6 pending office actions • 5 art units • 5 examiners • 0 of 6 (0%) have an AI response strategy ready • 7 patents granted in the last 365 days
Based on the USPTO statutory response window for each pending office action. 6 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 6 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §103 only | 3 (50%) |
| §102 only | 2 (33%) |
| No statute on record | 1 (17%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| CANNON, RYAN SMITH | 2 | 55.1% | +36.7% |
| GANI, OBAIDUL NMN | 1 | — | — |
| KOUSAR, SADIA | 1 | 64.7% | +10.3% |
| CASS, JEAN PAUL | 1 | 73.3% | +25.5% |
| WHITE, SADIE | 1 | 48.7% | +32.7% |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 5 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19021810 | LEAD ASSEMBLY FOR CONNECTING SOLAR PANEL ARRAYS TO INVERTER | CANNON, RYAN SMITH | 103d overdue |
| 18309765 | EV CHARGER SYSTEM POWER PLATFORM | CASS, JEAN PAUL | 18d overdue |
| 18739127 | LEAD ASSEMBLY FOR CONNECTING SOLAR PANEL ARRAYS TO INVERTER | CANNON, RYAN SMITH | 3d overdue |
| 18309766 | SYSTEMS AND METHODS FOR DEPLOYMENT OF AN ELECTRIC VEHICLE CHARGER SYSTEM | KOUSAR, SADIA | 39d |
| 18295827 | SOLAR CABLE RETENTION CLIPS AND SYSTEMS | WHITE, SADIE | 49d |
| Art Unit | Apps |
|---|---|
| 1726 | 2 |
| 2847 | 1 |
| 2859 | 1 |
| 3666 | 1 |
| 1721 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19021810 | LEAD ASSEMBLY FOR CONNECTING SOLAR PANEL ARRAYS TO INVERTER | CANNON, RYAN SMITH | 1726 | Other | Non-Final OA | 103d overdue | Pending | Jan 15, 2025 |
| 18739127 | LEAD ASSEMBLY FOR CONNECTING SOLAR PANEL ARRAYS TO INVERTER | CANNON, RYAN SMITH | 1726 | §103 | Final Rejection | 3d overdue | Pending | Jun 10, 2024 |
| 18659855 | CABLE MANAGEMENT SYSTEMS | GANI, OBAIDUL NMN | 2847 | §102 | Non-Final OA | 27d | Pending | May 09, 2024 |
| 18309766 | SYSTEMS AND METHODS FOR DEPLOYMENT OF AN ELECTRIC VEHICLE CHARGER SYSTEM | KOUSAR, SADIA | 2859 | §103 | Non-Final OA | 39d | Pending | Apr 28, 2023 |
| 18309765 | EV CHARGER SYSTEM POWER PLATFORM | CASS, JEAN PAUL | 3666 | §103 | Non-Final OA | 18d overdue | Pending | Apr 28, 2023 |
| 18295827 | SOLAR CABLE RETENTION CLIPS AND SYSTEMS | WHITE, SADIE | 1721 | §102 | Final Rejection | 49d | Pending | Apr 04, 2023 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial