---|---|
| 3745 | 7 |
| 1742 | 1 |
| 1749 | 1 |
| 1741 | 1 |
| 1754 | 1 |
| 2857 | 1 |
| 1745 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19140589 | WIND TURBINE BLADE WITH A DEICING SYSTEM | MARIEN, ANDREW JAMES | 3745 | §103§112 | Non-Final OA | — | Pending | Jun 18, 2025 |
| 19134453 | BASE ELEMENTS AND EDGE ELEMENTS FOR WIND TURBINE BLADE SECTIONS | BROCKMAN, ELDON T | 3745 | §102 | Non-Final OA | — | Pending | May 30, 2025 |
| 19121516 | LUBRICANT RETENTION SYSTEMS | HAGHIGHIAN, BEHNOUSH | 3745 | §102 | Final Rejection | — | Pending | Apr 16, 2025 |
| 19169166 | MOULD SYSTEM AND A METHOD FOR MOULDING A BLADE SHELL OF A WIND TURBINE BLADE | DANIELS, MATTHEW J | 1742 | §103§112 | Non-Final OA | — | Pending | Apr 03, 2025 |
| 19116659 | WIND TURBINE BLADE HAVING AN ELECTRO-THERMAL SYSTEM | BEEBE, JOSHUA R | 3745 | §103§112 | Non-Final OA | — | Pending | Mar 28, 2025 |
| 18874125 | WIND TURBINE BLADE WITH A LIGHTNING RECEPTOR | FISHER, WESLEY LE | 3745 | §103§112 | Non-Final OA | — | Pending | Dec 12, 2024 |
| 18867959 | METHOD OF IMPROVING THE ADHESIVE BONDING OF WIND TURBINE BLADE COMPONENTS | BOOTH, ALEXANDER D | 1749 | §103§112 | Non-Final OA | — | Pending | Nov 21, 2024 |
| 18833872 | MOLD ASSEMBLY FOR INFUSING A SPAR CAP AND RELATED METHODS | ROY, DEBJANI | 1741 | §103 | Final Rejection | — | Pending | Jul 26, 2024 |
| 18718935 | Method for manufacturing a preform for a wind turbine blade | MALEKZADEH, SEYED MASOUD | 1754 | §102§112 | Final Rejection | — | Pending | Jun 12, 2024 |
| 18695665 | SYSTEM AND METHOD FOR ESTIMATING ENERGY PRODUCTION FROM A WIND TURBINE | KORANG-BEHESHTI, YOSSEF | 2857 | §103 | Final Rejection | — | Pending | Mar 26, 2024 |
| 18558530 | A ROTOR BLADE FOR A WIND TURBINE, A WIND TURBINE, AND A METHOD FOR MANUFACTURING THE ROTOR BLADE | PRUITT, JUSTIN A | 3745 | §103§112 | Final Rejection | — | Pending | Nov 01, 2023 |
| 18274709 | A MOULD ASSEMBLY FOR MANUFACTURING A WIND TURBINE BLADE SHELL PART | PAGE, HANA C | 1745 | §103§112 | Non-Final OA | — | Pending | Jul 27, 2023 |
| 18271076 | WIND TURBINE BLADE COMPRISING A PRE-MANUFACTURED SPAR CAP SURROUNDED BY A PRE-IMPREGNATED LAYER | LAMBERT, WAYNE A | 3745 | §103 | Non-Final OA | — | Pending | Jul 06, 2023 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialLM Wind Power A/S has 13 pending office actions as of October 2026, spread across 7 art units and 13 examiners.
Andrew James Marien has the most, with 1 of LM Wind Power A/S's pending office actions.
Mostly Medical Devices & Mechanical Engineering (USPTO Tech Center 3700), based on where its pending office actions are examined.