Prosecution Insights
Last updated: August 06, 2026

Siemens Gamesa Renewable Energy Innovation & Technology S L

6 pending office actions • 4 art units • 6 examiners • 0 of 6 (0%) have an AI response strategy ready • 20 patents granted in the last 365 days

Portfolio Summary

6
Total Pending OAs
4
Non-Final OAs
1
Final Rejections
1
Advisory / Quayle

Response Deadline Pressure

Based on the USPTO statutory response window for each pending office action. 3 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.

2
Overdue
0
Due this week
0
Due this month
1
Due in next 60 days
0
Due later

Deadline Fire Line

Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 3 of the docket's apps have a known mailing date.

-30dToday30d60d90d120d
Overdue (2)Due ≤ 60 days (1)

Case Difficulty Mix

Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.

1
Hard (17%)
3
Medium (50%)
2
Easy (33%)
0
Unknown (0%)

Rejection Statute Mix

BucketCases
§103 only3 (50%)
§112 only2 (33%)
Multi-statute (no §101)1 (17%)

Industry Mix

How the docket's pending cases split across USPTO tech-center bands.

0
Life Sciences
0% of docket
1
Information Tech
17% of docket
0
Communications
0% of docket
0
Semiconductors
0% of docket
4
Mechanical / Eng
67% of docket
1
Business / Other
17% of docket

Time-on-OA Estimate

Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.

60 h
Manual time on pending OAs
12 h
Time saved (low, 20%)
21 h
Time saved (mid, 35%)
0.5 wks
FTE-weeks freed (mid)

Top Examiners on this docket

ExaminerApps on this docketAllow rateInterview lift
CLARK, RYAN C 1 88.1% +8.2%
MUDD, HENRY HOOPER 1 70.2% +24.0%
ERDMAN, CHAD G 1 80.1% +18.1%
LAMBERT, WAYNE A 1 62.3% +23.1%
KARIM, ZIAUL 1 81.8% +21.9%
HIJAZ, OMAR F 1 55.6% +35.2%

Quick Wins (3)

Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 3 ordered by deadline are shown.

App #TitleExaminerDue in
18279467 DYNAMICALLY OBTAINING MAXIMUM CAPACITIES IN A DFIM ELECTRIC DRIVE KARIM, ZIAUL 60d
19100219 WIND TURBINE BLADE, MOLD, MANUFACTURING ARRANGEMENT AND METHOD FOR MANUFACTURING A WIND TURBINE BLADE CLARK, RYAN C
18836423 METHOD OF POWER MANAGEMENT OF A POWER PLANT ERDMAN, CHAD G

Hard Cases (1)

Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 1 ordered by deadline are shown.

App #TitleExaminerDue in
18837971 TOWER CONNECTOR MUDD, HENRY HOOPER 9d overdue

Interview Candidates (5)

Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 5 ordered by deadline are shown.

App #TitleExaminerDue in
18635179 STABILITY COMPONENT, USE OF A STABILITY COMPONENT, WIND TURBINE BLADE AND METHODS OF MANUFACTURING A WIND TURBINE BLADE LAMBERT, WAYNE A 22d overdue
18837971 TOWER CONNECTOR MUDD, HENRY HOOPER 9d overdue
18279467 DYNAMICALLY OBTAINING MAXIMUM CAPACITIES IN A DFIM ELECTRIC DRIVE KARIM, ZIAUL 60d
18836423 METHOD OF POWER MANAGEMENT OF A POWER PLANT ERDMAN, CHAD G
18301337 FOUNDATION FOR A WIND TURBINE WITH FIBER REINFORCED CONCRETE HIJAZ, OMAR F

Top Art Units

Art UnitApps
3745 2
3642 1
2119 1
3635 1

Pending Office Actions

App #TitleExaminerArt UnitStatutesStatusDue inAIFiled
19100219 WIND TURBINE BLADE, MOLD, MANUFACTURING ARRANGEMENT AND METHOD FOR MANUFACTURING A WIND TURBINE BLADE CLARK, RYAN C 3745 §112Other Non-Final OA Pending Jan 31, 2025
18837971 TOWER CONNECTOR MUDD, HENRY HOOPER 3642 §103§112 Non-Final OA 9d overdue Pending Aug 13, 2024
18836423 METHOD OF POWER MANAGEMENT OF A POWER PLANT ERDMAN, CHAD G §103 Non-Final OA Pending Aug 07, 2024
18635179 STABILITY COMPONENT, USE OF A STABILITY COMPONENT, WIND TURBINE BLADE AND METHODS OF MANUFACTURING A WIND TURBINE BLADE LAMBERT, WAYNE A 3745 §103 Non-Final OA 22d overdue Pending Apr 15, 2024
18279467 DYNAMICALLY OBTAINING MAXIMUM CAPACITIES IN A DFIM ELECTRIC DRIVE KARIM, ZIAUL 2119 §112 Non-Final OA 60d Pending Aug 30, 2023
18301337 FOUNDATION FOR A WIND TURBINE WITH FIBER REINFORCED CONCRETE HIJAZ, OMAR F 3635 §103Other Final Rejection Pending Apr 17, 2023

Managing Siemens Gamesa Renewable Energy Innovation & Technology S L's Patent Portfolio?

IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.

Start Free Trial

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month