Technology areas: Transportation, E-Commerce & Mechanical Systems • Medical Devices & Mechanical Engineering
6 pending office actions • 4 art units • 6 examiners • 0 of 6 (0%) have an AI response strategy ready • 34 patents granted in the last 365 days
SUZUKI MOTOR Corporation has 9 pending office actions in Transportation, E-Commerce & Mechanical Systems. Each action is assigned to a distinct examiner, while the matters span 6 distinct art units. The profile therefore shows complete examiner dispersion with repeated placement in some transportation-related units.
MOUBRY, JAMES G is the busiest examiner, with 1 pending matter. No examiner concentration is identified. Counsel should manage the matters individually and use the repeated art-unit assignments to coordinate recurring mechanical or transportation claim issues where the underlying technologies are related.
Based on the USPTO statutory response window for each pending office action. 3 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 3 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 + other | 1 (17%) |
| §103 only | 2 (33%) |
| §102 only | 1 (17%) |
| Multi-statute (no §101) | 2 (33%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| MOUBRY, JAMES G | 1 | 79.5% | +13.0% |
| LAM, ALEX W | 1 | 91.7% | +2.1% |
| LATHERS, KEVIN ANTHONY | 1 | 80.3% | +15.8% |
| DANIELS, JASON S | 1 | 85.8% | +15.0% |
| LIETHEN, KURT PHILIP | 1 | 79.7% | +9.3% |
| LEE, MICHAEL S | 1 | 63.1% | +20.9% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18735008 | SUPPORT STRUCTURE FOR TURN SIGNAL LAMP | DANIELS, JASON S | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 3 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19024997 | INSTALLATION STRUCTURE FOR RESERVOIR TANK | LATHERS, KEVIN ANTHONY | 7d |
| 19365907 | ENGINE COVER | MOUBRY, JAMES G | — |
| 19202790 | POWER SUPPLY SYSTEM | LAM, ALEX W | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 4 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19024997 | INSTALLATION STRUCTURE FOR RESERVOIR TANK | LATHERS, KEVIN ANTHONY | 7d |
| 18365827 | FIXING STRUCTURE | LEE, MICHAEL S | 42d |
| 19365907 | ENGINE COVER | MOUBRY, JAMES G | — |
| 18735008 | SUPPORT STRUCTURE FOR TURN SIGNAL LAMP | DANIELS, JASON S | — |
| Art Unit | Apps |
|---|---|
| 3747 | 3 |
| 2842 | 1 |
| 3612 | 1 |
| 3677 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19365907 | ENGINE COVER | MOUBRY, JAMES G | 3747 | §101§102 | Non-Final OA | — | Pending | Oct 22, 2025 |
| 19202790 | POWER SUPPLY SYSTEM | LAM, ALEX W | 2842 | §102§112 | Final Rejection | — | Pending | May 08, 2025 |
| 19024997 | INSTALLATION STRUCTURE FOR RESERVOIR TANK | LATHERS, KEVIN ANTHONY | 3747 | §102§103 | Final Rejection | 7d | Pending | Jan 16, 2025 |
| 18735008 | SUPPORT STRUCTURE FOR TURN SIGNAL LAMP | DANIELS, JASON S | 3612 | §102 | Non-Final OA | — | Pending | Jun 05, 2024 |
| 18416385 | VEHICLE CONTROL SYSTEM | LIETHEN, KURT PHILIP | 3747 | §103 | Final Rejection | 22d | Pending | Jan 18, 2024 |
| 18365827 | FIXING STRUCTURE | LEE, MICHAEL S | 3677 | §103 | Non-Final OA | 42d | Pending | Aug 04, 2023 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialSUZUKI MOTOR Corporation has 6 pending office actions as of October 2026, spread across 4 art units and 6 examiners.
James G Moubry has the most, with 1 of SUZUKI MOTOR Corporation's pending office actions.
Mostly Medical Devices & Mechanical Engineering (USPTO Tech Center 3700), based on where its pending office actions are examined.