Technology areas: Chemistry & Materials • Computing & Software • Semiconductors, Circuits & Optics • Medical Devices & Mechanical Engineering
5 pending office actions • 5 art units • 5 examiners • 0 of 5 (0%) have an AI response strategy ready • 9 patents granted in the last 365 days
VIESSMANN CLIMATE SOLUTIONS SE has 5 pending office actions in Medical Devices & Mechanical Engineering. The matters are distributed among 5 distinct examiners and 5 distinct art units, indicating that each active action sits in a separate examination assignment.
LIN, KO-WEI is the busiest examiner, with 1 pending matter. No examiner carries more than that recorded workload, so prosecution management should emphasize application-level tracking and consistent treatment of related mechanical or device claim issues.
Based on the USPTO statutory response window for each pending office action. 3 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 3 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §103 only | 3 (60%) |
| Multi-statute (no §101) | 2 (40%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| LIN, KO-WEI | 1 | 76.1% | +20.1% |
| DUKE, EMMANUEL E | 1 | 68.9% | +27.4% |
| RIVERA-PEREZ, CARLOS O | 1 | 72.2% | +18.8% |
| AHMED, ISTIAQUE | 1 | 69.5% | +20.5% |
| NEWELL, ANNA GOULD | 1 | 50.0% | +37.5% |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 2 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18709106 | BUILDING SERVICES SYSTEM | DUKE, EMMANUEL E | 147d overdue |
| 18768366 | DEVICE FOR ADJUSTING AN AIR VOLUME FLOW | LIN, KO-WEI | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 5 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18709106 | BUILDING SERVICES SYSTEM | DUKE, EMMANUEL E | 147d overdue |
| 17779154 | BATTERY PACK WITH REINFORCING ELEMENTS | NEWELL, ANNA GOULD | 42d overdue |
| 18547056 | Method and System for Commissioning an HVAC System | AHMED, ISTIAQUE | 7d |
| 18768366 | DEVICE FOR ADJUSTING AN AIR VOLUME FLOW | LIN, KO-WEI | — |
| 18701224 | Power Conversion Apparatus and Method for Connecting Power Conversion Apparatus to AC Power Supply | RIVERA-PEREZ, CARLOS O | — |
| Art Unit | Apps |
|---|---|
| 3762 | 1 |
| 3763 | 1 |
| 2838 | 1 |
| 2116 | 1 |
| 1726 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 18768366 | DEVICE FOR ADJUSTING AN AIR VOLUME FLOW | LIN, KO-WEI | 3762 | §102§112 | Non-Final OA | — | Pending | Jul 10, 2024 |
| 18709106 | BUILDING SERVICES SYSTEM | DUKE, EMMANUEL E | 3763 | §102§103 | Non-Final OA | 147d overdue | Pending | May 10, 2024 |
| 18701224 | Power Conversion Apparatus and Method for Connecting Power Conversion Apparatus to AC Power Supply | RIVERA-PEREZ, CARLOS O | 2838 | §103 | Non-Final OA | — | Pending | Apr 13, 2024 |
| 18547056 | Method and System for Commissioning an HVAC System | AHMED, ISTIAQUE | 2116 | §103 | Non-Final OA | 7d | Pending | Aug 18, 2023 |
| 17779154 | BATTERY PACK WITH REINFORCING ELEMENTS | NEWELL, ANNA GOULD | 1726 | §103 | Non-Final OA | 42d overdue | Pending | May 24, 2022 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialVIESSMANN CLIMATE SOLUTIONS SE has 5 pending office actions as of October 2026, spread across 5 art units and 5 examiners.
Ko-Wei Lin has the most, with 1 of VIESSMANN CLIMATE SOLUTIONS SE's pending office actions.
Mostly Medical Devices & Mechanical Engineering (USPTO Tech Center 3700), based on where its pending office actions are examined.