Prosecution Insights
Last updated: August 14, 2026

Newracom Inc.

11 pending office actions • 3 art units • 11 examiners • 0 of 11 (0%) have an AI response strategy ready • 8 patents granted in the last 365 days

Portfolio Summary

11
Total Pending OAs
10
Non-Final OAs
1
Final Rejections
0
Advisory / Quayle

Case Difficulty Mix

Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.

2
Hard (18%)
9
Medium (82%)
0
Easy (0%)
0
Unknown (0%)

Rejection Statute Mix

BucketCases
§103 only9 (82%)
Multi-statute (no §101)2 (18%)

Industry Mix

How the docket's pending cases split across USPTO tech-center bands.

0
Life Sciences
0% of docket
3
Information Tech
27% of docket
0
Communications
0% of docket
0
Semiconductors
0% of docket
0
Mechanical / Eng
0% of docket
8
Business / Other
73% of docket

Time-on-OA Estimate

Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.

110 h
Manual time on pending OAs
22 h
Time saved (low, 20%)
38 h
Time saved (mid, 35%)
1.0 wks
FTE-weeks freed (mid)

Top Examiners on this docket

ExaminerApps on this docketAllow rateInterview lift
NGUYEN, THUONG 1 68.2% +32.1%
OH, ANDREW CHUNG SUK 1 69.5% +14.6%
WU, JIANYE 1 82.0% +14.5%
MUSA, ABDELNABI O 1 84.1% +20.8%
PARK, CHONGSUH 1 59.8% +18.2%
SAMPAT, RUSHIL PARIMAL 1 88.6% +3.1%
KIM, YEWON 1 88.0% +11.5%
MIAN, OMER S 1 70.2% +53.0%
BAIG, ADNAN 1 68.7% +25.4%
HOUSHMAND, HOOMAN 1 55.5% +23.0%

Quick Wins (3)

Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 3 ordered by deadline are shown.

App #TitleExaminerDue in
18826826 NON-COHERENT JOINT TRANSMISSION (NCJT) SCHEME IN A WIRELESS NETWORK WU, JIANYE
18818391 LOW LATENCY RELAY TRANSMISSIONS WITH SIMULTANEOUS TRANSMIT AND RECEIVE MULTI-LINK DEVICES MUSA, ABDELNABI O
18767775 NON-PRIMARY CHANNEL ACCESS IN WIRELESS NETWORKS SAMPAT, RUSHIL PARIMAL

Hard Cases (2)

Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 2 ordered by deadline are shown.

App #TitleExaminerDue in
18791236 BLOCK ACKNOWLEDGEMENT FOR AGGREGATED PHYSICAL LAYER PROTOCOL DATA UNIT (A-PPDU) OCCUPYING MULTIPLE SUBCHANNELS PARK, CHONGSUH
18753864 AGGREGATED PHYSICAL LAYER PROTOCOL DATA UNIT (A-PPDU) FORMAT FOR WIRELESS NETWORKS KIM, YEWON

Interview Candidates (9)

Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.

App #TitleExaminerDue in
18923546 AMPLIFY-AND-FORWARD RELAY MECHANISM ENABLED BY MULTI-LINK OPERATIONS IN A WIRELESS NETWORK NGUYEN, THUONG
18886794 MULTI-ACCESS POINT (MULTI-AP) JOINT TRANSMISSION IN A WIRELESS NETWORK OH, ANDREW CHUNG SUK
18826826 NON-COHERENT JOINT TRANSMISSION (NCJT) SCHEME IN A WIRELESS NETWORK WU, JIANYE
18818391 LOW LATENCY RELAY TRANSMISSIONS WITH SIMULTANEOUS TRANSMIT AND RECEIVE MULTI-LINK DEVICES MUSA, ABDELNABI O
18791236 BLOCK ACKNOWLEDGEMENT FOR AGGREGATED PHYSICAL LAYER PROTOCOL DATA UNIT (A-PPDU) OCCUPYING MULTIPLE SUBCHANNELS PARK, CHONGSUH
18753864 AGGREGATED PHYSICAL LAYER PROTOCOL DATA UNIT (A-PPDU) FORMAT FOR WIRELESS NETWORKS KIM, YEWON
18731096 POWER SAVE PROTOCOL FOR LOW POWER DEVICE EXPLOITING WAKEUP SIGNAL RECEIVER MIAN, OMER S
18676268 EFFICIENT RESOURCE ALLOCATION AND UTILIZATION IN COORDINATED-TDMA TRANSMISSION BAIG, ADNAN

Top Art Units

Art UnitApps
2461 1
2465 1
2464 1

Pending Office Actions

App #TitleExaminerArt UnitStatutesStatusDue inAIFiled
18923546 AMPLIFY-AND-FORWARD RELAY MECHANISM ENABLED BY MULTI-LINK OPERATIONS IN A WIRELESS NETWORK NGUYEN, THUONG §103 Non-Final OA Pending Oct 22, 2024
18886794 MULTI-ACCESS POINT (MULTI-AP) JOINT TRANSMISSION IN A WIRELESS NETWORK OH, ANDREW CHUNG SUK §103 Non-Final OA Pending Sep 16, 2024
18826826 NON-COHERENT JOINT TRANSMISSION (NCJT) SCHEME IN A WIRELESS NETWORK WU, JIANYE §103 Non-Final OA Pending Sep 06, 2024
18818391 LOW LATENCY RELAY TRANSMISSIONS WITH SIMULTANEOUS TRANSMIT AND RECEIVE MULTI-LINK DEVICES MUSA, ABDELNABI O §103 Non-Final OA Pending Aug 28, 2024
18791236 BLOCK ACKNOWLEDGEMENT FOR AGGREGATED PHYSICAL LAYER PROTOCOL DATA UNIT (A-PPDU) OCCUPYING MULTIPLE SUBCHANNELS PARK, CHONGSUH §103§112 Non-Final OA Pending Jul 31, 2024
18767775 NON-PRIMARY CHANNEL ACCESS IN WIRELESS NETWORKS SAMPAT, RUSHIL PARIMAL §103 Non-Final OA Pending Jul 09, 2024
18753864 AGGREGATED PHYSICAL LAYER PROTOCOL DATA UNIT (A-PPDU) FORMAT FOR WIRELESS NETWORKS KIM, YEWON §102§112 Non-Final OA Pending Jun 25, 2024
18731096 POWER SAVE PROTOCOL FOR LOW POWER DEVICE EXPLOITING WAKEUP SIGNAL RECEIVER MIAN, OMER S §103 Non-Final OA Pending May 31, 2024
18676268 EFFICIENT RESOURCE ALLOCATION AND UTILIZATION IN COORDINATED-TDMA TRANSMISSION BAIG, ADNAN 2461 §103 Non-Final OA Pending May 28, 2024
18665434 MULTI-CHANNEL OPERATION IN WIRELESS NETWORKS HOUSHMAND, HOOMAN 2465 §103 Non-Final OA Pending May 15, 2024
18632828 TRANSMITTING DIFFERENTIAL PHYSIAL LAYER PROTOCOL DATA UNITS (PPDUS) TO ALLOW LOW LATENCY TRANSMISSION NG, CHRISTINE Y 2464 §103 Final Rejection Pending Apr 11, 2024

Managing Newracom Inc.'s Patent Portfolio?

IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.

Start Free Trial

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month