8 pending office actions • 4 art units • 8 examiners • 0 of 8 (0%) have an AI response strategy ready • 17 patents granted in the last 365 days
Based on the USPTO statutory response window for each pending office action. 1 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §103 only | 4 (50%) |
| Multi-statute (no §101) | 4 (50%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| OWENS, DANELL L | 1 | 76.2% | +10.9% |
| BINDA, GREGORY JOHN | 1 | 81.0% | +11.8% |
| WOLLSCHLAGER, JEFFREY MICHAEL | 1 | 62.2% | +29.5% |
| ALVARE, PAUL | 1 | 57.7% | +37.3% |
| BICKIYA, AIMAN AMIR | 1 | 38.6% | +50.0% |
| CHANG, MINKI | 1 | 71.8% | +10.3% |
| SCHATZ, CHRISTOPHER T | 1 | 62.2% | +26.6% |
| ADENIJI, IBRAHIM M | 1 | 67.7% | +38.8% |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 4 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18978591 | STRUCTURAL JOINT FOR ATTACHING A REMOVABLE AIRCRAFT PANEL TO A FUSELAGE SECTION | BINDA, GREGORY JOHN | — |
| 18940616 | METHOD OF MANUFACTURING Y-SHAPED STRINGERS AND DOUBLE Y-SHAPED SPARS MADE OF COMPOSITE MATERIAL | WOLLSCHLAGER, JEFFREY MICHAEL | — |
| 18779212 | HEAT EXCHANGER | ALVARE, PAUL | — |
| 18474585 | LAY-UP METHOD OF COMPOSITE AIRCRAFT PARTS COMPRISING AN OPENING | SCHATZ, CHRISTOPHER T | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18504448 | INTERNAL COOLING SYSTEMS FOR E-MACHINES | CHANG, MINKI | 11d overdue |
| 18987501 | IMAGE PROJECTOR FOR AIRCRAFT | OWENS, DANELL L | — |
| 18978591 | STRUCTURAL JOINT FOR ATTACHING A REMOVABLE AIRCRAFT PANEL TO A FUSELAGE SECTION | BINDA, GREGORY JOHN | — |
| 18940616 | METHOD OF MANUFACTURING Y-SHAPED STRINGERS AND DOUBLE Y-SHAPED SPARS MADE OF COMPOSITE MATERIAL | WOLLSCHLAGER, JEFFREY MICHAEL | — |
| 18779212 | HEAT EXCHANGER | ALVARE, PAUL | — |
| 18520186 | IN FLIGHT ELECTRICAL CHARGING SYSTEM AND METHOD FOR A BATTERY POWERED AIRCRAFT | BICKIYA, AIMAN AMIR | — |
| 18474585 | LAY-UP METHOD OF COMPOSITE AIRCRAFT PARTS COMPRISING AN OPENING | SCHATZ, CHRISTOPHER T | — |
| 18463022 | DOUBLE-WALL TANK AND AN ASSEMBLING METHOD OF SAID DOUBLE-WALL TANK | ADENIJI, IBRAHIM M | — |
| Art Unit | Apps |
|---|---|
| 3763 | 2 |
| 1742 | 1 |
| 2834 | 1 |
| 1746 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 18987501 | IMAGE PROJECTOR FOR AIRCRAFT | OWENS, DANELL L | — | §103 | Non-Final OA | — | Pending | Dec 19, 2024 |
| 18978591 | STRUCTURAL JOINT FOR ATTACHING A REMOVABLE AIRCRAFT PANEL TO A FUSELAGE SECTION | BINDA, GREGORY JOHN | — | §102§112 | Non-Final OA | — | Pending | Dec 12, 2024 |
| 18940616 | METHOD OF MANUFACTURING Y-SHAPED STRINGERS AND DOUBLE Y-SHAPED SPARS MADE OF COMPOSITE MATERIAL | WOLLSCHLAGER, JEFFREY MICHAEL | 1742 | §103§112 | Non-Final OA | — | Pending | Nov 07, 2024 |
| 18779212 | HEAT EXCHANGER | ALVARE, PAUL | 3763 | §103§112 | Final Rejection | — | Pending | Jul 22, 2024 |
| 18520186 | IN FLIGHT ELECTRICAL CHARGING SYSTEM AND METHOD FOR A BATTERY POWERED AIRCRAFT | BICKIYA, AIMAN AMIR | — | §103 | Non-Final OA | — | Pending | Nov 27, 2023 |
| 18504448 | INTERNAL COOLING SYSTEMS FOR E-MACHINES | CHANG, MINKI | 2834 | §103 | Final Rejection | 11d overdue | Pending | Nov 08, 2023 |
| 18474585 | LAY-UP METHOD OF COMPOSITE AIRCRAFT PARTS COMPRISING AN OPENING | SCHATZ, CHRISTOPHER T | 1746 | §103§112 | Final Rejection | — | Pending | Sep 26, 2023 |
| 18463022 | DOUBLE-WALL TANK AND AN ASSEMBLING METHOD OF SAID DOUBLE-WALL TANK | ADENIJI, IBRAHIM M | 3763 | §103 | Non-Final OA | — | Pending | Sep 07, 2023 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial