Technology areas: Networking & Security • Communications
101 pending office actions • 49 art units • 90 examiners • 0 of 101 (0%) have an AI response strategy ready • 167 patents granted in the last 365 days
Ofinno LLC has 109 pending office actions in Networking & Security. The matters involve 98 distinct examiners and 50 distinct art units, indicating extensive examiner dispersion across a substantial group of technical examination units.
MAPA, MICHAEL Y is the busiest examiner, with 4 pending matters. Since the busiest assignment covers only a limited segment of the docket, counsel should emphasize portfolio-wide response consistency, issue tracking, and coordination across prosecution teams.
Based on the USPTO statutory response window for each pending office action. 28 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 28 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §103 only | 48 (48%) |
| §102 only | 9 (9%) |
| §112 only | 1 (1%) |
| Double-patenting only | 7 (7%) |
| Double-patenting + other | 1 (1%) |
| Multi-statute (no §101) | 30 (30%) |
| No statute on record | 5 (5%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| MAPA, MICHAEL Y | 4 | 71.4% | +27.0% |
| YOUNG, STEVE R | 2 | 67.4% | +19.2% |
| YUEN, KAN | 2 | 88.8% | +13.7% |
| LOUIS-FILS, NICOLE M | 2 | 71.6% | +35.3% |
| GUADALUPE CRUZ, AIXA AMYR | 2 | 73.0% | +19.5% |
| CAMPERO MIRAMONTE, MARIO RICARDO | 2 | 60.0% | +26.7% |
| HAQUE, ABUSAYEED M | 2 | 92.1% | -2.6% |
| TOWFIGHI, AFSHAWN M | 2 | 87.7% | +9.0% |
| WAQAS, SAAD A | 2 | 74.3% | +37.6% |
| CAI, WAYNE HUU | 1 | 79.6% | +15.5% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 4 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18431460 | Connection Failure Report for Multiple Transmission and Reception Points | TOWFIGHI, AFSHAWN M | 37d overdue |
| 19198532 | Reporting of Mobility Parameters | YUEN, KAN | — |
| 18819463 | Monitoring Occasion Determination in Control Channel Repetition | HAQUE, ABUSAYEED M | — |
| 18809658 | Multiple Physical Downlink Shared Channel Control Information | HAQUE, ABUSAYEED M | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18127947 | Handover Procedures with Beam Management | YUEN, KAN | 92d overdue |
| 18505422 | Bandwidth Part Switching for Cell | SANTOS, FRANCESCA LIMA | 91d overdue |
| 18501502 | Priority Indication for Multiple Consecutive Slots Transmission | BEDNASH, JOSEPH A | 71d overdue |
| 18397799 | Determination of Connection Failure | LIU, SIMING | 50d overdue |
| 19012159 | Template Matching Prediction with Block Vector Difference Refinement | BRUMFIELD, SHANIKA M | 46d overdue |
| 18930685 | Quality-of-Experience Report of Measurement | HAJ SAID, FADI | 15d overdue |
| 18604809 | Base Station Selection for Time Resiliency Service | ABU ROUMI, MAHRAN Y | 8d overdue |
| 18405825 | Mobile Base Station Relay Access | GAO, JING | 27d |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18127947 | Handover Procedures with Beam Management | YUEN, KAN | 92d overdue |
| 18206388 | Access Restriction of Wireless Device | LOUIS-FILS, NICOLE M | 28d overdue |
| 19329083 | Uplink Transmissions with Multiple Beams | MAPA, MICHAEL Y | 4d overdue |
| 19577480 | Link Selection During a Roaming Procedure | YOUNG, STEVE R | — |
| 19406376 | Multiple Timing Advance Groups | CAI, WAYNE HUU | — |
| 19198532 | Reporting of Mobility Parameters | YUEN, KAN | — |
| 19181834 | NETWORK SLICE MANAGEMENT | LOUIS-FILS, NICOLE M | — |
| 19004984 | Quality of Experience Based Handover | MAPA, MICHAEL Y | — |
| Art Unit | Apps |
|---|---|
| 2466 | 6 |
| 2645 | 5 |
| 2477 | 4 |
| 2647 | 4 |
| 2469 | 4 |
| 2411 | 4 |
| 2468 | 4 |
| 2464 | 3 |
| 2641 | 3 |
| 2444 | 3 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19577480 | Link Selection During a Roaming Procedure | YOUNG, STEVE R | 2477 | §102§103 | Non-Final OA | — | Pending | Mar 25, 2026 |
| 19406376 | Multiple Timing Advance Groups | CAI, WAYNE HUU | 2644 | §103 | Final Rejection | — | Pending | Dec 02, 2025 |
| 19329083 | Uplink Transmissions with Multiple Beams | MAPA, MICHAEL Y | 2645 | §103 | Final Rejection | 4d overdue | Pending | Sep 15, 2025 |
| 19299957 | PPDU Extension | DOSHI, AKSHAY | 2422 | §102§103 | Non-Final OA | — | Pending | Aug 14, 2025 |
| 19293520 | Priority of Sidelink Reference Signal Transmission | MANOHARAN, MUTHUSWAMY GANAPATHY | 2647 | §103 | Non-Final OA | 1d overdue | Pending | Aug 07, 2025 |
| 19272815 | Determining Motion Vector Difference Symbols Selected for Prediction | NIRJHAR, NASIM NAZRUL | 2896 | §103§112 | Non-Final OA | — | Pending | Jul 17, 2025 |
| 19251894 | Template Matching Prediction with Multiple Template Types | JEAN BAPTISTE, JERRY T | 2482 | §103 | Non-Final OA | — | Pending | Jun 27, 2025 |
| 19249586 | Block Vector Predictor Refinement based on Reference Region Boundary | UHL, LINDSAY JANE KILE | 2482 | §103Other | Non-Final OA | — | Pending | Jun 25, 2025 |
| 19198532 | Reporting of Mobility Parameters | YUEN, KAN | 2464 | §103 | Non-Final OA | — | Pending | May 05, 2025 |
| 19196081 | Prediction of Intra Prediction Mode | VOLENTINE, REBECCA A | 2481 | Other | Non-Final OA | — | Pending | May 01, 2025 |
| 19193688 | Non-Grip Pickleball Paddles | KIM, AHSHIK | 3711 | §102§103Other | Non-Final OA | — | Pending | Apr 29, 2025 |
| 19181834 | NETWORK SLICE MANAGEMENT | LOUIS-FILS, NICOLE M | 2641 | §103 | Final Rejection | — | Pending | Apr 17, 2025 |
| 19089392 | User Plane Congestion Notification Control | DONABED, NINOS | 2444 | §102§103 | Non-Final OA | — | Pending | Mar 25, 2025 |
| 19050602 | Handling Out of Date Delay Reports | RIVAS, RAUL | 2471 | §103 | Final Rejection | 30d overdue | Pending | Feb 11, 2025 |
| 19049469 | Pickleball Racquet with Customizable Butt Cap | KENNEDY, JOSHUA T | 3784 | §102§103 | Non-Final OA | — | Pending | Feb 10, 2025 |
| 19045789 | Load Prediction in Radio Access Network | IBRAHIM, MOHAMED | 2444 | §103 | Non-Final OA | — | Pending | Feb 05, 2025 |
| 19044138 | Multiple-Input Multiple-Output Capability Information for Power Savings | CASCA, FRED A | — | Other | Non-Final OA | — | Pending | Feb 03, 2025 |
| 19033818 | Image Packing for 3D Mesh Displacements | GARCIA, PAULO ANDRES | 2669 | §102§103 | Non-Final OA | — | Pending | Jan 22, 2025 |
| 19012159 | Template Matching Prediction with Block Vector Difference Refinement | BRUMFIELD, SHANIKA M | 2487 | §102§103 | Final Rejection | 46d overdue | Pending | Jan 07, 2025 |
| 19004984 | Quality of Experience Based Handover | MAPA, MICHAEL Y | 2645 | §103 | Non-Final OA | — | Pending | Dec 30, 2024 |
| 19002160 | Classifying Samples for Multi-Model Reference Filtering | BECK, LERON | 2487 | §103 | Final Rejection | 2d overdue | Pending | Dec 26, 2024 |
| 19001171 | Channel State Information Report | AHMED, ABDULLAHI | — | §103 | Non-Final OA | — | Pending | Dec 24, 2024 |
| 18999631 | Expiry of Time Alignment Timer in Primary Timing Advance Group | COSME, NATASHA W | 2465 | §102§103 | Non-Final OA | — | Pending | Dec 23, 2024 |
| 18988341 | Slice Security | SHAHEED, KHALID W | 2643 | §102 | Non-Final OA | — | Pending | Dec 19, 2024 |
| 18982269 | Alignment of Discontinuous Reception for Sidelink Communication | GUADALUPE CRUZ, AIXA AMYR | 2466 | §102§103Other | Non-Final OA | — | Pending | Dec 16, 2024 |
| 18982256 | Multi-Cell Downlink Control Information | BLANTON, JOHN D | 2466 | §102§103Other | Non-Final OA | — | Pending | Dec 16, 2024 |
| 18960406 | TIMING ADVANCE INDICATION FOR TRANSPORT BLOCK TRANSMISSION | LIN, KENNY S | 2416 | Other | Non-Final OA | — | Pending | Nov 26, 2024 |
| 18953651 | Network Energy Saving for Multiple Cells | NGO, RICKY QUOC | 2464 | §102§103 | Non-Final OA | — | Pending | Nov 20, 2024 |
| 18948962 | Two-Step Random Access Procedure | YOUNG, STEVE R | 2477 | DP | Non-Final OA | — | Pending | Nov 15, 2024 |
| 18943166 | Hybrid Automatic Repeat Request Feedback Postponement | BHATTACHARYA, SAM | 2646 | DP | Non-Final OA | — | Pending | Nov 11, 2024 |
| 18939981 | BANDWIDTH PART SWITCHING IN A WIRELESS DEVICE | WONG, XAVIER S | 2415 | §102Other | Non-Final OA | — | Pending | Nov 07, 2024 |
| 18937832 | Resource Configuration for Wireless Device Integrated Access and Backhaul Node | HOLLAND, JENEE LAUREN | 2469 | §103Other | Non-Final OA | — | Pending | Nov 05, 2024 |
| 18930702 | Power Allocation for Sidelink Carrier Aggregation | LATORRE, IVAN O | 2409 | §103 | Non-Final OA | — | Pending | Oct 29, 2024 |
| 18930785 | Ranging Service | CAMPERO MIRAMONTE, MARIO RICARDO | 2649 | §102§103 | Non-Final OA | — | Pending | Oct 29, 2024 |
| 18930685 | Quality-of-Experience Report of Measurement | HAJ SAID, FADI | 2444 | §102§103 | Final Rejection | 15d overdue | Pending | Oct 29, 2024 |
| 18925824 | Deterministic Networks | VU, QUOC THAI NGOC | 2642 | §102§103 | Non-Final OA | — | Pending | Oct 24, 2024 |
| 18925688 | Timing Advance Command for Multiple Timing Advances | KAO, JUTAI | 2473 | §103 | Non-Final OA | 49d overdue | Pending | Oct 24, 2024 |
| 18919654 | Transmitting Multiplexed Uplink Control Information | COBY, FRANTZ | 2459 | §102§103Other | Non-Final OA | — | Pending | Oct 18, 2024 |
| 18906895 | Uplink Control Channel Repetitions in Non-terrestrial Networks | NGUYEN, CHUONG M | 2411 | §103 | Final Rejection | 51d overdue | Pending | Oct 04, 2024 |
| 18901282 | Power Headroom Report in Multiple Data Scheduling | LEE, JOHN J | 2649 | §102DP | Non-Final OA | — | Pending | Sep 30, 2024 |
| 18896355 | Sidelink Multi-Antenna Transmission and Reception | GUADALUPE CRUZ, AIXA AMYR | 2466 | DP | Non-Final OA | — | Pending | Sep 25, 2024 |
| 18893193 | FEEDBACK INFORMATION PROVISION BASED ON MULTIPLIED NUMBER OF TIME DOMAIN RESOURCE ALLOCATIONS | PHAN, MAN U | 2477 | §103 | Non-Final OA | — | Pending | Sep 23, 2024 |
| 18890845 | RECEIVING DOWNLINK CONTROL INFORMATION FOR SUPPORTING MULTIPLE SERVICES | ABELSON, RONALD B | 2476 | §102§103Other | Non-Final OA | — | Pending | Sep 20, 2024 |
| 18825065 | Transmissions with Multiple Configured Grants | JANGBAHADUR, LAKERAM | 2469 | §102§103 | Non-Final OA | — | Pending | Sep 05, 2024 |
| 18819463 | Monitoring Occasion Determination in Control Channel Repetition | HAQUE, ABUSAYEED M | 2466 | §103Other | Non-Final OA | — | Pending | Aug 29, 2024 |
| 18817479 | Transmission Power for Uplink Shared Channel Transmissions | MOORE JR, MICHAEL J | 2467 | Other | Non-Final OA | — | Pending | Aug 28, 2024 |
| 18814637 | Switching Between Two-Step and Four-Step Random Access Procedures | TAYLOR, NATHAN SCOTT | 2643 | DP | Non-Final OA | — | Pending | Aug 26, 2024 |
| 18811202 | Timing Advance Procedures with Multiple Transmission Reception Points | HUQ, OBAIDUL | 2473 | §103 | Non-Final OA | — | Pending | Aug 21, 2024 |
| 18809658 | Multiple Physical Downlink Shared Channel Control Information | HAQUE, ABUSAYEED M | 2466 | DP | Non-Final OA | — | Pending | Aug 20, 2024 |
| 18808966 | Triggering for Transmission of Unused Configured Grant Indication | ZHU, BO HUI ALVIN | 2465 | §103 | Non-Final OA | — | Pending | Aug 19, 2024 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialOfinno LLC has 101 pending office actions as of October 2026, spread across 49 art units and 90 examiners.
Michael Y Mapa has the most, with 4 of Ofinno LLC's pending office actions.
Mostly Networking & Security (USPTO Tech Center 2400), based on where its pending office actions are examined.