Technology areas: Semiconductors, Circuits & Optics • Medical Devices & Mechanical Engineering
2 pending office actions • 2 art units • 2 examiners • 0 of 2 (0%) have an AI response strategy ready • 1 patents granted in the last 365 days
Safegrid OY currently has 2 pending office actions in the Medical Devices & Mechanical Engineering technology area. The prosecution is evenly split across 2 distinct art units and distinct examiners, showing no concentration of workload. HOLLY, LEE A is the busiest examiner, though they are responsible for only 1 pending action.
With 2 distinct examiners and distinct art units for the pending matters, the company faces a fragmented prosecution landscape. Each pending matter requires a unique approach tailored to different examiners and technical units, as there is no overlap in the current data for these matters. This structure suggests that Safegrid OY is exploring diverse mechanical applications that do not fall under a single specialized examination group.
Practitioners should treat each of the pending actions as an independent track, as the examiners and art units are entirely separate. The lack of overlap means that success in one action may not directly influence the other. Strategic planning should account for the specific technical standards of both art units to ensure a high probability of allowance across the entire portfolio.
Based on the USPTO statutory response window for each pending office action. 2 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §103 only | 1 (50%) |
| Multi-statute (no §101) | 1 (50%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| HOLLY, LEE A | 1 | 75.0% | +5.9% |
| KARAVIAS, DENISE R | 1 | 63.2% | +30.5% |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18960084 | APPARATUS AND TOOL FOR A MEASUREMENT COIL | HOLLY, LEE A | 34d |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 17795705 | SYSTEM AND METHOD FOR MANAGEMENT OF ELECTRIC GRID | KARAVIAS, DENISE R | 32d overdue |
| Art Unit | Apps |
|---|---|
| 3726 | 1 |
| 2857 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 18960084 | APPARATUS AND TOOL FOR A MEASUREMENT COIL | HOLLY, LEE A | 3726 | §102§103§112Other | Non-Final OA | 34d | Pending | Nov 26, 2024 |
| 17795705 | SYSTEM AND METHOD FOR MANAGEMENT OF ELECTRIC GRID | KARAVIAS, DENISE R | 2857 | §103 | Final Rejection | 32d overdue | Pending | Jul 27, 2022 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial