Listed by the USPTO as DONABED, NINOS
Tech Center 2800 • Art Units: 2144 2444 2468 2841
This examiner grants 75% of resolved cases
DONABED, NINOS is assigned to tech center 2800 and art unit 2144. The record contains 674 resolved cases, a 75.2% allowance rate, and a median of 1166 days to allowance. The 64.5% interview lift is the dominant tactical signal in the profile, indicating that interviews warrant serious consideration when shaping prosecution strategy.
The leading companies are Samsung Electronics Co., Ltd., Cisco Technology Inc., and Capital One Services LLC. The leading firms are SUGHRUE MION, PLLC, BakerHostetler, and BANNER & WITCOFF, LTD. Counsel can use the profile to prioritize interview preparation while preserving precise written responses and claim amendments for the substantive record.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18969435 | Li-Fi-Based Location Authentication | Final Rejection | Capital One Services, LLC |
| 18728340 | METHOD BY WHICH RECEPTION DEVICE PERFORMS END-TO-END TRAINING IN WIRELESS COMMUNICATION SYSTEM, RECEPTION DEVICE, PROCESSING DEVICE, STORAGE MEDIUM, METHOD BY WHICH TRANSMISSION DEVICE PERFORMS END-TO-END TRAINING, AND TRANSMISSION DEVICE | Final Rejection | LG ELECTRONICS INC. |
| 19272511 | MULTI-OS-BASED ELECTRONIC APPARATUS AND METHOD FOR CONTROLLING SAME | Non-Final OA | SAMSUNG ELECTRONICS CO., LTD. |
| 18962310 | ELECTRONIC DEVICE AND METHOD FOR UPGRADING VIRTUALIZED NETWORK FUNCTION IN NETWORK FUNCTION VIRTUALIZATION ENVIRONMENT | Final Rejection | Samsung Electronics Co., Ltd. |
| 19047860 | COMMUNICATION METHOD, RELATED APPARATUS, AND COMPUTER-READABLE STORAGE MEDIUM | Final Rejection | HUAWEI TECHNOLOGIES CO., LTD. |
| 18982430 | Edge Node Deployment Method Based on Cloud Computing Technology and Cloud Management Platform | Final Rejection | Huawei Cloud Computing Technologies Co., Ltd. |
| 18916532 | ACCESS POINT IDENTIFIER ASSIGNMENT IN COORDINATED COMMUNICATION SCHEMES | Non-Final OA | QUALCOMM Incorporated |
| 18846473 | NETWORK NODE AND COMMUNICATION METHOD | Final Rejection | NTT DOCOMO, INC. |
| 18728655 | METHOD AND APPARATUS FOR SPLITTING DOWNLINK DATA IN A DUAL/MULTI CONNECTIVITY SYSTEM | Final Rejection | NOKIA SOLUTIONS AND NETWORKS OY |
| 18932412 | Sustainability-Aware Collaboration Session Routing | Final Rejection | Cisco Technology, Inc. |
| 18621019 | GENERATING TIMESTAMPED EVENTS BASED ON CONFIGURATION INFORMATION OBTAINED BY A REMOTE CAPTURE AGENT FROM A CONFIGURATION SERVER | Non-Final OA | Cisco Technology, Inc. |
| 18540591 | Systems and Methods for NextG Edge Computing Network Segment Management | Final Rejection | Veea Inc. |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy75.2% of resolved applications examined by Ninos Donabed were allowed (674 resolved cases), compared with 60.2% across Art Unit 2144 over the last five years.
This examiner's interview lift is +64.5 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Ninos Donabed took 1,166 days on average from filing to allowance.
Ninos Donabed examines applications in Art Unit 2144 in Tech Center 2800 (Semiconductors, Circuits & Optics).