5 pending office actions • 4 art units • 4 examiners • 0 of 5 (0%) have an AI response strategy ready • 4 patents granted in the last 365 days
Based on the USPTO statutory response window for each pending office action. 2 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §103 only | 2 (40%) |
| Multi-statute (no §101) | 2 (40%) |
| No statute on record | 1 (20%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| WALLACE, KIPP CHARLES | 2 | 78.4% | +25.5% |
| HEWITT, JAMES M | 1 | 69.4% | +45.3% |
| LUK, VANESSA TIBAY | 1 | 54.1% | +26.6% |
| SIDDIQUI, ADIL ABDUL WAJID | 1 | 54.6% | +13.0% |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 2 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19105975 | END PIECE OF DRILL PIPE, DRILL PIPE ASSEMBLY AND METHOD | HEWITT, JAMES M | 42d overdue |
| 18578454 | CEMENTED CARBIDE INSERT FOR MINING OR CUTTING APPLICATIONS COMPRISING GAMMA PHASE CARBIDE | LUK, VANESSA TIBAY | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 5 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19105975 | END PIECE OF DRILL PIPE, DRILL PIPE ASSEMBLY AND METHOD | HEWITT, JAMES M | 42d overdue |
| 18834245 | DRILLING COMPONENT | WALLACE, KIPP CHARLES | 24d overdue |
| 18992623 | ROCK DRILL INSERT | WALLACE, KIPP CHARLES | — |
| 18578454 | CEMENTED CARBIDE INSERT FOR MINING OR CUTTING APPLICATIONS COMPRISING GAMMA PHASE CARBIDE | LUK, VANESSA TIBAY | — |
| 18561763 | METHOD AND APPARATUS FOR EXTRACTION OF CEMENTED CARBIDE BODIES FROM A COMPONENT | SIDDIQUI, ADIL ABDUL WAJID | — |
| Art Unit | Apps |
|---|---|
| 3674 | 2 |
| 3679 | 1 |
| 1733 | 1 |
| 1735 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19105975 | END PIECE OF DRILL PIPE, DRILL PIPE ASSEMBLY AND METHOD | HEWITT, JAMES M | 3679 | §102§103 | Final Rejection | 42d overdue | Pending | Feb 24, 2025 |
| 18992623 | ROCK DRILL INSERT | WALLACE, KIPP CHARLES | 3674 | §103 | Non-Final OA | — | Pending | Jan 09, 2025 |
| 18834245 | DRILLING COMPONENT | WALLACE, KIPP CHARLES | 3674 | Other | Final Rejection | 24d overdue | Pending | Jul 30, 2024 |
| 18578454 | CEMENTED CARBIDE INSERT FOR MINING OR CUTTING APPLICATIONS COMPRISING GAMMA PHASE CARBIDE | LUK, VANESSA TIBAY | 1733 | §103§112 | Non-Final OA | — | Pending | Jan 11, 2024 |
| 18561763 | METHOD AND APPARATUS FOR EXTRACTION OF CEMENTED CARBIDE BODIES FROM A COMPONENT | SIDDIQUI, ADIL ABDUL WAJID | 1735 | §103 | Non-Final OA | — | Pending | Nov 17, 2023 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial