Technology areas: Semiconductors, Circuits & Optics • Medical Devices & Mechanical Engineering
24 pending office actions • 20 art units • 24 examiners • 0 of 24 (0%) have an AI response strategy ready • 18 patents granted in the last 365 days
Vertiv Group Corp. has 25 pending office actions in Semiconductors, Circuits & Optics. The matters are assigned to 25 distinct examiners across 20 distinct art units, showing broad examiner dispersion with some art-unit overlap.
LY, XUAN is the busiest examiner, with 1 pending matter. No single examiner carries a larger share of the listed workload, so the profile does not point to a dominant examiner relationship for portfolio-wide planning.
The distribution favors a coordinated but individualized prosecution approach. Counsel can use art-unit groupings to identify related technical issues, while maintaining separate examiner assessments for claim construction, prior-art treatment, and interview timing. The data supports oversight across several semiconductor and optics examination contexts.
Based on the USPTO statutory response window for each pending office action. 5 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 5 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 + other | 2 (8%) |
| §103 only | 9 (38%) |
| Multi-statute (no §101) | 13 (54%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| LY, XUAN | 1 | 85.5% | +6.5% |
| BOBISH, CHRISTOPHER S | 1 | 62.6% | +29.0% |
| INGE, JOSEPH N | 1 | 75.6% | +23.8% |
| HANSEN, JAMES ORVILLE | 1 | 70.5% | +21.8% |
| TAN, RICHARD | 1 | 79.6% | +23.0% |
| PATEL, DHARTI HARIDAS | 1 | 87.3% | +7.7% |
| HAWKINS, DOMINIC E | 1 | 87.0% | +12.1% |
| SMITH, COURTNEY L | 1 | 85.5% | +11.9% |
| TRAN, TRAVIS VIET | 1 | 91.7% | +33.3% |
| MILLNER, MONICA E | 1 | 77.4% | +21.8% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 3 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19348475 | DEVICE, METHOD, APPARATUS AND MEDIUN FOR SHORT-CIRCUIT DETECTION OF A SWITCHING DEVICE AND AN UNINTERRUPTIBLE POWER SUPPLY | LY, XUAN | — |
| 19003334 | CURRENT SENSOR ASSEMBLY | HAWKINS, DOMINIC E | — |
| 18942154 | POWER CONVERTER WITH INTEGRATED HEAT PIPE | SMITH, COURTNEY L | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19079693 | UNIVERSAL BIDIRECTIONAL POWER CONVERTER WITH AGNOSTIC DIRECT CURRENT ENERGY STORAGE OR ENERGY SOURCE | TAN, RICHARD | 14d |
| 18655998 | SYSTEMS AND METHODS FOR MONITORING AND CONTROLLING DATA CENTER EQUIPMENT | PATEL, KAMINI B | 22d |
| 18409754 | SYSTEMS AND METHODS FOR TWO-PHASE COLD PLATE COOLING | TAVAKOLDAVANI, KAMRAN | 55d |
| 19332217 | COOLANT DISTRIBUTION UNIT SOFT START PUMP CONTROLS | BOBISH, CHRISTOPHER S | — |
| 19082947 | SECURITY GRILL PANEL FOR A CABINET AND A METHOD OF INSTALLING | HANSEN, JAMES ORVILLE | — |
| 19075387 | EMBEDDED IN-CORD ACTIVE INRUSH CURRENT LIMITER DEVICE FOR POWER SUPPLY UNIT | PATEL, DHARTI HARIDAS | — |
| 18931996 | SYSTEM AND METHOD TO BUILD AN IMAGE USING SCRIPTS AND OPENBMC FOR MULTIPLE HARDWARE PLATFORMS | TRAN, TRAVIS VIET | — |
| 18906596 | SYSTEMS AND METHODS FOR COOLING FAN CONTROL | SHECHTMAN, SEAN P | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18917243 | CABLE CARRIER FOR A POWER SYSTEM | MILLNER, MONICA E | 45d overdue |
| 19079693 | UNIVERSAL BIDIRECTIONAL POWER CONVERTER WITH AGNOSTIC DIRECT CURRENT ENERGY STORAGE OR ENERGY SOURCE | TAN, RICHARD | 14d |
| 19095367 | MEDIUM AND LOW VOLTAGE POWER CENTER | INGE, JOSEPH N | 55d |
| 19332217 | COOLANT DISTRIBUTION UNIT SOFT START PUMP CONTROLS | BOBISH, CHRISTOPHER S | — |
| 19082947 | SECURITY GRILL PANEL FOR A CABINET AND A METHOD OF INSTALLING | HANSEN, JAMES ORVILLE | — |
| 19003334 | CURRENT SENSOR ASSEMBLY | HAWKINS, DOMINIC E | — |
| 18942154 | POWER CONVERTER WITH INTEGRATED HEAT PIPE | SMITH, COURTNEY L | — |
| 18931996 | SYSTEM AND METHOD TO BUILD AN IMAGE USING SCRIPTS AND OPENBMC FOR MULTIPLE HARDWARE PLATFORMS | TRAN, TRAVIS VIET | — |
| Art Unit | Apps |
|---|---|
| 2836 | 2 |
| 2896 | 2 |
| 3763 | 2 |
| 3746 | 1 |
| 3637 | 1 |
| 2849 | 1 |
| 2838 | 1 |
| 2858 | 1 |
| 2841 | 1 |
| 2191 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19348475 | DEVICE, METHOD, APPARATUS AND MEDIUN FOR SHORT-CIRCUIT DETECTION OF A SWITCHING DEVICE AND AN UNINTERRUPTIBLE POWER SUPPLY | LY, XUAN | 2836 | §103 | Non-Final OA | — | Pending | Oct 02, 2025 |
| 19332217 | COOLANT DISTRIBUTION UNIT SOFT START PUMP CONTROLS | BOBISH, CHRISTOPHER S | 3746 | §102§103 | Non-Final OA | — | Pending | Sep 18, 2025 |
| 19095367 | MEDIUM AND LOW VOLTAGE POWER CENTER | INGE, JOSEPH N | 2836 | §103 | Final Rejection | 55d | Pending | Mar 31, 2025 |
| 19082947 | SECURITY GRILL PANEL FOR A CABINET AND A METHOD OF INSTALLING | HANSEN, JAMES ORVILLE | 3637 | §102§103§112 | Non-Final OA | — | Pending | Mar 18, 2025 |
| 19079693 | UNIVERSAL BIDIRECTIONAL POWER CONVERTER WITH AGNOSTIC DIRECT CURRENT ENERGY STORAGE OR ENERGY SOURCE | TAN, RICHARD | 2849 | §102§103§112 | Final Rejection | 14d | Pending | Mar 14, 2025 |
| 19075387 | EMBEDDED IN-CORD ACTIVE INRUSH CURRENT LIMITER DEVICE FOR POWER SUPPLY UNIT | PATEL, DHARTI HARIDAS | 2838 | §102§103 | Non-Final OA | — | Pending | Mar 10, 2025 |
| 19003334 | CURRENT SENSOR ASSEMBLY | HAWKINS, DOMINIC E | 2858 | §103 | Non-Final OA | — | Pending | Dec 27, 2024 |
| 18942154 | POWER CONVERTER WITH INTEGRATED HEAT PIPE | SMITH, COURTNEY L | 2841 | §103 | Non-Final OA | — | Pending | Nov 08, 2024 |
| 18931996 | SYSTEM AND METHOD TO BUILD AN IMAGE USING SCRIPTS AND OPENBMC FOR MULTIPLE HARDWARE PLATFORMS | TRAN, TRAVIS VIET | 2191 | §101§103§112 | Non-Final OA | — | Pending | Oct 30, 2024 |
| 18917243 | CABLE CARRIER FOR A POWER SYSTEM | MILLNER, MONICA E | 3632 | §103 | Non-Final OA | 45d overdue | Pending | Oct 16, 2024 |
| 18906596 | SYSTEMS AND METHODS FOR COOLING FAN CONTROL | SHECHTMAN, SEAN P | 2896 | §102§103§112 | Non-Final OA | — | Pending | Oct 04, 2024 |
| 18884610 | HIGH DENSITY POWER DISTRIBUTION SYSTEM WITH INTEGRATED BUSWAY, SMART TAP-OFF BOX AND COMPACT RACK POWER DISTRIBUTION UNITS | FIN, MICHAEL RUTLAND | — | §102§103 | Non-Final OA | — | Pending | Sep 13, 2024 |
| 18823680 | CABINET WITH FIRE EXTINGUISHER | CERNOCH, STEVEN MICHAEL | 3752 | §102§103 | Final Rejection | — | Pending | Sep 04, 2024 |
| 18750596 | DISPLAY MOUNT | PHAN, RAYMOND NGAN | 2175 | §103 | Non-Final OA | — | Pending | Jun 21, 2024 |
| 18679172 | AIR FILTER REMAINING LIFE PREDICTION | SLAUGOVSKY, RACHEL MARIE | 1776 | §101§102§103 | Non-Final OA | — | Pending | May 30, 2024 |
| 18672386 | BATTERY CABINET WITH INSULATING TERMINAL PLATE | NUNEZ, BRIANNE SARAH | 1745 | §102§103 | Non-Final OA | — | Pending | May 23, 2024 |
| 18670716 | SYSTEMS AND METHODS FOR CONTROLLING PUMPED TWO-PHASE REFRIGERANT TEMPERATURE | BABAA, NAEL N | 3763 | §102§103 | Non-Final OA | — | Pending | May 21, 2024 |
| 18665435 | PRINTED CIRCUIT BOARD FOR PLUG-IN TYPE BREAKERS | VARGHESE, ROSHN K | 2896 | §103 | Non-Final OA | — | Pending | May 15, 2024 |
| 18665542 | SYSTEMS AND METHODS FOR COMPUTER CABINET COOLING | FAULKNER, RYAN L | 3762 | §102§103§112 | Non-Final OA | — | Pending | May 15, 2024 |
| 18655998 | SYSTEMS AND METHODS FOR MONITORING AND CONTROLLING DATA CENTER EQUIPMENT | PATEL, KAMINI B | 2114 | §103§112 | Final Rejection | 22d | Pending | May 06, 2024 |
| 18593269 | MODULAR FLOOR STAND SYSTEM | WUJCIAK, ALFRED J | 3636 | §103 | Non-Final OA | — | Pending | Mar 01, 2024 |
| 18414639 | MODULAR DATA CENTER SYSTEM | AGUDELO, PAOLA | 3633 | §103§112 | Final Rejection | — | Pending | Jan 17, 2024 |
| 18409754 | SYSTEMS AND METHODS FOR TWO-PHASE COLD PLATE COOLING | TAVAKOLDAVANI, KAMRAN | 3763 | §102§103 | Non-Final OA | 55d | Pending | Jan 10, 2024 |
| 18351341 | TWO-PHASE IMMERSION COOLING SYSTEM | OXENKNECHT, KYLE | 2835 | §103 | Non-Final OA | — | Pending | Jul 12, 2023 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialVertiv Group Corp. has 24 pending office actions as of October 2026, spread across 20 art units and 24 examiners.
Xuan Ly has the most, with 1 of Vertiv Group Corp.'s pending office actions.
Mostly Semiconductors, Circuits & Optics (USPTO Tech Center 2800), based on where its pending office actions are examined.