Technology areas: Computing & Software • Networking & Security • Communications
27 pending office actions • 23 art units • 27 examiners • 0 of 27 (0%) have an AI response strategy ready • 29 patents granted in the last 365 days
MaxLinear Inc. has 28 pending office actions in Computing & Software. Each matter is assigned to a distinct examiner, while the docket spans 21 distinct art units. The examiner dispersion calls for application-specific prosecution management, and the repeated art-unit assignments support technical grouping and issue tracking.
VO, TIM T is the busiest examiner, with 1 pending matter. The profile does not show examiner concentration, so counsel should coordinate recurring art-unit issues without treating any single examiner's approach as representative of the docket.
Based on the USPTO statutory response window for each pending office action. 9 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 9 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 + other | 3 (11%) |
| §103 only | 13 (48%) |
| §102 only | 2 (7%) |
| Multi-statute (no §101) | 9 (33%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| VO, TIM T | 1 | 57.3% | +24.2% |
| DEPPE, BETSY LEE | 1 | 84.6% | +9.1% |
| JACKSON, JAYLUN ARMAN | 1 | — | — |
| GBLENDE, JEFFREY A | 1 | 85.8% | +8.6% |
| GREGORY, BERNARR E | 1 | 90.5% | +6.7% |
| PHAN, HANH | 1 | 88.8% | +6.5% |
| MCQUITERY, DIEDRA M | 1 | 73.4% | +28.2% |
| LEE, JAI M | 1 | 77.3% | +11.1% |
| DELA ROSA-FRIO, JACOB ETHAN | 1 | — | — |
| LA, PHONG | 1 | 89.2% | +11.4% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 2 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19056541 | CURRENT INFORMATION SHARING OF CONSTANT-ON-TIME POINT-OF-LOAD CONVERTERS | GBLENDE, JEFFREY A | — |
| 19021006 | PHYSICAL MEDIUM DEPENDENT (PMD) MODULE WITH BURST PREDICTION | PHAN, HANH | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18506949 | SIGNAL-TO-INTERFERENCE PLUS NOISE RATIO (SINR)-AWARE SPATIAL REUSE | DINH, JOSEPH NGHIA | 46d overdue |
| 18621031 | WIRELESS MESH NETWORK OPTIMIZATION | AJIBADE AKONAI, OLUMIDE | 5d |
| 18348278 | DATA TRANSFORM ACCELERATION USING INPUT/OUTPUT VIRTUALIZATION | RIGGINS, ARI FAITH COLEMA | 15d |
| 19216597 | SWITCHING SYSTEM-ON-A-CHIP | VO, TIM T | — |
| 19080739 | LINK TRAINING FOR BOOKENDED LINKS | DEPPE, BETSY LEE | — |
| 19030972 | PHASED ARRAY AUTOMOTIVE RADAR | GREGORY, BERNARR E | — |
| 19000633 | HASHING FOR DEDUPLICATION THROUGH SKIPPING SELECTED DATA | MCQUITERY, DIEDRA M | — |
| 18924910 | COORDINATED SCHEDULING FOR OVERLAPPING BASIC SERVICE SETS (OBSSs) | LA, PHONG | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 4 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19216597 | SWITCHING SYSTEM-ON-A-CHIP | VO, TIM T | — |
| 19000633 | HASHING FOR DEDUPLICATION THROUGH SKIPPING SELECTED DATA | MCQUITERY, DIEDRA M | — |
| 18961424 | OPTICAL NETWORK UNIT ACTIVATION AND LOW LATENCY TRANSMISSIONS IN DELAY SENSITIVE NETWORKS | LEE, JAI M | — |
| 18924910 | COORDINATED SCHEDULING FOR OVERLAPPING BASIC SERVICE SETS (OBSSs) | LA, PHONG | — |
| Art Unit | Apps |
|---|---|
| 2112 | 2 |
| 2634 | 2 |
| 2635 | 2 |
| 3648 | 2 |
| 2138 | 1 |
| 2633 | 1 |
| 2838 | 1 |
| 3646 | 1 |
| 2166 | 1 |
| 2469 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19216597 | SWITCHING SYSTEM-ON-A-CHIP | VO, TIM T | 2138 | §103§112 | Non-Final OA | — | Pending | May 22, 2025 |
| 19080739 | LINK TRAINING FOR BOOKENDED LINKS | DEPPE, BETSY LEE | 2633 | §103§112 | Non-Final OA | — | Pending | Mar 14, 2025 |
| 19075739 | WIRELESS UNEQUAL MODULATION | JACKSON, JAYLUN ARMAN | 2112 | §103 | Non-Final OA | — | Pending | Mar 10, 2025 |
| 19056541 | CURRENT INFORMATION SHARING OF CONSTANT-ON-TIME POINT-OF-LOAD CONVERTERS | GBLENDE, JEFFREY A | 2838 | §102 | Non-Final OA | — | Pending | Feb 18, 2025 |
| 19030972 | PHASED ARRAY AUTOMOTIVE RADAR | GREGORY, BERNARR E | 3646 | §103§112 | Non-Final OA | — | Pending | Jan 17, 2025 |
| 19021006 | PHYSICAL MEDIUM DEPENDENT (PMD) MODULE WITH BURST PREDICTION | PHAN, HANH | 2634 | §102Other | Non-Final OA | — | Pending | Jan 14, 2025 |
| 19000633 | HASHING FOR DEDUPLICATION THROUGH SKIPPING SELECTED DATA | MCQUITERY, DIEDRA M | 2166 | §103§112 | Non-Final OA | — | Pending | Dec 23, 2024 |
| 18961424 | OPTICAL NETWORK UNIT ACTIVATION AND LOW LATENCY TRANSMISSIONS IN DELAY SENSITIVE NETWORKS | LEE, JAI M | 2634 | §103Other | Non-Final OA | — | Pending | Nov 26, 2024 |
| 18929528 | PHOTOCURRENT SENSING FOR FEEDBACK CONTROL | DELA ROSA-FRIO, JACOB ETHAN | 2635 | §103 | Non-Final OA | — | Pending | Oct 28, 2024 |
| 18924910 | COORDINATED SCHEDULING FOR OVERLAPPING BASIC SERVICE SETS (OBSSs) | LA, PHONG | 2469 | §102§103 | Non-Final OA | — | Pending | Oct 23, 2024 |
| 18924902 | MODULATION AND CODING SCHEME (MCS) FOR MIXED CRITICALITY PHYSICAL LAYER PROTOCOL DATA UNIT (PPDU) | ELLIOTT IV, BENJAMIN H | 2474 | §102§103§112 | Non-Final OA | — | Pending | Oct 23, 2024 |
| 18851678 | PASSIVE OPTICAL NETWORK PERFORMANCE PARAMETER MEASUREMENT AND ONLINE RECONFIGURATION | LI, SHI K | 2635 | §103 | Final Rejection | — | Pending | Sep 26, 2024 |
| 18829276 | COORDINATED SPATIAL RE-USE | ONAMUTI, GBEMILEKE J | 2463 | §103 | Non-Final OA | — | Pending | Sep 09, 2024 |
| 18817217 | LOAD BALANCING IN A DATA TRANSFORM ACCELERATOR | CONRAD, KAYLA ELIZABETH | 2194 | §101§102§103§112 | Non-Final OA | — | Pending | Aug 27, 2024 |
| 18762573 | DEVICE WITH MULTI-CHANNEL BONDING | ALSHACK, OSMAN M | 2112 | §103 | Final Rejection | — | Pending | Jul 02, 2024 |
| 18752682 | MULTI-LINK OPERATION ADAPTATION | WEI, SIREN | 2467 | §102§103 | Non-Final OA | — | Pending | Jun 24, 2024 |
| 18621031 | WIRELESS MESH NETWORK OPTIMIZATION | AJIBADE AKONAI, OLUMIDE | 3648 | §101§103 | Final Rejection | 5d | Pending | Mar 28, 2024 |
| 18621022 | WIRELESS STATION ZONING | IQBAL, KHAWAR | 2643 | §103 | Final Rejection | — | Pending | Mar 28, 2024 |
| 18613098 | LOW LATENCY MULTI-LINK DEVICE (MLD) PHY/MAC RELAY (LLMR) | ACOLATSE, KODZOVI | 2478 | §103 | Final Rejection | 1d overdue | Pending | Mar 21, 2024 |
| 18596556 | DATA TRANSFORM OPERATIONS IN A DATA TRANSFORM ACCELERATOR | MORRIS, JOHN J | 2152 | §103 | Final Rejection | 27d | Pending | Mar 05, 2024 |
| 18427692 | SYSTEM COMMUNICATION TECHNIQUE OVER PCIe (PERIPHERAL COMPONENT INTERCONNECT EXPRESS) LINK | PATEL, NIMESH G | 2176 | §103 | Final Rejection | 3d overdue | Pending | Jan 30, 2024 |
| 18506949 | SIGNAL-TO-INTERFERENCE PLUS NOISE RATIO (SINR)-AWARE SPATIAL REUSE | DINH, JOSEPH NGHIA | 2641 | §102§103 | Final Rejection | 46d overdue | Pending | Nov 10, 2023 |
| 18348278 | DATA TRANSFORM ACCELERATION USING INPUT/OUTPUT VIRTUALIZATION | RIGGINS, ARI FAITH COLEMA | 2197 | §101§103§112 | Final Rejection | 15d | Pending | Jul 06, 2023 |
| 18295264 | RECEIVER SENSITIVITY IMPROVEMENT BY PASSIVE INTERMODULATION CANCELLATION | TSVEY, GENNADIY | 2648 | §103 | Final Rejection | 19d overdue | Pending | Apr 03, 2023 |
| 18162606 | GAIN CONTROL IN AN ORTHOGONAL FREQUENCY DIVISION MULTIPLEXED RADAR SYSTEM | WAHEED, NAZRA NUR | 3648 | §103 | Final Rejection | 162d overdue | Pending | Jan 31, 2023 |
| 17165910 | HASHING WITH DIFFERING HASH SIZE AND COMPRESSION SIZE | HO, ANDREW N | 2169 | §103 | Non-Final OA | 14d | Pending | Feb 02, 2021 |
| 14207695 | Flow control between processing devices | YEUNG, MANG HANG | 2417 | §103§112 | Non-Final OA | — | Pending | Mar 13, 2014 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialMaxLinear Inc. has 27 pending office actions as of October 2026, spread across 23 art units and 27 examiners.
Tim T Vo has the most, with 1 of MaxLinear Inc.'s pending office actions.
Mostly Computing & Software (USPTO Tech Center 2100), based on where its pending office actions are examined.