Listed by the USPTO as MANG, LAL C
Tech Center 2800 • Art Units: 2116 2857 2859 2863
This examiner grants 76% of resolved cases
MANG, LAL C works in tech center 2800 and art unit 2116. The profile includes 197 resolved cases, a 75.6% allowance rate, and a median of 1059 days to allowance. The 18.1% interview lift indicates that interviews are associated with improved allowance outcomes in the recorded cases.
Recurring companies include Halliburton Energy Services Inc., Samsung Electronics Co., Ltd., and Schlumberger Technology Corporation. The listed firms are HAUPTMAN HAM, LLP, BANNER & WITCOFF, LTD., and Barron & Young PLLC. The profile gives practitioners both a prosecution outcome baseline and a set of recurring participants.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18327395 | METHOD AND ELECTRONIC DEVICE FOR FORECASTING REMAINING USEFUL LIFE (RUL) OF BATTERY | Final Rejection | Samsung Electronics Co., Ltd. |
| 18725547 | PROCESSING GEOPHYSICS DATA IN THE IMAGE DOMAIN IN REAL-TIME | Non-Final OA | Schlumberger Technology Corporation |
| 18350213 | RUN DATA CALIBRATION AND MACHINE LEARNING SYSTEM FOR WELL FACILITIES | Final Rejection | HALLIBURTON ENERGY SERVICES, INC. |
| 18085240 | Real-Time Warning And Mitigation Of Intrinsic Noise Of Transducers | Final Rejection | Halliburton Energy Services, Inc. |
| 18173216 | System and Method for Determining Events in a Cabin of a Vehicle | Non-Final OA | Robert Bosch GmbH |
| 18746180 | Computer-Implemented Method for Determining an Energy Ratio for a Consumed Energy | Non-Final OA | ABB Schweiz AG |
| 18029731 | Battery Management Apparatus and Method | Final Rejection | LG Energy Solution, Ltd. |
| 18701514 | SHAPE ACQUISITION METHOD, OBJECT MANAGEMENT METHOD, WORK SUPPORT METHOD, SHAPE ACQUISITION SYSTEM, AND WORK SUPPORT SYSTEM | Non-Final OA | NIKON CORPORATION |
| 18682292 | ENGINE ASSEMBLY FOR A VEHICLE AND METHOD FOR DETERMINING PISTON TEMPERATURE IN AN ENGINE | Final Rejection | BRP-ROTAX GMBH & CO. KG |
| 18642865 | EARLY WARNING METHOD FOR DEBRIS FLOW DISASTER IN SMALL WATERSHED, AND DISASTER REDUCTION METHOD FOR DEBRIS FLOWS IN SMALL WATERSHED | Non-Final OA | Zhejiang University |
| 18298841 | BATTERY MODULE MONITORING AND REPURPOSING | Non-Final OA | Caterpillar Inc. |
| 18704203 | Method for Assessing an Electrical Storage Cell | Non-Final OA | Siemens Aktiengesellschaft |
| 18647742 | CROSS-MODAL ASSOCIATION BETWEEN WEARABLE AND STRUCTURAL VIBRATION SIGNAL SEGMENTS FOR INDOOR OCCUPANT SENSING | Non-Final OA | THE REGENTS OF THE UNIVERSITY OF CALIFORNIA |
| 18564433 | BEARING DEVICE STATE DETECTING METHOD, DETECTING DEVICE, AND PROGRAM | Non-Final OA | NSK LTD. |
| 18647306 | UNDESIRED OPERATION IDENTIFICATION FROM LOG ENTRY MATCHING ON A DIRECTED ACYCLIC GRAPH | Non-Final OA | Dell Products L.P. |
| 17894252 | DATA PROCESSING METHOD AND DATA PROCESSING SYSTEM | Non-Final OA | SHIMADZU CORPORATION |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy75.6% of resolved applications examined by Lal C Mang were allowed (197 resolved cases), compared with 70.1% across Art Unit 2116 over the last five years.
This examiner's interview lift is +18.1 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Lal C Mang took 1,059 days on average from filing to allowance.
Lal C Mang examines applications in Art Unit 2116 in Tech Center 2800 (Semiconductors, Circuits & Optics).