Technology areas: Transportation, E-Commerce & Mechanical Systems • Medical Devices & Mechanical Engineering
10 pending office actions • 6 art units • 10 examiners • 0 of 10 (0%) have an AI response strategy ready • 23 patents granted in the last 365 days
National Oilwell Varco L.P. has 13 pending office actions in Transportation, E-Commerce & Mechanical Systems. The matters involve 13 distinct examiners and 7 distinct art units, showing broad examiner distribution with recurring activity across the art-unit structure.
DAVIS, MARY ALICE is the busiest examiner, with 1 pending matter. Because no examiner has a larger concentration, portfolio management should emphasize matter-level tracking. The 7 art units provide a practical basis for coordinating technical positions, while examiner-specific treatment remains important across the 13 assignments.
Based on the USPTO statutory response window for each pending office action. 7 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 7 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 1 (10%) |
| §103 only | 1 (10%) |
| Multi-statute (no §101) | 8 (80%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| DAVIS, MARY ALICE | 1 | 77.4% | +31.8% |
| RAILEY, JENNIFER A | 1 | 79.6% | +7.9% |
| OMGBA, ESSAMA | 1 | 59.2% | +32.9% |
| BOCHNA, DAVID | 1 | 79.9% | +13.6% |
| CHOI, WILLIAM SOON | 1 | 74.4% | +11.5% |
| SORKIN, DAVID L | 1 | 67.5% | +13.0% |
| PLAKKOOTTAM, DOMINICK L | 1 | 74.5% | +14.8% |
| JARIWALA, CHIRAG | 1 | 62.1% | +27.5% |
| MOLL, NITHYA JANAKIRAMAN | 1 | 67.3% | +13.0% |
| BEMKO, TARAS P | 1 | 84.4% | +19.2% |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18669291 | THREADED TUBULAR MEMBERS EMPLOYING METAL-TO-METAL SEALS | BOCHNA, DAVID | 138d overdue |
| 17432893 | WEAR RESISTANT DRILL PIPE | BEMKO, TARAS P | 72d overdue |
| 19204034 | VIBRATION MITIGATION TOOL | RAILEY, JENNIFER A | 32d overdue |
| 17440289 | THERMAL ANALYSIS OF DRILL BITS | MOLL, NITHYA JANAKIRAMAN | 10d overdue |
| 18569137 | DIRECT FEED PROPPANT SYSTEM | SORKIN, DAVID L | 14d |
| 18347333 | DIRECT LOAD WRIST PIN | JARIWALA, CHIRAG | 29d |
| 19222701 | PROGRESSING CAVITY DEVICES AND ASSEMBLIES FOR COUPLING MULTIPLE STAGES OF PROGRESSING CAVITY DEVICES | DAVIS, MARY ALICE | — |
| 18680394 | PROGRESSIVE CAVITY PUMP ROTOR | OMGBA, ESSAMA | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18669291 | THREADED TUBULAR MEMBERS EMPLOYING METAL-TO-METAL SEALS | BOCHNA, DAVID | 138d overdue |
| 17432893 | WEAR RESISTANT DRILL PIPE | BEMKO, TARAS P | 72d overdue |
| 17440289 | THERMAL ANALYSIS OF DRILL BITS | MOLL, NITHYA JANAKIRAMAN | 10d overdue |
| 18563296 | WEAR RESISTANT TUBULAR MEMBERS AND METHODS AND DEVICES FOR PRODUCING THE SAME | PLAKKOOTTAM, DOMINICK L | 1d overdue |
| 18569137 | DIRECT FEED PROPPANT SYSTEM | SORKIN, DAVID L | 14d |
| 18347333 | DIRECT LOAD WRIST PIN | JARIWALA, CHIRAG | 29d |
| 19222701 | PROGRESSING CAVITY DEVICES AND ASSEMBLIES FOR COUPLING MULTIPLE STAGES OF PROGRESSING CAVITY DEVICES | DAVIS, MARY ALICE | — |
| 18680394 | PROGRESSIVE CAVITY PUMP ROTOR | OMGBA, ESSAMA | — |
| Art Unit | Apps |
|---|---|
| 3746 | 4 |
| 3679 | 2 |
| 3676 | 1 |
| 1774 | 1 |
| 2189 | 1 |
| 3672 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19222701 | PROGRESSING CAVITY DEVICES AND ASSEMBLIES FOR COUPLING MULTIPLE STAGES OF PROGRESSING CAVITY DEVICES | DAVIS, MARY ALICE | 3746 | §102§103 | Non-Final OA | — | Pending | May 29, 2025 |
| 19204034 | VIBRATION MITIGATION TOOL | RAILEY, JENNIFER A | 3676 | §102§103§112 | Final Rejection | 32d overdue | Pending | May 09, 2025 |
| 18680394 | PROGRESSIVE CAVITY PUMP ROTOR | OMGBA, ESSAMA | 3746 | §102§103 | Final Rejection | — | Pending | May 31, 2024 |
| 18669291 | THREADED TUBULAR MEMBERS EMPLOYING METAL-TO-METAL SEALS | BOCHNA, DAVID | 3679 | §103§112 | Final Rejection | 138d overdue | Pending | May 20, 2024 |
| 18650448 | CLOSURE ADAPTER | CHOI, WILLIAM SOON | 3679 | §103§112 | Non-Final OA | — | Pending | Apr 30, 2024 |
| 18569137 | DIRECT FEED PROPPANT SYSTEM | SORKIN, DAVID L | 1774 | §102§103§112 | Non-Final OA | 14d | Pending | Dec 11, 2023 |
| 18563296 | WEAR RESISTANT TUBULAR MEMBERS AND METHODS AND DEVICES FOR PRODUCING THE SAME | PLAKKOOTTAM, DOMINICK L | 3746 | §103 | Final Rejection | 1d overdue | Pending | Nov 21, 2023 |
| 18347333 | DIRECT LOAD WRIST PIN | JARIWALA, CHIRAG | 3746 | §103§112 | Final Rejection | 29d | Pending | Jul 05, 2023 |
| 17440289 | THERMAL ANALYSIS OF DRILL BITS | MOLL, NITHYA JANAKIRAMAN | 2189 | §101Other | Final Rejection | 10d overdue | Pending | Sep 17, 2021 |
| 17432893 | WEAR RESISTANT DRILL PIPE | BEMKO, TARAS P | 3672 | §103§112 | Non-Final OA | 72d overdue | Pending | Aug 20, 2021 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialNational Oilwell Varco L.P. has 10 pending office actions as of October 2026, spread across 6 art units and 10 examiners.
Mary Alice Davis has the most, with 1 of National Oilwell Varco L.P.'s pending office actions.
Mostly Medical Devices & Mechanical Engineering (USPTO Tech Center 3700), based on where its pending office actions are examined.