Prosecution Insights
Last updated: October 04, 2026

Shanghai Nuclear Engineering Research & Design Institute Co. Ltd.

Technology area: Transportation, E-Commerce & Mechanical Systems

4 pending office actions • 2 art units • 3 examiners • 0 of 4 (0%) have an AI response strategy ready • 2 patents granted in the last 365 days

Analysis

Shanghai Nuclear Engineering Research & Design Institute Co. Ltd. currently manages 4 pending office actions within the Transportation, E-Commerce & Mechanical Systems technology area. This prosecution activity is distributed across 2 distinct art units. The presence of multiple art units indicates that the company's innovations are being evaluated by different specialized groups within the patent office. The Transportation, E-Commerce & Mechanical Systems technology area encompasses all of the company's current pending work.

The portfolio involves 3 distinct examiners, with HIJAZ, OMAR F identified as the busiest examiner for this company. HIJAZ, OMAR F is responsible for 2 of the pending office actions. The 4 pending office actions represent the current active challenges for the company. Practitioners should note that while the examiner pool consists of 3 distinct examiners, the workload is distributed such that the busiest examiner handles more actions than the other distinct examiners.

Written from this page's own data; every figure is computed from USPTO records and verified before publication.

Portfolio Summary

4
Total Pending OAs
4
Non-Final OAs
0
Final Rejections
0
Advisory / Quayle

Case Difficulty Mix

Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.

2
Hard (50%)
2
Medium (50%)
0
Easy (0%)
0
Unknown (0%)

Rejection Statute Mix

BucketCases
§103 only2 (50%)
Multi-statute (no §101)2 (50%)

Industry Mix

How the docket's pending cases split across USPTO tech-center bands.

0
Life Sciences
0% of docket
0
Information Tech
0% of docket
0
Communications
0% of docket
0
Semiconductors
0% of docket
3
Mechanical / Eng
75% of docket
1
Business / Other
25% of docket

Time-on-OA Estimate

Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.

40 h
Manual time on pending OAs
8 h
Time saved (low, 20%)
14 h
Time saved (mid, 35%)
0.3 wks
FTE-weeks freed (mid)

Top Examiners on this docket

ExaminerApps on this docketAllow rateInterview lift
HIJAZ, OMAR F 2 55.5% +35.4%
WASIL, DANIEL D 1 79.9% +24.7%
GARNER, LILY CRABTREE 1 68.2% +16.2%

Hard Cases (2)

Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 2 ordered by deadline are shown.

App #TitleExaminerDue in
19101186 INTEGRATED REACTOR, AND CHARGING AND REFUELING SYSTEM AND METHOD WASIL, DANIEL D —
18555354 TARGET AND TARGET GROUP USED FOR HEAVY WATER REACTOR PRODUCTION OF C-14 ISOTOPES GARNER, LILY CRABTREE —

Interview Candidates (4)

Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 4 ordered by deadline are shown.

App #TitleExaminerDue in
19101186 INTEGRATED REACTOR, AND CHARGING AND REFUELING SYSTEM AND METHOD WASIL, DANIEL D —
18558338 CAST-IN-PLACE COMPOSITE SHIELDING SHELL WITH ULTRA-HIGH PERFORMANCE CONCRETE (UHPC) HIJAZ, OMAR F —
18558326 SEMI-FABRICATED COMPOSITE SHIELDING SHELL WITH ULTRA-HIGH PERFORMANCE CONCRETE (UHPC) HIJAZ, OMAR F —
18555354 TARGET AND TARGET GROUP USED FOR HEAVY WATER REACTOR PRODUCTION OF C-14 ISOTOPES GARNER, LILY CRABTREE —

Top Art Units

Art UnitApps
3635 2
3646 1

Pending Office Actions

App #TitleExaminerArt UnitStatutesStatusDue inAIFiled
19101186 INTEGRATED REACTOR, AND CHARGING AND REFUELING SYSTEM AND METHOD WASIL, DANIEL D — §103§112 Non-Final OA — Pending Feb 04, 2025
18558338 CAST-IN-PLACE COMPOSITE SHIELDING SHELL WITH ULTRA-HIGH PERFORMANCE CONCRETE (UHPC) HIJAZ, OMAR F 3635 §103 Non-Final OA — Pending Oct 31, 2023
18558326 SEMI-FABRICATED COMPOSITE SHIELDING SHELL WITH ULTRA-HIGH PERFORMANCE CONCRETE (UHPC) HIJAZ, OMAR F 3635 §103 Non-Final OA — Pending Oct 31, 2023
18555354 TARGET AND TARGET GROUP USED FOR HEAVY WATER REACTOR PRODUCTION OF C-14 ISOTOPES GARNER, LILY CRABTREE 3646 §103§112 Non-Final OA — Pending Oct 13, 2023

Managing Shanghai Nuclear Engineering Research & Design Institute Co. Ltd.'s Patent Portfolio?

IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.

Start Free Trial

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month