Prosecution Insights
Last updated: October 26, 2026

Siemens Gamesa Renewable Energy Innovation & Technology S L

Technology areas: Transportation, E-Commerce & Mechanical Systems • Medical Devices & Mechanical Engineering

11 pending office actions • 6 art units • 10 examiners • 0 of 11 (0%) have an AI response strategy ready • 15 patents granted in the last 365 days

Analysis

Siemens Gamesa Renewable Energy Innovation & Technology S L has 12 pending office actions in Medical Devices & Mechanical Engineering. The docket involves 11 distinct examiners and 6 distinct art units, showing broad examiner distribution with more concentrated technical-unit coverage.

WONG, ELTON K is the busiest examiner, with 2 pending matters. Most matters are assigned to other examiners, so a single relationship does not define the portfolio. Counsel should organize the docket around shared technical themes while accounting for the different examiner approaches represented within the six art-unit assignments.

Written from this page's own data; every figure is computed from USPTO records and verified before publication.

Portfolio Summary

11
Total Pending OAs
9
Non-Final OAs
2
Final Rejections
0
Advisory / Quayle

Response Deadline Pressure

Based on the USPTO statutory response window for each pending office action. 1 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.

1
Overdue
0
Due this week
0
Due this month
0
Due in next 60 days
0
Due later

Case Difficulty Mix

Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.

7
Hard (64%)
3
Medium (27%)
1
Easy (9%)
0
Unknown (0%)

Rejection Statute Mix

BucketCases
§103 only3 (27%)
§112 only1 (9%)
Multi-statute (no §101)7 (64%)

Industry Mix

How the docket's pending cases split across USPTO tech-center bands.

0
Life Sciences
0% of docket
1
Information Tech
9% of docket
0
Communications
0% of docket
2
Semiconductors
18% of docket
8
Mechanical / Eng
73% of docket
0
Business / Other
0% of docket

Time-on-OA Estimate

Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.

110 h
Manual time on pending OAs
22 h
Time saved (low, 20%)
38 h
Time saved (mid, 35%)
1.0 wks
FTE-weeks freed (mid)

Top Examiners on this docket

ExaminerApps on this docketAllow rateInterview lift
WONG, ELTON K 2 78.2% +18.9%
ADJAGBE, MAXIME M 1 84.1% +9.7%
CORDAY, CAMERON A 1 77.0% +1.0%
KIM, SANG K 1 81.5% +10.3%
HARRIS, ZACHARY PRATT 1 — —
GUGGER, SEAN A 1 64.9% +23.2%
LU, HUA 1 69.3% +26.5%
MUDD, HENRY HOOPER 1 70.0% +24.5%
HIJAZ, OMAR F 1 55.5% +35.4%
SAUNCY, TONI DIAN 1 86.2% +18.4%

Quick Wins (1)

Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 1 ordered by deadline are shown.

App #TitleExaminerDue in
18017682 DETECTION OF ISLANDING OPERATION SAUNCY, TONI DIAN —

Hard Cases (7)

Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 7 ordered by deadline are shown.

App #TitleExaminerDue in
18837971 TOWER CONNECTOR MUDD, HENRY HOOPER 9d overdue
19481340 SPAR CAP, WIND TURBINE BLADE AS WELL AS METHOD OF MANUFACTURING A SPAR CAP ADJAGBE, MAXIME M —
19481055 METHOD FOR RETROFITTING SECURING MEANS FOR SECURING MOUNTING INSERTS EMBEDDED IN A ROOT OF WIND TURBINE BLADE WONG, ELTON K —
19144967 METHOD FOR TRANSPORTING A WIND TURBINE BLADE CORDAY, CAMERON A —
19139378 FLOW MODIFYING ELEMENT FOR WIND TURBINE BLADE KIM, SANG K —
19110021 TOWER FOR A WIND TURBINE, WIND TURBINE AND METHOD FOR MANUFACTURING A TOWER OF A WIND TURBINE HARRIS, ZACHARY PRATT —
18874114 CONTROLLING A WIND TURBINE DURING LOW VOLTAGE EVENTS GUGGER, SEAN A —

Interview Candidates (8)

Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.

App #TitleExaminerDue in
18837971 TOWER CONNECTOR MUDD, HENRY HOOPER 9d overdue
19481055 METHOD FOR RETROFITTING SECURING MEANS FOR SECURING MOUNTING INSERTS EMBEDDED IN A ROOT OF WIND TURBINE BLADE WONG, ELTON K —
19139378 FLOW MODIFYING ELEMENT FOR WIND TURBINE BLADE KIM, SANG K —
19136329 FLOW MODIFYING ELEMENT FOR A WIND TURBINE BLADE WONG, ELTON K —
18874114 CONTROLLING A WIND TURBINE DURING LOW VOLTAGE EVENTS GUGGER, SEAN A —
18837942 Method of Power Management of a Power Plant LU, HUA —
18301337 FOUNDATION FOR A WIND TURBINE WITH FIBER REINFORCED CONCRETE HIJAZ, OMAR F —
18017682 DETECTION OF ISLANDING OPERATION SAUNCY, TONI DIAN —

Top Art Units

Art UnitApps
3745 5
3635 2
2834 1
2118 1
3642 1
2857 1

Pending Office Actions

App #TitleExaminerArt UnitStatutesStatusDue inAIFiled
19481340 SPAR CAP, WIND TURBINE BLADE AS WELL AS METHOD OF MANUFACTURING A SPAR CAP ADJAGBE, MAXIME M 3745 §102§103§112 Non-Final OA — Pending Nov 04, 2025
19481055 METHOD FOR RETROFITTING SECURING MEANS FOR SECURING MOUNTING INSERTS EMBEDDED IN A ROOT OF WIND TURBINE BLADE WONG, ELTON K 3745 §103§112 Non-Final OA — Pending Nov 03, 2025
19144967 METHOD FOR TRANSPORTING A WIND TURBINE BLADE CORDAY, CAMERON A 3745 §102§103 Non-Final OA — Pending Jul 01, 2025
19139378 FLOW MODIFYING ELEMENT FOR WIND TURBINE BLADE KIM, SANG K 3745 §102§103§112 Non-Final OA — Pending Jun 16, 2025
19136329 FLOW MODIFYING ELEMENT FOR A WIND TURBINE BLADE WONG, ELTON K 3745 §112 Non-Final OA — Pending Jun 06, 2025
19110021 TOWER FOR A WIND TURBINE, WIND TURBINE AND METHOD FOR MANUFACTURING A TOWER OF A WIND TURBINE HARRIS, ZACHARY PRATT 3635 §102§103§112 Non-Final OA — Pending Mar 07, 2025
18874114 CONTROLLING A WIND TURBINE DURING LOW VOLTAGE EVENTS GUGGER, SEAN A 2834 §102§103§112 Non-Final OA — Pending Dec 12, 2024
18837942 Method of Power Management of a Power Plant LU, HUA 2118 §103 Non-Final OA — Pending Aug 13, 2024
18837971 TOWER CONNECTOR MUDD, HENRY HOOPER 3642 §103§112 Non-Final OA 9d overdue Pending Aug 13, 2024
18301337 FOUNDATION FOR A WIND TURBINE WITH FIBER REINFORCED CONCRETE HIJAZ, OMAR F 3635 §103Other Final Rejection — Pending Apr 17, 2023
18017682 DETECTION OF ISLANDING OPERATION SAUNCY, TONI DIAN 2857 §103 Final Rejection — Pending Jan 24, 2023

Managing Siemens Gamesa Renewable Energy Innovation & Technology S L's Patent Portfolio?

IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.

Start Free Trial

Frequently Asked Questions

How many pending USPTO office actions does Siemens Gamesa Renewable Energy Innovation & Technology S L have?

Siemens Gamesa Renewable Energy Innovation & Technology S L has 11 pending office actions as of October 2026, spread across 6 art units and 10 examiners.

Which USPTO examiner handles the most Siemens Gamesa Renewable Energy Innovation & Technology S L applications?

Elton K Wong has the most, with 2 of Siemens Gamesa Renewable Energy Innovation & Technology S L's pending office actions.

What technology area are Siemens Gamesa Renewable Energy Innovation & Technology S L's patent applications in?

Mostly Medical Devices & Mechanical Engineering (USPTO Tech Center 3700), based on where its pending office actions are examined.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month