Technology area: Networking & Security
19 pending office actions • 6 art units • 19 examiners • 0 of 19 (0%) have an AI response strategy ready • 17 patents granted in the last 365 days
Mavenir Systems Inc. currently manages 17 pending office actions within the Networking & Security technology area. These actions are distributed among 17 distinct examiners, ensuring that each of the 17 pending office actions is reviewed by a unique individual. This complete lack of examiner overlap suggests that the company's prosecution outcomes are highly dependent on a wide variety of individual examiner styles and interpretations. The prosecution activity is concentrated within 5 distinct art units.
SCHWARTZ, JOSHUA L is identified as the busiest examiner, yet he is responsible for only 1 busiest examiner pending action. This means that the workload is perfectly distributed across the 17 distinct examiners, with no single person handling more than one case. This structure indicates that while the company's filings are technically focused within 5 distinct art units, the patent office has assigned a large pool of examiners to handle the volume. Practitioners should be aware that even within the same art unit, the experience may vary significantly due to the large number of different examiners involved in the Networking & Security portfolio.
Based on the USPTO statutory response window for each pending office action. 2 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 + other | 1 (5%) |
| §103 only | 7 (37%) |
| §102 only | 3 (16%) |
| Multi-statute (no §101) | 8 (42%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| GUZMAN, JAVIER O | 1 | 82.1% | +19.9% |
| SCHWARTZ, JOSHUA L | 1 | 68.1% | +21.5% |
| VANG, MENG | 1 | 78.2% | +26.9% |
| AHMED, ABDULLAHI | 1 | 85.8% | +2.1% |
| ABU ROUMI, MAHRAN Y | 1 | 72.9% | +32.6% |
| SOE, KYAW Z | 1 | 89.8% | +9.5% |
| LEE, JUSTIN YE | 1 | 80.1% | +10.9% |
| CHOWDHURY, MAHBUBUL BAR | 1 | 83.5% | +15.1% |
| NGUYEN, BRANDON A | 1 | — | — |
| LIN, SHERMAN L | 1 | 29.2% | +37.1% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 4 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19097934 | UE COMMUNICATION EXPERIENCE THROUGH RNA OPTIMIZATION | GUZMAN, JAVIER O | — |
| 18947066 | METHOD AND APPARATUS FOR USER PLANE GEO REDUNDANCY WITH SESSION CONTINUITY | AHMED, ABDULLAHI | — |
| 18907799 | METHOD TO SHUT DOWN AND RESTART RADIO UNITS IN OPEN-RAN CBRS NETWORKS | SOE, KYAW Z | — |
| 18890920 | METHOD AND APPARATUS FOR ENCODING RAN PARAMETERS OVER E2 INTERFACE USING E2SM-RC FOR TRAFFIC STEERING-BASED SLA OPTIMIZATION UPON CELL SHUTDOWN FOR ENERGY SAVINGS ACTIVATION | LEE, JUSTIN YE | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18794552 | CU-DU FLOW CONTROL OPTIMIZATIONS FOR LOSSY MIDHAUL IN O-RAN NETWORKS | LIN, SHERMAN L | 15d |
| 18635603 | Downlink Throughput of 5G NR Using PUCCH HARQ Resource Assignment | CHEEMA, HASAN ALI | 35d |
| 19035211 | Method and Apparatus for Passive Intermodulation (PIM) Interference Cancellation in Dual-band Wireless Network | SCHWARTZ, JOSHUA L | — |
| 18948812 | SEGMENT ROUTING IPV6 EXTENSION TO SUPPORT MULTICAST IN RAN AND PC | VANG, MENG | — |
| 18888251 | OPTIMIZED MANAGEMENT OF BANDWIDTH PARTS FOR CELLULAR NETWORKS | CHOWDHURY, MAHBUBUL BAR | — |
| 18793198 | Method to Categorize SCG Handover Failures in Dual Connectivity | MATTIS, JASON E | — |
| 18660331 | SYSTEM AND METHOD FOR SIB1 OPTIMIZATION DURING NSA AND SA TO NSA CHANGE FOR IMPROVED CELL PERFORMANCE | YOUNG, STEVE R | — |
| 18656872 | SYSTEMS AND METHODS FOR DISTRIBUTED UNIT OR CENTRALIZED UNIT FLOW CONTROL OPTIMIZATIONS FOR HIGHLY SCALABLE CELLULAR SYSTEMS | PANCHOLI, RINA C | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 7 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18794552 | CU-DU FLOW CONTROL OPTIMIZATIONS FOR LOSSY MIDHAUL IN O-RAN NETWORKS | LIN, SHERMAN L | 15d |
| 19097934 | UE COMMUNICATION EXPERIENCE THROUGH RNA OPTIMIZATION | GUZMAN, JAVIER O | — |
| 19035211 | Method and Apparatus for Passive Intermodulation (PIM) Interference Cancellation in Dual-band Wireless Network | SCHWARTZ, JOSHUA L | — |
| 18948812 | SEGMENT ROUTING IPV6 EXTENSION TO SUPPORT MULTICAST IN RAN AND PC | VANG, MENG | — |
| 18944156 | METHOD AND APPARATUS TO DETECT AND CORRECT RESOURCE ALLOCATION MISMATCH IN DIFFERENT RAN NODES | ABU ROUMI, MAHRAN Y | — |
| 18890920 | METHOD AND APPARATUS FOR ENCODING RAN PARAMETERS OVER E2 INTERFACE USING E2SM-RC FOR TRAFFIC STEERING-BASED SLA OPTIMIZATION UPON CELL SHUTDOWN FOR ENERGY SAVINGS ACTIVATION | LEE, JUSTIN YE | — |
| 18888251 | OPTIMIZED MANAGEMENT OF BANDWIDTH PARTS FOR CELLULAR NETWORKS | CHOWDHURY, MAHBUBUL BAR | — |
| Art Unit | Apps |
|---|---|
| 2465 | 3 |
| 2477 | 2 |
| 2443 | 1 |
| 2447 | 1 |
| 2419 | 1 |
| 2415 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19097934 | UE COMMUNICATION EXPERIENCE THROUGH RNA OPTIMIZATION | GUZMAN, JAVIER O | — | §103 | Non-Final OA | — | Pending | Apr 02, 2025 |
| 19035211 | Method and Apparatus for Passive Intermodulation (PIM) Interference Cancellation in Dual-band Wireless Network | SCHWARTZ, JOSHUA L | — | §102§103 | Non-Final OA | — | Pending | Jan 23, 2025 |
| 18948812 | SEGMENT ROUTING IPV6 EXTENSION TO SUPPORT MULTICAST IN RAN AND PC | VANG, MENG | 2443 | §101§103 | Non-Final OA | — | Pending | Nov 15, 2024 |
| 18947066 | METHOD AND APPARATUS FOR USER PLANE GEO REDUNDANCY WITH SESSION CONTINUITY | AHMED, ABDULLAHI | — | §102 | Non-Final OA | — | Pending | Nov 14, 2024 |
| 18944156 | METHOD AND APPARATUS TO DETECT AND CORRECT RESOURCE ALLOCATION MISMATCH IN DIFFERENT RAN NODES | ABU ROUMI, MAHRAN Y | — | §103 | Non-Final OA | — | Pending | Nov 12, 2024 |
| 18907799 | METHOD TO SHUT DOWN AND RESTART RADIO UNITS IN OPEN-RAN CBRS NETWORKS | SOE, KYAW Z | — | §103 | Non-Final OA | — | Pending | Oct 07, 2024 |
| 18890920 | METHOD AND APPARATUS FOR ENCODING RAN PARAMETERS OVER E2 INTERFACE USING E2SM-RC FOR TRAFFIC STEERING-BASED SLA OPTIMIZATION UPON CELL SHUTDOWN FOR ENERGY SAVINGS ACTIVATION | LEE, JUSTIN YE | — | §102 | Non-Final OA | — | Pending | Sep 20, 2024 |
| 18888251 | OPTIMIZED MANAGEMENT OF BANDWIDTH PARTS FOR CELLULAR NETWORKS | CHOWDHURY, MAHBUBUL BAR | — | §102§103 | Non-Final OA | — | Pending | Sep 18, 2024 |
| 18884343 | Method and Apparatus to Encode RAN OAM-Related Data Over the R1 and Other O-RAN Open Interfaces Using Generic Data Encoding Model and Information Semantics | NGUYEN, BRANDON A | — | §103 | Non-Final OA | — | Pending | Sep 13, 2024 |
| 18794552 | CU-DU FLOW CONTROL OPTIMIZATIONS FOR LOSSY MIDHAUL IN O-RAN NETWORKS | LIN, SHERMAN L | 2447 | §103 | Final Rejection | 15d | Pending | Aug 05, 2024 |
| 18793198 | Method to Categorize SCG Handover Failures in Dual Connectivity | MATTIS, JASON E | — | §103§112 | Non-Final OA | — | Pending | Aug 02, 2024 |
| 18779313 | Virtual RAN Cell Site Resiliency and Energy Efficiency | NIKMANESH, SEAHVOSH J | — | §102 | Non-Final OA | — | Pending | Jul 22, 2024 |
| 18772601 | Systems and Methods for Energy and Fronthaul Bandwidth Efficient Uplink Performance Improvements for O-RAN-based Radio Access Networks | ALSOMIRI, MAJDI A | 2465 | §103 | Non-Final OA | — | Pending | Jul 15, 2024 |
| 18679779 | Method to Improve 5G NR PDCCH Decoding Using CCE Interference Randomization | BALLOWE, CALEB JAMES | 2419 | §103 | Final Rejection | — | Pending | May 31, 2024 |
| 18660331 | SYSTEM AND METHOD FOR SIB1 OPTIMIZATION DURING NSA AND SA TO NSA CHANGE FOR IMPROVED CELL PERFORMANCE | YOUNG, STEVE R | 2477 | §102§103 | Final Rejection | — | Pending | May 10, 2024 |
| 18656872 | SYSTEMS AND METHODS FOR DISTRIBUTED UNIT OR CENTRALIZED UNIT FLOW CONTROL OPTIMIZATIONS FOR HIGHLY SCALABLE CELLULAR SYSTEMS | PANCHOLI, RINA C | 2477 | §102§103§112 | Non-Final OA | — | Pending | May 07, 2024 |
| 18647412 | SYSTEM AND METHOD FOR REDUCING INTER-CELL INTERFERENCE IN CELLULAR NETWORKS | NGUYEN, VAN TA | 2465 | §103§112 | Non-Final OA | — | Pending | Apr 26, 2024 |
| 18644203 | METHOD AND SYSTEM FOR DATA ROUTING FOR SPLIT-BEARER AT A CELLULAR BASE STATION FOR A DUAL CONNECTIVITY NETWORK ARCHITECTURE | WONG, XAVIER S | 2415 | §102§103 | Non-Final OA | — | Pending | Apr 24, 2024 |
| 18635603 | Downlink Throughput of 5G NR Using PUCCH HARQ Resource Assignment | CHEEMA, HASAN ALI | 2465 | §103§112 | Final Rejection | 35d | Pending | Apr 15, 2024 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial