3 pending office actions • 3 art units • 3 examiners • 0 of 3 (0%) have an AI response strategy ready
Based on the USPTO statutory response window for each pending office action. 3 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 3 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 1 (33%) |
| §103 only | 2 (67%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| GONZALEZ RAMOS, MAYLA | 1 | 53.9% | +14.2% |
| CANNON, RYAN SMITH | 1 | 55.1% | +36.7% |
| LEVY, MERRITT E | 1 | 33.7% | +34.6% |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18924721 | DETERMINATION OF PARAMETERS FOR SET UP OF FLEXIBLE BRIDGES FOR PHOTOVOLTAIC POWER PLANTS | CANNON, RYAN SMITH | 60d |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 3 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18924733 | DETERMINATION OF PARAMETERS FOR SET UP OF DOCKING STATION FOR ELECTRONIC DEVICES USED IN PHOTOVOLTAIC POWER PLANTS | LEVY, MERRITT E | 35d overdue |
| 18924755 | DETERMINATION OF PARAMETERS FOR SET UP OF FIXED BRIDGES FOR PHOTOVOLTAIC POWER PLANTS | GONZALEZ RAMOS, MAYLA | 10d overdue |
| 18924721 | DETERMINATION OF PARAMETERS FOR SET UP OF FLEXIBLE BRIDGES FOR PHOTOVOLTAIC POWER PLANTS | CANNON, RYAN SMITH | 60d |
| Art Unit | Apps |
|---|---|
| 1721 | 1 |
| 1726 | 1 |
| 3666 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 18924755 | DETERMINATION OF PARAMETERS FOR SET UP OF FIXED BRIDGES FOR PHOTOVOLTAIC POWER PLANTS | GONZALEZ RAMOS, MAYLA | 1721 | §103 | Non-Final OA | 10d overdue | Pending | Oct 23, 2024 |
| 18924721 | DETERMINATION OF PARAMETERS FOR SET UP OF FLEXIBLE BRIDGES FOR PHOTOVOLTAIC POWER PLANTS | CANNON, RYAN SMITH | 1726 | §101 | Non-Final OA | 60d | Pending | Oct 23, 2024 |
| 18924733 | DETERMINATION OF PARAMETERS FOR SET UP OF DOCKING STATION FOR ELECTRONIC DEVICES USED IN PHOTOVOLTAIC POWER PLANTS | LEVY, MERRITT E | 3666 | §103 | Non-Final OA | 35d overdue | Pending | Oct 23, 2024 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial