Technology areas: Semiconductors, Circuits & Optics • Transportation, E-Commerce & Mechanical Systems • Medical Devices & Mechanical Engineering
6 pending office actions • 3 art units • 6 examiners • 0 of 6 (0%) have an AI response strategy ready • 2 patents granted in the last 365 days
Ejot SE & Co. Kg is managing 5 pending office actions within the Semiconductors, Circuits & Optics technology area. These actions are distributed across 5 distinct examiners, meaning every pending matter is being reviewed by a different individual. Furthermore, these matters are spread across 3 distinct art units, indicating that the portfolio touches upon several different technical specialties within the semiconductor field. This variety requires a flexible approach to prosecution across the 3 distinct art units.
The busiest examiner for this portfolio is MCCALISTER, WILLIAM M, who is currently handling 1 pending office action. Given that there are 5 distinct examiners for 5 total actions, the workload is spread individually across the patent office staff. Practitioners should be prepared to address the specific preferences of 5 different examiners while navigating the requirements of the 3 distinct art units involved in these cases.
Based on the USPTO statutory response window for each pending office action. 1 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §103 only | 1 (17%) |
| §112 only | 1 (17%) |
| Multi-statute (no §101) | 4 (67%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| FAROOQ, AHMAD | 1 | — | — |
| MCCALISTER, WILLIAM M | 1 | 69.0% | +19.6% |
| MALEVIC, DJURA | 1 | 78.1% | +9.8% |
| DAVIS, CASSANDRA HOPE | 1 | 59.3% | +25.9% |
| MAGAR, DIL KUMAR | 1 | 54.8% | +14.9% |
| WALTERS, RYAN J | 1 | 74.4% | +29.1% |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 4 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18562281 | HAND-HELD MACHINE FOR REMOVING A FRICTION-WELDED ELEMENT FROM A COMPONENT ASSEMBLY | WALTERS, RYAN J | 30d overdue |
| 19102367 | SCREW FOR DIRECT SCREWING INTO A COMPONENT | FAROOQ, AHMAD | — |
| 18849303 | HOLDING PLATE FOR MULTIPLE SCREW DIAMETERS | MCCALISTER, WILLIAM M | — |
| 18835931 | METHOD AND DEVICE FOR NON-DESTRUCTIVELY TESTING A CONNECTION POINT IN A COMPONENT ASSEMBLY | MALEVIC, DJURA | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 4 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18562281 | HAND-HELD MACHINE FOR REMOVING A FRICTION-WELDED ELEMENT FROM A COMPONENT ASSEMBLY | WALTERS, RYAN J | 30d overdue |
| 18849303 | HOLDING PLATE FOR MULTIPLE SCREW DIAMETERS | MCCALISTER, WILLIAM M | — |
| 18727134 | SCREW WITH A HOLE-FORMING TIP | DAVIS, CASSANDRA HOPE | — |
| 18577223 | SPACING FASTENER | MAGAR, DIL KUMAR | — |
| Art Unit | Apps |
|---|---|
| 2884 | 1 |
| 3675 | 1 |
| 3799 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19102367 | SCREW FOR DIRECT SCREWING INTO A COMPONENT | FAROOQ, AHMAD | — | §103§112 | Non-Final OA | — | Pending | Feb 07, 2025 |
| 18849303 | HOLDING PLATE FOR MULTIPLE SCREW DIAMETERS | MCCALISTER, WILLIAM M | — | §103§112 | Non-Final OA | — | Pending | Sep 20, 2024 |
| 18835931 | METHOD AND DEVICE FOR NON-DESTRUCTIVELY TESTING A CONNECTION POINT IN A COMPONENT ASSEMBLY | MALEVIC, DJURA | 2884 | §103§112 | Non-Final OA | — | Pending | Aug 05, 2024 |
| 18727134 | SCREW WITH A HOLE-FORMING TIP | DAVIS, CASSANDRA HOPE | — | §112 | Non-Final OA | — | Pending | Jul 08, 2024 |
| 18577223 | SPACING FASTENER | MAGAR, DIL KUMAR | 3675 | §103 | Final Rejection | — | Pending | Jan 05, 2024 |
| 18562281 | HAND-HELD MACHINE FOR REMOVING A FRICTION-WELDED ELEMENT FROM A COMPONENT ASSEMBLY | WALTERS, RYAN J | 3799 | §102§103 | Final Rejection | 30d overdue | Pending | Nov 17, 2023 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial