Technology areas: Transportation, E-Commerce & Mechanical Systems • Medical Devices & Mechanical Engineering
11 pending office actions • 6 art units • 10 examiners • 0 of 11 (0%) have an AI response strategy ready • 15 patents granted in the last 365 days
Siemens Gamesa Renewable Energy Innovation & Technology S L has 12 pending office actions in Medical Devices & Mechanical Engineering. The docket involves 11 distinct examiners and 6 distinct art units, showing broad examiner distribution with more concentrated technical-unit coverage.
WONG, ELTON K is the busiest examiner, with 2 pending matters. Most matters are assigned to other examiners, so a single relationship does not define the portfolio. Counsel should organize the docket around shared technical themes while accounting for the different examiner approaches represented within the six art-unit assignments.
Based on the USPTO statutory response window for each pending office action. 1 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §103 only | 3 (27%) |
| §112 only | 1 (9%) |
| Multi-statute (no §101) | 7 (64%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| WONG, ELTON K | 2 | 78.2% | +18.9% |
| ADJAGBE, MAXIME M | 1 | 84.1% | +9.7% |
| CORDAY, CAMERON A | 1 | 77.0% | +1.0% |
| KIM, SANG K | 1 | 81.5% | +10.3% |
| HARRIS, ZACHARY PRATT | 1 | — | — |
| GUGGER, SEAN A | 1 | 64.9% | +23.2% |
| LU, HUA | 1 | 69.3% | +26.5% |
| MUDD, HENRY HOOPER | 1 | 70.0% | +24.5% |
| HIJAZ, OMAR F | 1 | 55.5% | +35.4% |
| SAUNCY, TONI DIAN | 1 | 86.2% | +18.4% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18017682 | DETECTION OF ISLANDING OPERATION | SAUNCY, TONI DIAN | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 7 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18837971 | TOWER CONNECTOR | MUDD, HENRY HOOPER | 9d overdue |
| 19481340 | SPAR CAP, WIND TURBINE BLADE AS WELL AS METHOD OF MANUFACTURING A SPAR CAP | ADJAGBE, MAXIME M | — |
| 19481055 | METHOD FOR RETROFITTING SECURING MEANS FOR SECURING MOUNTING INSERTS EMBEDDED IN A ROOT OF WIND TURBINE BLADE | WONG, ELTON K | — |
| 19144967 | METHOD FOR TRANSPORTING A WIND TURBINE BLADE | CORDAY, CAMERON A | — |
| 19139378 | FLOW MODIFYING ELEMENT FOR WIND TURBINE BLADE | KIM, SANG K | — |
| 19110021 | TOWER FOR A WIND TURBINE, WIND TURBINE AND METHOD FOR MANUFACTURING A TOWER OF A WIND TURBINE | HARRIS, ZACHARY PRATT | — |
| 18874114 | CONTROLLING A WIND TURBINE DURING LOW VOLTAGE EVENTS | GUGGER, SEAN A | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18837971 | TOWER CONNECTOR | MUDD, HENRY HOOPER | 9d overdue |
| 19481055 | METHOD FOR RETROFITTING SECURING MEANS FOR SECURING MOUNTING INSERTS EMBEDDED IN A ROOT OF WIND TURBINE BLADE | WONG, ELTON K | — |
| 19139378 | FLOW MODIFYING ELEMENT FOR WIND TURBINE BLADE | KIM, SANG K | — |
| 19136329 | FLOW MODIFYING ELEMENT FOR A WIND TURBINE BLADE | WONG, ELTON K | — |
| 18874114 | CONTROLLING A WIND TURBINE DURING LOW VOLTAGE EVENTS | GUGGER, SEAN A | — |
| 18837942 | Method of Power Management of a Power Plant | LU, HUA | — |
| 18301337 | FOUNDATION FOR A WIND TURBINE WITH FIBER REINFORCED CONCRETE | HIJAZ, OMAR F | — |
| 18017682 | DETECTION OF ISLANDING OPERATION | SAUNCY, TONI DIAN | — |
| Art Unit | Apps |
|---|---|
| 3745 | 5 |
| 3635 | 2 |
| 2834 | 1 |
| 2118 | 1 |
| 3642 | 1 |
| 2857 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19481340 | SPAR CAP, WIND TURBINE BLADE AS WELL AS METHOD OF MANUFACTURING A SPAR CAP | ADJAGBE, MAXIME M | 3745 | §102§103§112 | Non-Final OA | — | Pending | Nov 04, 2025 |
| 19481055 | METHOD FOR RETROFITTING SECURING MEANS FOR SECURING MOUNTING INSERTS EMBEDDED IN A ROOT OF WIND TURBINE BLADE | WONG, ELTON K | 3745 | §103§112 | Non-Final OA | — | Pending | Nov 03, 2025 |
| 19144967 | METHOD FOR TRANSPORTING A WIND TURBINE BLADE | CORDAY, CAMERON A | 3745 | §102§103 | Non-Final OA | — | Pending | Jul 01, 2025 |
| 19139378 | FLOW MODIFYING ELEMENT FOR WIND TURBINE BLADE | KIM, SANG K | 3745 | §102§103§112 | Non-Final OA | — | Pending | Jun 16, 2025 |
| 19136329 | FLOW MODIFYING ELEMENT FOR A WIND TURBINE BLADE | WONG, ELTON K | 3745 | §112 | Non-Final OA | — | Pending | Jun 06, 2025 |
| 19110021 | TOWER FOR A WIND TURBINE, WIND TURBINE AND METHOD FOR MANUFACTURING A TOWER OF A WIND TURBINE | HARRIS, ZACHARY PRATT | 3635 | §102§103§112 | Non-Final OA | — | Pending | Mar 07, 2025 |
| 18874114 | CONTROLLING A WIND TURBINE DURING LOW VOLTAGE EVENTS | GUGGER, SEAN A | 2834 | §102§103§112 | Non-Final OA | — | Pending | Dec 12, 2024 |
| 18837942 | Method of Power Management of a Power Plant | LU, HUA | 2118 | §103 | Non-Final OA | — | Pending | Aug 13, 2024 |
| 18837971 | TOWER CONNECTOR | MUDD, HENRY HOOPER | 3642 | §103§112 | Non-Final OA | 9d overdue | Pending | Aug 13, 2024 |
| 18301337 | FOUNDATION FOR A WIND TURBINE WITH FIBER REINFORCED CONCRETE | HIJAZ, OMAR F | 3635 | §103Other | Final Rejection | — | Pending | Apr 17, 2023 |
| 18017682 | DETECTION OF ISLANDING OPERATION | SAUNCY, TONI DIAN | 2857 | §103 | Final Rejection | — | Pending | Jan 24, 2023 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialSiemens Gamesa Renewable Energy Innovation & Technology S L has 11 pending office actions as of October 2026, spread across 6 art units and 10 examiners.
Elton K Wong has the most, with 2 of Siemens Gamesa Renewable Energy Innovation & Technology S L's pending office actions.
Mostly Medical Devices & Mechanical Engineering (USPTO Tech Center 3700), based on where its pending office actions are examined.