Listed by the USPTO as TRAN, TRAN M.
Tech Center 3700 • Art Units: 2855 3754 3794
This examiner grants 75% of resolved cases
TRAN, TRAN M. works in Tech Center 3700 and Art Unit 2855. The record covers 647 resolved cases, a 75.0% allowance rate, and a 23.1% interview lift. The median time to allowance is 931 days. The profile shows a favorable allowance outcome across a substantial docket and a meaningful interview-associated effect, supporting a prosecution approach that combines clear written claim analysis with purposeful examiner communications.
TotalEnergies SE, 3M Innovative Properties Company, and Robert Bosch GmbH are the leading companies. The principal firms are GREENBLUM & BERNSTEIN, P.L.C., NORTON ROSE FULBRIGHT US LLP, and TROUTMAN PEPPER LOCKE LLP. Practitioners may use interviews to address focused technical disputes while maintaining detailed support for amendments and claim scope.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18717047 | ADHESIVE DISPENSING SYSTEMS AND METHODS | Non-Final OA | 3M INNOVATIVE PROPERTIES COMPANY |
| 18827921 | SENSOR SYSTEM WITH A MEMS GYROSCOPE AND METHOD FOR OPERATING A SENSOR SYSTEM WITH A MEMS GYROSCOPE | Non-Final OA | Robert Bosch GmbH |
| 18834885 | GYRO SENSOR | Non-Final OA | Panasonic Intellectual Property Management Co., Ltd. |
| 18590771 | PIEZOELECTRIC MEMS CONTACT DETECTION SYSTEM | Non-Final OA | QUALCOMM Incorporated |
| 18852435 | STATE MONITORING SYSTEM AND PROGRAM OF INSPECTION EQUIPMENT | Non-Final OA | KYB Corporation |
| 18851875 | DISPENSER FOR LIQUIDS | Non-Final OA | Aptar Radolfzell GmbH |
| 18851750 | Method for Ascertaining the Fill Level of a Pipe, Analysis Unit, Flow Measuring System, and Computer Program Product | Non-Final OA | Siemens Aktiengesellschaft |
| 17538782 | SEMICONDUCTOR FORCE SENSORS | Non-Final OA | TEXAS INSTRUMENTS INCORPORATED |
| 18848611 | Automatic Analysis Device | Non-Final OA | HITACHI HIGH-TECH CORPORATION |
| 18848505 | MONITORING SYSTEMS AND MONITORING METHODS FOR PNEUMATICALLY ACTUATED DOOR | Non-Final OA | Nanyang Technological University |
| 18686025 | HYDROGEN LEAK DETECTION SYSTEM, HYDROGEN LEAK DETECTION METHOD, AND HYDROGEN TRANSPORT PIPELINE CAPABLE OF HYDROGEN LEAK DETECTION | Non-Final OA | LS CABLE & SYSTEM LTD. |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy75.0% of resolved applications examined by Tran M. Tran were allowed (647 resolved cases), compared with 76.8% across Art Unit 2855 over the last five years.
This examiner's interview lift is +23.1 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Tran M. Tran took 931 days on average from filing to allowance.
Tran M. Tran examines applications in Art Unit 2855 in Tech Center 3700 (Medical Devices & Mechanical Engineering).