Technology area: Transportation, E-Commerce & Mechanical Systems
7 pending office actions • 5 art units • 6 examiners • 0 of 7 (0%) have an AI response strategy ready • 11 patents granted in the last 365 days
BRP-Rotax GmbH & Co. KG has 7 pending office actions in Transportation, E-Commerce & Mechanical Systems. The portfolio involves 6 examiners across 5 art units, indicating modest repetition among assignments.
JOYCE, WILLIAM C is the busiest examiner, with 2 pending matters. Counsel can coordinate review of those matters while maintaining application-specific strategies for the remaining assignments and tracking the separate art-unit issues.
Based on the USPTO statutory response window for each pending office action. 1 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 + other | 1 (14%) |
| §103 only | 2 (29%) |
| Multi-statute (no §101) | 4 (57%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| JOYCE, WILLIAM C | 2 | 69.7% | +16.0% |
| JIN, GEORGE C. | 1 | 84.2% | +13.3% |
| MEDANI, MOHAMED | 1 | 71.7% | +25.2% |
| SHABARA, HOSAM | 1 | 82.8% | +16.1% |
| MANG, LAL C | 1 | 75.7% | +19.1% |
| BLAUFELD, JUSTIN R | 1 | 47.5% | +30.1% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19151316 | SYSTEMS AND METHOD FOR MANAGING TEMPERATURE IN AN ENGINE OF A VEHICLE | JIN, GEORGE C. | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 5 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18687136 | ELECTRIC BICYCLE | SHABARA, HOSAM | 4d overdue |
| 19037399 | METHOD FOR CONTROLLING GEAR SHIFTING OF A BICYCLE AND BICYCLE | MEDANI, MOHAMED | — |
| 18659157 | SHIFTING AND GEAR ASSEMBLY FOR TRANSMISSION | JOYCE, WILLIAM C | — |
| 18682292 | ENGINE ASSEMBLY FOR A VEHICLE AND METHOD FOR DETERMINING PISTON TEMPERATURE IN AN ENGINE | MANG, LAL C | — |
| 18545523 | BOOST SYSTEM FOR AN ELECTRIC VEHICLE, ELECTRIC VEHICLE HAVING SAME, AND METHOD FOR BOOSTING A SPEED OF AN ELECTRIC VEHICLE | BLAUFELD, JUSTIN R | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 7 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18687136 | ELECTRIC BICYCLE | SHABARA, HOSAM | 4d overdue |
| 19151316 | SYSTEMS AND METHOD FOR MANAGING TEMPERATURE IN AN ENGINE OF A VEHICLE | JIN, GEORGE C. | — |
| 19037399 | METHOD FOR CONTROLLING GEAR SHIFTING OF A BICYCLE AND BICYCLE | MEDANI, MOHAMED | — |
| 18659157 | SHIFTING AND GEAR ASSEMBLY FOR TRANSMISSION | JOYCE, WILLIAM C | — |
| 18687143 | SHIFTING AND GEAR ASSEMBLY FOR TRANSMISSION | JOYCE, WILLIAM C | — |
| 18682292 | ENGINE ASSEMBLY FOR A VEHICLE AND METHOD FOR DETERMINING PISTON TEMPERATURE IN AN ENGINE | MANG, LAL C | — |
| 18545523 | BOOST SYSTEM FOR AN ELECTRIC VEHICLE, ELECTRIC VEHICLE HAVING SAME, AND METHOD FOR BOOSTING A SPEED OF AN ELECTRIC VEHICLE | BLAUFELD, JUSTIN R | — |
| Art Unit | Apps |
|---|---|
| 3618 | 3 |
| 3747 | 1 |
| 3611 | 1 |
| 2857 | 1 |
| 2151 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19151316 | SYSTEMS AND METHOD FOR MANAGING TEMPERATURE IN AN ENGINE OF A VEHICLE | JIN, GEORGE C. | 3747 | §103 | Non-Final OA | — | Pending | Jul 26, 2025 |
| 19037399 | METHOD FOR CONTROLLING GEAR SHIFTING OF A BICYCLE AND BICYCLE | MEDANI, MOHAMED | 3611 | §102§103§112 | Non-Final OA | — | Pending | Jan 27, 2025 |
| 18659157 | SHIFTING AND GEAR ASSEMBLY FOR TRANSMISSION | JOYCE, WILLIAM C | 3618 | §103§112 | Non-Final OA | — | Pending | May 09, 2024 |
| 18687136 | ELECTRIC BICYCLE | SHABARA, HOSAM | 3618 | §102§103 | Non-Final OA | 4d overdue | Pending | Feb 27, 2024 |
| 18687143 | SHIFTING AND GEAR ASSEMBLY FOR TRANSMISSION | JOYCE, WILLIAM C | 3618 | §103 | Non-Final OA | — | Pending | Feb 27, 2024 |
| 18682292 | ENGINE ASSEMBLY FOR A VEHICLE AND METHOD FOR DETERMINING PISTON TEMPERATURE IN AN ENGINE | MANG, LAL C | 2857 | §101§103 | Final Rejection | — | Pending | Feb 08, 2024 |
| 18545523 | BOOST SYSTEM FOR AN ELECTRIC VEHICLE, ELECTRIC VEHICLE HAVING SAME, AND METHOD FOR BOOSTING A SPEED OF AN ELECTRIC VEHICLE | BLAUFELD, JUSTIN R | 2151 | §103§112 | Non-Final OA | — | Pending | Dec 19, 2023 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialBRP-Rotax GmbH & Co. KG has 7 pending office actions as of November 2026, spread across 5 art units and 6 examiners.
William C Joyce has the most, with 2 of BRP-Rotax GmbH & Co. KG's pending office actions.
Mostly Transportation, E-Commerce & Mechanical Systems (USPTO Tech Center 3600), based on where its pending office actions are examined.