Listed by the USPTO as DANG, TINH
Tech Center 4100 • Art Units: 3655 3659 4100
This examiner grants 85% of resolved cases
DANG, TINH is a Tech Center 4100 examiner in Art Unit 3655 with 560 resolved cases. The allowance rate is 85.4%, and the median time to allowance is 716 days. The established case volume supports practical planning around claim scope, response timing, and the expected pace of examination.
The interview lift is 7.9%, indicating a positive association with interviews. Practitioners may use interviews to address discrete issues, while keeping the written record and claim language central to the prosecution strategy.
The listed companies are Toyota Motor Corporation, Contemporary Amperex Technology Co., Limited, and Oshkosh Corporation. FOLEY & LARDNER LLP, BIRCH STEWART KOLASCH & BIRCH, LLP, and HAUPTMAN HAM, LLP are the listed firms.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18929617 | VEHICLE FRONT PORTION STRUCTURE | Non-Final OA | TOYOTA JIDOSHA KABUSHIKI KAISHA |
| 18502282 | ELECTRIFIED VEHICLE | Final Rejection | TOYOTA JIDOSHA KABUSHIKI KAISHA |
| 19056146 | BATTERY BOX, BATTERY AND VEHICLE | Non-Final OA | CONTEMPORARY AMPEREX TECHNOLOGY (HONG KONG) LIMITED |
| 18822501 | BOX BODY, BATTERY, AND ELECTRIC DEVICE | Non-Final OA | CONTEMPORARY AMPEREX TECHNOLOGY CO., LIMITED |
| 19054089 | ARTICULATED RIGID AXLE OF A VEHICLE WITH AN AXLE SUPPORT WITH AN ELECTRIC MACHINE AS DRIVE | Non-Final OA | ZF Friedrichshafen AG |
| 18789368 | EMERGENCY OPERATION OF AN LV LOAD OF AN ELECTRIC VEHICLE | Non-Final OA | AUDI AG |
| 18879049 | VEHICLE | Non-Final OA | JATCO Ltd |
| 19013284 | COLD START HYBRID SYSTEM FOR AUTOMOTIVE HYDROGEN FUEL CELL PACKS | Non-Final OA | International Truck Intellectual Property Company, LLC |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy85.4% of resolved applications examined by Tinh Dang were allowed (560 resolved cases), compared with 78.0% across Art Unit 3655 over the last five years.
This examiner's interview lift is +7.9 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Tinh Dang took 716 days on average from filing to allowance.
Tinh Dang examines applications in Art Unit 3655 in Tech Center 4100.