Listed by the USPTO as LEE, GILBERT Y
Tech Center 3600 • Art Units: 1742 3673 3674 3675 3676
This examiner grants 79% of resolved cases
LEE, GILBERT Y has 1416 resolved cases and a 78.8% allowance rate. The interview lift is 10.7%, and the median time to allowance is 872 days. The profile covers Tech Center 3600 and Art Unit 1742. The allowance rate indicates a favorable resolved-case pattern across a substantial record. The positive interview lift is measurable but limited, so interviews may best complement detailed written responses. The 872-day median remains important for prosecution scheduling.
The principal companies are Galvgard (U K ) Limited, Cilag GmbH International, and Mahle International GmbH. The leading firms are Sheridan Ross PC, Abel Schillinger, LLP, and ANDRUS INTELLECTUAL PROPERTY LAW, LLP. This applicant and firm mix gives counsel context for the technical matters recurring in the docket.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18541712 | IMMERSIBLE AND CORROSION RESISTANT SHAFT ASSEMBLIES | Non-Final OA | CILAG GMBH INTERNATIONAL |
| 18988853 | PISTON RING WITH TRAPEZOIDAL OPENING | Non-Final OA | MAHLE International GmbH |
| 18206106 | MOUNTING PAD, MOUNTING MECHANISM, AND SUBSTRATE TRANSFER MECHANISM | Non-Final OA | Tokyo Electron Limited |
| 18932224 | V-PACKING UTILIZING POLYARYLETHER KETONE SEAL ELEMENTS | Final Rejection | Weatherford Technology Holdings, LLC. |
| 18138396 | Elastomer Bonded Door For Vacuum Systems | Non-Final OA | Applied Materials, Inc. |
| 18897039 | MULTILAYER GASKET AND METHODS OF FORMING THE SAME | Final Rejection | SAINT-GOBAIN PERFORMANCE PLASTICS CORPORATION |
| 18126086 | SEGMENTED VACUUM GRIPPER SEALING ELEMENT | Final Rejection | Nemo Power Tools Ltd. |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy78.8% of resolved applications examined by Gilbert Y Lee were allowed (1,416 resolved cases), compared with 58.3% across Art Unit 1742 over the last five years.
This examiner's interview lift is +10.7 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Gilbert Y Lee took 872 days on average from filing to allowance.
Gilbert Y Lee examines applications in Art Unit 1742 in Tech Center 3600 (Transportation, E-Commerce & Mechanical Systems).