Tech Center 3600 • Art Units: 3619 3633 3635
This examiner grants 56% of resolved cases
Omar F. Hijaz examines applications in Tech Center 3600 and Art Unit 3619, with a total of 789 resolved cases. His allowance rate of 55.5% presents a balanced prosecution landscape for applicants. The median days to allowance is 1046, which is the typical timeframe for cases that reach a grant. These metrics, derived from 789 resolved cases, offer a reliable preview of the expected duration and success probability for matters on his docket.
The interview lift pct of 35.4% is a significant factor for practitioners to integrate into their strategy. This figure represents the increase in allowance probability when an interview is conducted. Because the baseline allowance rate is 55.5%, the 35.4% lift suggests that interviews are highly effective at bridging the gap between a rejection and a grant. With a median days to allowance of 1046, practitioners can use these interviews to potentially resolve issues more quickly than the average timeline suggests.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 17179156 | TRUSS FOUNDATIONS FOR SINGLE-AXIS TRACKERS | Non-Final OA | Nextpower LLC |
| 18841541 | FOLDABLE PHYSICAL STRUCTURES | Non-Final OA | University of Maine System Board of Trustees |
| 18840219 | Monopole Tower Assembly | Non-Final OA | Amplitel Pty Ltd |
| 18594663 | TILE AND SUPPORT STRUCTURE | Final Rejection | MBRICO, LLC |
| 18645133 | SEALING LOUVERS FOR ROOF STRUCTURES | Non-Final OA | ALUMAWOOD OUTDOOR LIVING LLC |
| 18691178 | POST-TENSIONED EXPANDING CONCRETE WITH FIBERS FOR SLABS | Non-Final OA | CCL STRESSING INTERNATIONAL LTD |
| 18269342 | POST-TENSIONED CONCRETE WITH FIBERS FOR LONG STRIPS | Final Rejection | CCL STRESSING INTERNATIONAL LTD |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy