2 pending office actions • 0 art units • 2 examiners • 0 of 2 (0%) have an AI response strategy ready
Shanghai Zhenhua Heavy Industries Co. Ltd. has 2 pending office actions currently in prosecution. These matters are split between 2 distinct examiners, ensuring that each case is handled by a different individual. The data reports 0 distinct art units associated with these filings, which reflects a specific administrative categorization for the pending matters.
SOTO, HENRIX is the busiest examiner, with 1 busiest examiner pending office action. This 1 action is 1 of the 2 pending office actions for the company. With 2 distinct examiners involved, the company is engaging with multiple points of contact at the patent office despite the small number of active cases.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §112 only | 1 (50%) |
| Multi-statute (no §101) | 1 (50%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| SOTO, HENRIX | 1 | 71.2% | +31.3% |
| WAGGONER, TIMOTHY R | 1 | 71.6% | +7.7% |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18867933 | BRIDGE CRANE CONSTRUCTION PLATFORM | SOTO, HENRIX | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18867933 | BRIDGE CRANE CONSTRUCTION PLATFORM | SOTO, HENRIX | — |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 18867933 | BRIDGE CRANE CONSTRUCTION PLATFORM | SOTO, HENRIX | — | §102§103 | Non-Final OA | — | Pending | Nov 21, 2024 |
| 18721202 | CONTROL SYSTEM AND METHOD FOR GUIDING CLASSIFIED STORAGE AND FEEDING/DISCHARGING TAKEOUT AND PLACEMENT OF LOCK PINS | WAGGONER, TIMOTHY R | — | §112 | Non-Final OA | — | Pending | Jun 18, 2024 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial