Technology areas: Semiconductors, Circuits & Optics • Transportation, E-Commerce & Mechanical Systems
3 pending office actions • 2 art units • 3 examiners • 0 of 3 (0%) have an AI response strategy ready • 1 patents granted in the last 365 days
Manitowoc Crane Group France is currently navigating 3 pending office actions within the Semiconductors, Circuits & Optics technology area. This portfolio involves 3 distinct examiners and 2 distinct art units, showing a moderate level of concentration in the technical review process. The use of 2 distinct art units for 3 actions suggests that the company's innovations are focused within a few specific areas, allowing for some consistency in examination standards.
The busiest examiner for this portfolio is JOHNSON, RYAN, who is responsible for 1 pending office action. Having 1 action assigned to each examiner out of 3 total means the workload is evenly distributed, requiring the company to build rapport with multiple individuals simultaneously. However, with 3 distinct examiners involved overall, the 3 pending office actions are subject to a variety of individual examination styles. This distribution requires a strategy that accounts for the 2 distinct art units that oversee the portfolio, ensuring that the legal approach remains cohesive across the different technical groups.
Based on the USPTO statutory response window for each pending office action. 1 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 + other | 2 (67%) |
| No statute on record | 1 (33%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| JOHNSON, RYAN | 1 | 83.8% | +15.7% |
| SHECHTMAN, SEAN P | 1 | 75.4% | +22.1% |
| SINGH, GURKANWALJIT | 1 | 60.9% | +26.6% |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 2 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18778920 | AUTOMATED PROCESS FOR ESTABLISHING AN INVENTORY OF WORK CARRIED OUT BY LIFTING EQUIPMENT | SINGH, GURKANWALJIT | 46d overdue |
| 18890686 | METHOD FOR MONITORING ELECTRICAL POWER CONSUMPTION OF A CRANE | SHECHTMAN, SEAN P | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 3 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18778920 | AUTOMATED PROCESS FOR ESTABLISHING AN INVENTORY OF WORK CARRIED OUT BY LIFTING EQUIPMENT | SINGH, GURKANWALJIT | 46d overdue |
| 19282499 | METHOD FOR MANAGING THE ELECTRIC POWER SUPPLY OF A CRANE FROM A PRIMARY SOURCE AND FROM A RECHARGEABLE SECONDARY SOURCE | JOHNSON, RYAN | — |
| 18890686 | METHOD FOR MONITORING ELECTRICAL POWER CONSUMPTION OF A CRANE | SHECHTMAN, SEAN P | — |
| Art Unit | Apps |
|---|---|
| 2896 | 1 |
| 3625 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19282499 | METHOD FOR MANAGING THE ELECTRIC POWER SUPPLY OF A CRANE FROM A PRIMARY SOURCE AND FROM A RECHARGEABLE SECONDARY SOURCE | JOHNSON, RYAN | — | Other | Non-Final OA | — | Pending | Jul 28, 2025 |
| 18890686 | METHOD FOR MONITORING ELECTRICAL POWER CONSUMPTION OF A CRANE | SHECHTMAN, SEAN P | 2896 | §101§102§112 | Non-Final OA | — | Pending | Sep 19, 2024 |
| 18778920 | AUTOMATED PROCESS FOR ESTABLISHING AN INVENTORY OF WORK CARRIED OUT BY LIFTING EQUIPMENT | SINGH, GURKANWALJIT | 3625 | §101§103 | Final Rejection | 46d overdue | Pending | Jul 20, 2024 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialManitowoc Crane Group France has 3 pending office actions as of November 2026, spread across 2 art units and 3 examiners.
Ryan Johnson has the most, with 1 of Manitowoc Crane Group France's pending office actions.
Mostly Semiconductors, Circuits & Optics (USPTO Tech Center 2800), based on where its pending office actions are examined.