Listed by the USPTO as WU, JENNY R
Tech Center 2800 • Art Units: 1724 1733 1734 1759 2837
This examiner grants 64% of resolved cases
WU, JENNY R is assigned to Tech Center 2800 and Art Unit 1724. Across 869 resolved cases, the allowance rate is 63.6%, the interview lift is 15.9%, and the median time to allowance is 1136 days. The positive interview measure suggests that discussions may support progress, but the allowance result indicates that interviews should be combined with careful written prosecution. The median pendency figure also supports active docket management.
The leading companies are ArcelorMittal, Posco Co. Ltd., and JFE Steel Corporation. The leading firms are Davidson Kappel LLC, von Briesen & Roper, s.c., and Arent Fox LLP and Divergent Technologies Inc. The applicant mix is concentrated in steel and materials technologies. Practitioners may benefit from interviews that explain process conditions, material characteristics, and claim distinctions in a structured manner.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18723522 | METHOD FOR PRODUCING STEEL MEMBER | Non-Final OA | AISIN CORPORATION |
| 18842140 | STEEL SHEET, MEMBER, AND METHODS OF PRODUCING SAME | Non-Final OA | JFE STEEL CORPORATION |
| 18689864 | AGING TREATMENT METHOD AND METHOD OF PRODUCING GRAIN-ORIENTED ELECTRICAL STEEL SHEET | Final Rejection | JFE STEEL CORPORATION |
| 18754268 | Method for the fabrication of a resistance spot weld | Non-Final OA | ArcelorMittal |
| 18686951 | HOT ROLLED AND STEEL SHEET AND A METHOD OF MANUFACTURING THEREOF | Non-Final OA | ArcelorMittal |
| 18287106 | Gas atomization of molten steel | Non-Final OA | ArcelorMittal |
| 18495814 | METHOD OF USING METAL COUPON WITH POROUS REGION FOR COMPONENT | Final Rejection | GE Infrastructure Technology LLC |
| 18837473 | STEEL SHEET AND METHOD FOR MANUFACTURING STEEL SHEET | Non-Final OA | NIPPON STEEL CORPORATION |
| 18724764 | STEEL MATERIAL SUITABLE FOR USE IN SOUR ENVIRONMENT | Non-Final OA | NIPPON STEEL CORPORATION |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy63.6% of resolved applications examined by Jenny R Wu were allowed (869 resolved cases), compared with 63.2% across Art Unit 1724 over the last five years.
This examiner's interview lift is +15.9 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Jenny R Wu took 1,136 days on average from filing to allowance.
Jenny R Wu examines applications in Art Unit 1724 in Tech Center 2800 (Semiconductors, Circuits & Optics).