Prosecution Insights
Last updated: November 12, 2026

Network Rail Infrastructure Limited

Technology area: Transportation, E-Commerce & Mechanical Systems

1 pending office actions • 1 art units • 1 examiners • 0 of 1 (0%) have an AI response strategy ready

Analysis

Network Rail Infrastructure Limited has 1 pending office action in Transportation, E-Commerce & Mechanical Systems. The matter is assigned to 1 examiner and 1 art unit, with BROWNE, SCOTT A listed as the busiest examiner and associated with 1 pending matter.

The profile presents one direct prosecution path. The immediate practitioner focus is the pending action, its assigned art unit, and the examiner’s treatment of the claims.

Written from this page's own data; every figure is computed from USPTO records and verified before publication.

Portfolio Summary

1
Total Pending OAs
1
Non-Final OAs
0
Final Rejections
0
Advisory / Quayle

Case Difficulty Mix

Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.

1
Hard (100%)
0
Medium (0%)
0
Easy (0%)
0
Unknown (0%)

Rejection Statute Mix

BucketCases
Multi-statute (no §101)1 (100%)

Industry Mix

How the docket's pending cases split across USPTO tech-center bands.

0
Life Sciences
0% of docket
0
Information Tech
0% of docket
0
Communications
0% of docket
0
Semiconductors
0% of docket
1
Mechanical / Eng
100% of docket
0
Business / Other
0% of docket

Time-on-OA Estimate

Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.

10 h
Manual time on pending OAs
2 h
Time saved (low, 20%)
4 h
Time saved (mid, 35%)
0.1 wks
FTE-weeks freed (mid)

Top Examiners on this docket

ExaminerApps on this docketAllow rateInterview lift
BROWNE, SCOTT A 1 71.9% +35.9%

Hard Cases (1)

Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 1 ordered by deadline are shown.

App #TitleExaminerDue in
18992886 PREDICTION OF CYCLIC TOP EVENTS BROWNE, SCOTT A —

Interview Candidates (1)

Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 1 ordered by deadline are shown.

App #TitleExaminerDue in
18992886 PREDICTION OF CYCLIC TOP EVENTS BROWNE, SCOTT A —

Top Art Units

Art UnitApps
3666 1

Pending Office Actions

App #TitleExaminerArt UnitStatutesStatusDue inAIFiled
18992886 PREDICTION OF CYCLIC TOP EVENTS BROWNE, SCOTT A 3666 §103§112 Non-Final OA — Pending Jan 09, 2025

Managing Network Rail Infrastructure Limited's Patent Portfolio?

IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.

Start Free Trial

Frequently Asked Questions

How many pending USPTO office actions does Network Rail Infrastructure Limited have?

Network Rail Infrastructure Limited has 1 pending office actions as of November 2026, spread across 1 art units and 1 examiners.

Which USPTO examiner handles the most Network Rail Infrastructure Limited applications?

Scott A Browne has the most, with 1 of Network Rail Infrastructure Limited's pending office actions.

What technology area are Network Rail Infrastructure Limited's patent applications in?

Mostly Transportation, E-Commerce & Mechanical Systems (USPTO Tech Center 3600), based on where its pending office actions are examined.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month