Listed by the USPTO as ARANT, HARRY E
Tech Center 3700 • Art Units: 3744 3763 3785
This examiner grants 50% of resolved cases
ARANT, HARRY E examines in tech center 3700 and art unit 3744. The profile contains 598 resolved cases, with an allowance rate of 50.0% and a median of 1287 days to allowance. Interview lift is 21.4%, indicating a positive association between interviews and allowance outcomes.
The leading companies are HAMILTON SUNDSTRAND Corporation, Hanon Systems, and Airbus Operations GmbH. The leading firms are CKC & Partners Co., LLC, Norton Rose Fulbright US LLP, and TRASKBRITT, P.C. The 50.0% allowance rate provides a balanced historical outcome reference rather than a strong directional signal. The positive interview lift supports focused examiner engagement, while the 1287-day median favors early development of claim amendments and technical distinctions.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 19062837 | FIBER MEMBER AND HEAT EXCHANGER INCLUDING FIBER MEMBER | Non-Final OA | CANON KABUSHIKI KAISHA |
| 18976763 | AIR CONDITIONING CONTROL APPARATUS FOR VEHICLE | Non-Final OA | SUBARU CORPORATION |
| 18838266 | HEAT EXCHANGER, AND METHOD FOR MANUFACTURING HEAT EXCHANGER | Final Rejection | Mitsubishi Electric Corporation |
| 18838835 | HEAT EXCHANGE DEVICE AND METHOD FOR CONNECTING THE DEVICE | Non-Final OA | A. Raymond et Cie |
| 19036649 | HEAT SINK | Non-Final OA | FURUKAWA ELECTRIC CO., LTD. |
| 18695460 | VAPOR CHAMBER, ELECTRONIC APPARATUS, AND METHOD FOR MANUFACTURING VAPOR CHAMBER | Final Rejection | DAI NIPPON PRINTING CO., LTD. |
| 18857941 | USE OF PHASE CHANGE MATERIALS TO STORE ENERGY FOR REFRIGERATION IN CHEMICAL PRODUCTION PROCESSES | Final Rejection | SABIC Global Technologies B.V. |
| 19099749 | HEAT EXCHANGER | Non-Final OA | Hanon Systems |
| 18994832 | MANIFOLD FLUID MODULE | Non-Final OA | Hanon Systems |
| 18454283 | LOW PRESSURE DROP INTEGRATED PLATE HEAT EXCHANGER | Final Rejection | Hanon Systems |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy50.0% of resolved applications examined by Harry E Arant were allowed (598 resolved cases), compared with 0.0% across Art Unit 3744 over the last five years.
This examiner's interview lift is +21.4 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Harry E Arant took 1,287 days on average from filing to allowance.
Harry E Arant examines applications in Art Unit 3744 in Tech Center 3700 (Medical Devices & Mechanical Engineering).