Prosecution Insights
Last updated: October 25, 2026

Baoshan Iron & Steel Co., Ltd.

Technology area: Chemistry & Materials

20 pending office actions • 8 art units • 17 examiners • 0 of 20 (0%) have an AI response strategy ready • 29 patents granted in the last 365 days

Analysis

Baoshan Iron & Steel Co., Ltd. has 21 pending office actions in Chemistry & Materials, involving 18 examiners across 8 art units. HEVEY, JOHN A is the busiest examiner, with 3 pending actions.

The docket is broad in examiner coverage but more concentrated by art unit than by individual examiner. Counsel should use art-unit trends to organize related prosecution issues while preserving matter-specific arguments. The busiest examiner may warrant targeted monitoring, although the active workload extends well beyond that assignment.

Written from this page's own data; every figure is computed from USPTO records and verified before publication.

Portfolio Summary

20
Total Pending OAs
12
Non-Final OAs
7
Final Rejections
1
Advisory / Quayle

Response Deadline Pressure

Based on the USPTO statutory response window for each pending office action. 8 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.

1
Overdue
0
Due this week
2
Due this month
1
Due in next 60 days
4
Due later

Deadline Fire Line

Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 8 of the docket's apps have a known mailing date.

-30dToday30d60d90d120d
Overdue (1)Due ≤ 30 days (2)Due ≤ 60 days (1)Due later (4)

Case Difficulty Mix

Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.

10
Hard (50%)
7
Medium (35%)
3
Easy (15%)
0
Unknown (0%)

Rejection Statute Mix

BucketCases
§103 only6 (30%)
§112 only3 (15%)
Double-patenting + other1 (5%)
Multi-statute (no §101)10 (50%)

Industry Mix

How the docket's pending cases split across USPTO tech-center bands.

18
Life Sciences
90% of docket
0
Information Tech
0% of docket
0
Communications
0% of docket
0
Semiconductors
0% of docket
1
Mechanical / Eng
5% of docket
1
Business / Other
5% of docket

Time-on-OA Estimate

Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.

200 h
Manual time on pending OAs
40 h
Time saved (low, 20%)
70 h
Time saved (mid, 35%)
1.8 wks
FTE-weeks freed (mid)

Top Examiners on this docket

ExaminerApps on this docketAllow rateInterview lift
HEVEY, JOHN A 3 61.8% +19.7%
KOSHY, JOPHY STEPHEN 2 63.8% +39.8%
CHRISTY, KATHERINE A 1 75.4% +34.2%
CASE, SARAH CATHERINE 1 41.1% +50.8%
LA VILLA, MICHAEL EUGENE 1 75.7% +18.1%
SU, XIAOWEI 1 71.9% +12.6%
KRUPICKA, ADAM C 1 62.1% +27.0%
WU, JENNY R 1 63.6% +15.9%
SMITH, CATHERINE P 1 16.1% +16.8%
JENNISON, BRIAN W 1 71.9% +22.2%

Hard Cases (10)

Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.

App #TitleExaminerDue in
17927165 Low-Cost Non-Oriented Electrical Steel Plate With Extremely Low Aluminum Content and Manufacturing Method Therefor KOSHY, JOPHY STEPHEN 31d overdue
18551266 LOW-CARBON LOW-ALLOY Q&P STEEL OR HOT-DIP GALVANIZED Q&P STEEL WITH TENSILE STRENGTH GREATER THAN OR EQUAL TO 1180 MPA, AND MANUFACTURING METHOD THEREFOR ROE, JESSEE RANDALL 21d
18552924 DUAL-PHASE STEEL AND HOT-DIP GALVANIZED DUAL-PHASE STEEL HAVING TENSILE STRENGTH GREATER THAN OR EQUAL TO 980MPA AND METHOD FOR MANUFACTURING SAME BY MEANS OF RAPID HEAT TREATMENT HEVEY, JOHN A 61d
18874274 800MPA-GRADE HIGH-HOLE-EXPANSION HOT-DIP GALVANIZED STEEL PLATE AND MANUFACTURING METHOD THEREFOR CHRISTY, KATHERINE A 70d
18842792 COLD ROLLED STEEL PLATE FOR GALVANIZED STEEL PLATE, GALVANIZED STEEL PLATE AND MANUFACTURING METHOD THEREFOR KRUPICKA, ADAM C —
18724975 A COATING FOR GRAIN-ORIENTED SILICON STEEL COATING LAYER, AND GRAIN-ORIENTED SILICON STEEL SHEET AND MANUFACTURING METHOD THEREFOR WU, JENNY R —
18711815 HIGH-STRENGTH STEEL WITH GOOD WEATHER RESISTANCE AND MANUFACTURING METHOD THEREFOR SMITH, CATHERINE P —
18685307 FABRICATION METHOD FOR STEEL THIN-WALLED TAILOR-WELDED PART AND HOT-STAMPED PART PREPARED USING TAILORED-WELDED PART JENNISON, BRIAN W —

Interview Candidates (13)

Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.

App #TitleExaminerDue in
17927165 Low-Cost Non-Oriented Electrical Steel Plate With Extremely Low Aluminum Content and Manufacturing Method Therefor KOSHY, JOPHY STEPHEN 31d overdue
18290401 SEAMLESS STEEL TUBE RESISTANT TO CARBON DIOXIDE CORROSION AND MANUFACTURING METHOD THEREFOR KOSHY, JOPHY STEPHEN 28d
18552924 DUAL-PHASE STEEL AND HOT-DIP GALVANIZED DUAL-PHASE STEEL HAVING TENSILE STRENGTH GREATER THAN OR EQUAL TO 980MPA AND METHOD FOR MANUFACTURING SAME BY MEANS OF RAPID HEAT TREATMENT HEVEY, JOHN A 61d
18874274 800MPA-GRADE HIGH-HOLE-EXPANSION HOT-DIP GALVANIZED STEEL PLATE AND MANUFACTURING METHOD THEREFOR CHRISTY, KATHERINE A 70d
18856986 ALUMINUM ALLOY PLATE FOR TANK AND MANUFACTURING METHOD THEREFOR LA VILLA, MICHAEL EUGENE 70d
18864519 STABILIZATION TREATMENT LIQUID FOR 690 MPA-GRADE WEATHER-RESISTANT BRIDGE STEEL MEMBER, TREATMENT METHOD AND USE CASE, SARAH CATHERINE —
18851166 HOT-STAMPED COMPONENT HAVING HIGH COLD-BENDING PERFORMANCE AND HIGH STRENGTH, AND MANUFACTURING METHOD THEREFOR SU, XIAOWEI —
18842792 COLD ROLLED STEEL PLATE FOR GALVANIZED STEEL PLATE, GALVANIZED STEEL PLATE AND MANUFACTURING METHOD THEREFOR KRUPICKA, ADAM C —

Top Art Units

Art UnitApps
1733 5
1784 4
1735 4
1759 2
1731 1
3761 1
1738 1
1734 1

Pending Office Actions

App #TitleExaminerArt UnitStatutesStatusDue inAIFiled
18874274 800MPA-GRADE HIGH-HOLE-EXPANSION HOT-DIP GALVANIZED STEEL PLATE AND MANUFACTURING METHOD THEREFOR CHRISTY, KATHERINE A 1784 §103§112 Non-Final OA 70d Pending Dec 12, 2024
18864519 STABILIZATION TREATMENT LIQUID FOR 690 MPA-GRADE WEATHER-RESISTANT BRIDGE STEEL MEMBER, TREATMENT METHOD AND USE CASE, SARAH CATHERINE 1731 §112 Non-Final OA — Pending Nov 09, 2024
18856986 ALUMINUM ALLOY PLATE FOR TANK AND MANUFACTURING METHOD THEREFOR LA VILLA, MICHAEL EUGENE 1784 §112 Final Rejection 70d Pending Oct 15, 2024
18851166 HOT-STAMPED COMPONENT HAVING HIGH COLD-BENDING PERFORMANCE AND HIGH STRENGTH, AND MANUFACTURING METHOD THEREFOR SU, XIAOWEI 1784 §103 Final Rejection — Pending Sep 26, 2024
18842792 COLD ROLLED STEEL PLATE FOR GALVANIZED STEEL PLATE, GALVANIZED STEEL PLATE AND MANUFACTURING METHOD THEREFOR KRUPICKA, ADAM C 1784 §103§112 Non-Final OA — Pending Aug 29, 2024
18724975 A COATING FOR GRAIN-ORIENTED SILICON STEEL COATING LAYER, AND GRAIN-ORIENTED SILICON STEEL SHEET AND MANUFACTURING METHOD THEREFOR WU, JENNY R — §102§103 Non-Final OA — Pending Jun 27, 2024
18712635 STEEL PIPE FOR OIL CYLINDER AND MANUFACTURING METHOD THEREFOR HEVEY, JOHN A 1735 §103§112DP Non-Final OA — Pending May 22, 2024
18711815 HIGH-STRENGTH STEEL WITH GOOD WEATHER RESISTANCE AND MANUFACTURING METHOD THEREFOR SMITH, CATHERINE P 1735 §103§112 Non-Final OA — Pending May 20, 2024
18685307 FABRICATION METHOD FOR STEEL THIN-WALLED TAILOR-WELDED PART AND HOT-STAMPED PART PREPARED USING TAILORED-WELDED PART JENNISON, BRIAN W 3761 §102§103§112 Non-Final OA — Pending Feb 21, 2024
18574136 METHOD FOR PREPARING TITANIUM-CONTAINING ULTRA-LOW-CARBON STEEL SHAMS, NAZMUN NAHAR 1738 §103§112 Final Rejection — Pending Dec 26, 2023
18290401 SEAMLESS STEEL TUBE RESISTANT TO CARBON DIOXIDE CORROSION AND MANUFACTURING METHOD THEREFOR KOSHY, JOPHY STEPHEN 1733 §103 Final Rejection 28d Pending Nov 13, 2023
18557724 HOT STAMPING COMPONENT HAVING TENSILE STRENGTH GREATER OR EQUAL TO 1000 MPA AND FABRICATION METHOD THEREFOR STILES, JACOB BENJAMIN 1733 §103 Final Rejection 75d Pending Oct 27, 2023
18552924 DUAL-PHASE STEEL AND HOT-DIP GALVANIZED DUAL-PHASE STEEL HAVING TENSILE STRENGTH GREATER THAN OR EQUAL TO 980MPA AND METHOD FOR MANUFACTURING SAME BY MEANS OF RAPID HEAT TREATMENT HEVEY, JOHN A 1735 §102§103 Final Rejection 61d Pending Sep 28, 2023
18552966 HOT-DIPPED ALUMINUM-ZINC OR HOT-DIPPED ZINC-ALUMINUM-MAGNESIUM MULTIPHASE STEEL HAVING YIELD STRENGTH OF GREATER THAN OR EQUAL TO 450 MPA AND RAPID HEAT-TREATMENT HOT PLATING MANUFACTURING METHOD THEREFOR HEVEY, JOHN A 1735 §103 Final Rejection — Pending Sep 28, 2023
18551266 LOW-CARBON LOW-ALLOY Q&P STEEL OR HOT-DIP GALVANIZED Q&P STEEL WITH TENSILE STRENGTH GREATER THAN OR EQUAL TO 1180 MPA, AND MANUFACTURING METHOD THEREFOR ROE, JESSEE RANDALL 1759 §103§112 Non-Final OA 21d Pending Sep 19, 2023
18043036 780 MPA-GRADE ULTRA-HIGH REAMING STEEL HAVING HIGH SURFACE QUALITY AND HIGH PERFORMANCE STABILITY, AND MANUFACTURING METHOD THEREFOR KESSLER, CHRISTOPHER S 1759 §112 Non-Final OA — Pending Feb 26, 2023
18043034 GPA-GRADE BAINITE STEEL HAVING ULTRA-HIGH YIELD RATIO AND MANUFACTURING METHOD FOR GPA-GRADE BAINITE STEEL WANG, NICHOLAS A 1734 §103 Non-Final OA — Pending Feb 26, 2023
18017285 STEEL PLATE FOR TORSION BEAM AND MANUFACTURING METHOD THEREFOR, AND TORSION BEAM AND MANUFACTURING METHOD THEREFOR ALDAZ CERVANTES, MAYELA RENATA 1733 §103 Non-Final OA 34d Pending Jan 20, 2023
17927165 Low-Cost Non-Oriented Electrical Steel Plate With Extremely Low Aluminum Content and Manufacturing Method Therefor KOSHY, JOPHY STEPHEN 1733 §102§103§112 Non-Final OA 31d overdue Pending Nov 22, 2022
17802605 BLAST FURNACE SLAG GRANULATION AND WASTE HEAT RECOVERY AND UTILIZATION DEVICE AND METHOD SMOOT, MORIAH SIMONE MCMIL 1733 §103§112 Non-Final OA — Pending Aug 26, 2022

Managing Baoshan Iron & Steel Co., Ltd.'s Patent Portfolio?

IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.

Start Free Trial

Frequently Asked Questions

How many pending USPTO office actions does Baoshan Iron & Steel Co., Ltd. have?

Baoshan Iron & Steel Co., Ltd. has 20 pending office actions as of October 2026, spread across 8 art units and 17 examiners.

Which USPTO examiner handles the most Baoshan Iron & Steel Co., Ltd. applications?

John A Hevey has the most, with 3 of Baoshan Iron & Steel Co., Ltd.'s pending office actions.

What technology area are Baoshan Iron & Steel Co., Ltd.'s patent applications in?

Mostly Chemistry & Materials (USPTO Tech Center 1700), based on where its pending office actions are examined.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month