Listed by the USPTO as GIRMA, FEKADESELASS
Tech Center 4100 • Art Units: 1725 2612 2681 2685 2689 3619 4100
This examiner grants 77% of resolved cases
GIRMA, FEKADESELASS is assigned to Technology Center 4100 and Art Unit 1725. Across 1013 resolved cases, the allowance rate is 77.0%, and the median time to allowance is 855 days. The interview lift is 17.4%, showing a positive association between interviews and allowance outcomes in the reported record.
The principal companies are Nissan Motor Co., Ltd., Hyundai Mobis Co., Ltd., and Murata Manufacturing Co., Ltd. The leading firms are WOODARD, EMHARDT, HENRY, REEVES & WAGNER, LLP, ARENTFOX SCHIFF LLP - New York, and Bayes PLLC. The data supports a favorable outcome assessment with interviews used as part of a coordinated response strategy. The median timeline can guide portfolio planning. The company affiliations point to automotive systems and electronic component matters where technical integration may be central.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18879521 | ACCESS CONTROL METHOD AND ACCESS CONTROL APPARATUS | Non-Final OA | Telefonaktiebolaget LM Ericsson (publ) |
| 19132396 | VISUAL SIGNAL GENERATION METHOD AND VEHICLE | Final Rejection | Nissan Motor Co., Ltd. |
| 19034111 | DRIVER ASSISTANCE SYSTEM AND DRIVER ASSISTANCE METHOD | Non-Final OA | HYUNDAI MOBIS CO., LTD. |
| 19262372 | OPERATING DEVICE | Non-Final OA | Murata Manufacturing Co., Ltd. |
| 18614981 | PROGRAMMING LANGUAGE AS A DATA STRUCTURE | Non-Final OA | International Business Machines Corporation |
| 19188765 | INTEGRATING A FIRE ALARM SYSTEM WITH SMART ELECTRICAL SOCKETS OF A FACILITY | Non-Final OA | Honeywell International Inc. |
| 18826432 | Communication System | Non-Final OA | KNORR-BREMSE Systeme fuer Nutzfahrzeuge GmbH |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy77.0% of resolved applications examined by Fekadeselass Girma were allowed (1,013 resolved cases), compared with 65.5% across Art Unit 1725 over the last five years.
This examiner's interview lift is +17.4 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Fekadeselass Girma took 855 days on average from filing to allowance.
Fekadeselass Girma examines applications in Art Unit 1725 in Tech Center 4100.