Listed by the USPTO as SCOVILLE, BLAKE E
Tech Center 3600 • Art Units: 3671
This examiner grants 74% of resolved cases
SCOVILLE, BLAKE E is assigned to Tech Center 3600 and Art Unit 3671. Across 151 resolved cases, the allowance rate is 73.5%, the interview lift is 29.7%, and the median time to allowance is 1154 days. The figures show a moderate-to-high allowance record with interviews serving as a meaningful prosecution tool.
The principal companies are Caterpillar Inc., Oshkosh Corporation, and Nanjing Chervon Industry Co., Ltd. The leading firms are ADE & COMPANY INC., AMSTER, ROTHSTEIN & EBENSTEIN LLP, and DECODE Legal Inc. Practitioners may benefit from preparing interviews around specific mechanical limitations and proposed claim revisions.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 17613027 | SNOW THROWER | Final Rejection | TECHTRONIC CORDLESS GP |
| 18822044 | CABLESS DUMPER | Non-Final OA | Oshkosh Corporation |
| 18617047 | SNOW BLOWER | Final Rejection | Nanjing Chervon Industry Co., Ltd. |
| 18904847 | VACUUM VEHICLE WITH ELECTRICALLY NON-CONDUCTIVE BOOM | Non-Final OA | Federal Signal Corporation |
| 18969347 | FATIGUE LIFE OPTIMIZED MODULAR BUCKET ASSEMBLY | Non-Final OA | Caterpillar Inc. |
| 18798649 | SEMI-MOUNTED AGRICULTURAL IMPLEMENT WITH FORWARD LIFT-ASSIST AND RELATED AGRICULTURAL SYSTEM | Non-Final OA | CNH Industrial America LLC |
| 17724842 | Winged Agricultural Implement with Steerable Transport Wheels | Non-Final OA | ELMER'S WELDING & MANUFACTURING LTD. |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy73.5% of resolved applications examined by Blake E Scoville were allowed (151 resolved cases), compared with 62.3% across Art Unit 3671 over the last five years.
This examiner's interview lift is +29.7 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Blake E Scoville took 1,154 days on average from filing to allowance.
Blake E Scoville examines applications in Art Unit 3671 in Tech Center 3600 (Transportation, E-Commerce & Mechanical Systems).