Technology area: Transportation, E-Commerce & Mechanical Systems
13 pending office actions • 9 art units • 12 examiners • 0 of 13 (0%) have an AI response strategy ready • 32 patents granted in the last 365 days
Weatherford Technology Holdings LLC has 12 pending office actions in Transportation, E-Commerce & Mechanical Systems. These matters are distributed among 11 distinct examiners and 8 distinct art units. The examiner distribution is broad, while the art-unit distribution indicates that some technical groupings contain more than one pending matter.
LAMBE, PATRICK F is the busiest examiner, with 2 pending actions. Counsel can use examiner-specific preparation for that assignment while maintaining art-unit tracking across the rest of the portfolio.
Based on the USPTO statutory response window for each pending office action. 5 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 5 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 1 (8%) |
| §101 + other | 2 (15%) |
| §103 only | 5 (38%) |
| §112 only | 1 (8%) |
| Multi-statute (no §101) | 4 (31%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| LAMBE, PATRICK F | 2 | 62.5% | +29.0% |
| WALLACE, KIPP CHARLES | 1 | 78.3% | +25.5% |
| NORRIS, URSULA LEE | 1 | 81.7% | +6.5% |
| GRAY, GEORGE STERLING | 1 | 75.3% | +10.0% |
| ALAM, MIRZA F | 1 | 74.4% | +33.9% |
| LEE, GILBERT Y | 1 | 78.8% | +10.7% |
| GARDNER, NICOLE | 1 | 69.4% | +14.6% |
| QUAIM, LAMIA | 1 | 74.6% | +17.5% |
| TIMILSINA, SHARAD | 1 | 74.4% | +11.1% |
| BAGHDASARYAN, HOVHANNES | 1 | 77.3% | +16.9% |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 7 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18903833 | VALVE ASSEMBLY FOR DOWNHOLE PUMP OF RECIPROCATING PUMP SYSTEM | GARDNER, NICOLE | 73d overdue |
| 18943094 | PUMPING UNIT INSPECTION SENSOR ASSEMBLY, SYSTEM AND METHOD | ALAM, MIRZA F | 22d overdue |
| 19053105 | Synchronized Actuator Having Multiple Motors for Downhole Well Tool | NORRIS, URSULA LEE | 9d overdue |
| 18166470 | Systems and Methods Having An Analytical Tool For Diagnosis Of The Source Of Water Production In An Oil And Gas Well | HALL, KRISTYN A | 84d |
| 18904605 | TUBULAR RUNNING OPERATIONS WITH FREQUENCY SPECTRUM ANALYSIS | LAMBE, PATRICK F | — |
| 18736072 | DETERMINING A DRILLING PATH IN A SUBTERRANEAN FORMATION | QUAIM, LAMIA | — |
| 18647218 | MONITORING DOWNHOLE COMPONENTS OF COMPLETION ASSEMBLY USING DISTRIBUTED ACOUSTIC SENSING | TIMILSINA, SHARAD | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18903833 | VALVE ASSEMBLY FOR DOWNHOLE PUMP OF RECIPROCATING PUMP SYSTEM | GARDNER, NICOLE | 73d overdue |
| 18943094 | PUMPING UNIT INSPECTION SENSOR ASSEMBLY, SYSTEM AND METHOD | ALAM, MIRZA F | 22d overdue |
| 18662614 | ELEVATOR FOR TUBULAR HANDLING | LAMBE, PATRICK F | 36d |
| 19335677 | LIMITLESS INJECTION SHOE | WALLACE, KIPP CHARLES | — |
| 19024171 | FLOW DIVERSION IN MANAGED PRESSURE DRILLING OPERATIONS | GRAY, GEORGE STERLING | — |
| 18932224 | V-PACKING UTILIZING POLYARYLETHER KETONE SEAL ELEMENTS | LEE, GILBERT Y | — |
| 18904605 | TUBULAR RUNNING OPERATIONS WITH FREQUENCY SPECTRUM ANALYSIS | LAMBE, PATRICK F | — |
| 18736072 | DETERMINING A DRILLING PATH IN A SUBTERRANEAN FORMATION | QUAIM, LAMIA | — |
| Art Unit | Apps |
|---|---|
| 3676 | 5 |
| 3674 | 1 |
| 2688 | 1 |
| 3675 | 1 |
| 3753 | 1 |
| 2857 | 1 |
| 3645 | 1 |
| 3679 | 1 |
| 3672 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19335677 | LIMITLESS INJECTION SHOE | WALLACE, KIPP CHARLES | 3674 | §103 | Non-Final OA | — | Pending | Sep 22, 2025 |
| 19053105 | Synchronized Actuator Having Multiple Motors for Downhole Well Tool | NORRIS, URSULA LEE | 3676 | §103§112 | Final Rejection | 9d overdue | Pending | Feb 13, 2025 |
| 19024171 | FLOW DIVERSION IN MANAGED PRESSURE DRILLING OPERATIONS | GRAY, GEORGE STERLING | 3676 | §103 | Non-Final OA | — | Pending | Jan 16, 2025 |
| 18943094 | PUMPING UNIT INSPECTION SENSOR ASSEMBLY, SYSTEM AND METHOD | ALAM, MIRZA F | 2688 | §101§102§103 | Final Rejection | 22d overdue | Pending | Nov 11, 2024 |
| 18932224 | V-PACKING UTILIZING POLYARYLETHER KETONE SEAL ELEMENTS | LEE, GILBERT Y | 3675 | §112 | Final Rejection | — | Pending | Oct 30, 2024 |
| 18904605 | TUBULAR RUNNING OPERATIONS WITH FREQUENCY SPECTRUM ANALYSIS | LAMBE, PATRICK F | 3676 | §101§103 | Non-Final OA | — | Pending | Oct 02, 2024 |
| 18903833 | VALVE ASSEMBLY FOR DOWNHOLE PUMP OF RECIPROCATING PUMP SYSTEM | GARDNER, NICOLE | 3753 | §103§112 | Non-Final OA | 73d overdue | Pending | Oct 01, 2024 |
| 18736072 | DETERMINING A DRILLING PATH IN A SUBTERRANEAN FORMATION | QUAIM, LAMIA | 3676 | §103§112 | Non-Final OA | — | Pending | Jun 06, 2024 |
| 18662614 | ELEVATOR FOR TUBULAR HANDLING | LAMBE, PATRICK F | 3676 | §103 | Final Rejection | 36d | Pending | May 13, 2024 |
| 18647218 | MONITORING DOWNHOLE COMPONENTS OF COMPLETION ASSEMBLY USING DISTRIBUTED ACOUSTIC SENSING | TIMILSINA, SHARAD | 2857 | §102§103 | Non-Final OA | — | Pending | Apr 26, 2024 |
| 18627918 | SYSTEM AND METHOD FOR SENSING ONE OR MORE FLUID FLOW PARAMETERS OF A FLUID WITHIN A PIPE | BAGHDASARYAN, HOVHANNES | 3645 | §103 | Final Rejection | — | Pending | Apr 05, 2024 |
| 18416474 | TUBULAR CONNECTION CONTROL USING DETECTABLE FEATURE | BOCHNA, DAVID | 3679 | §103 | Non-Final OA | — | Pending | Jan 18, 2024 |
| 18166470 | Systems and Methods Having An Analytical Tool For Diagnosis Of The Source Of Water Production In An Oil And Gas Well | HALL, KRISTYN A | 3672 | §101 | Final Rejection | 84d | Pending | Feb 08, 2023 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialWeatherford Technology Holdings LLC has 13 pending office actions as of October 2026, spread across 9 art units and 12 examiners.
Patrick F Lambe has the most, with 2 of Weatherford Technology Holdings LLC's pending office actions.
Mostly Transportation, E-Commerce & Mechanical Systems (USPTO Tech Center 3600), based on where its pending office actions are examined.